PartyWallAgreement.org.uk

Example Schedule of Condition Report

A fictional, completed example so you can see what a schedule of condition looks like.

EXAMPLE ONLY - FICTIONAL PROPERTY

Schedule of condition

Property: 14 Sample Terrace, Anytown AB1 2CD (adjoining owner)
Building owner's works: Loft conversion at 12 Sample Terrace
Inspected: [date], 10:30, dry weather
Present: Adjoining owner; surveyor

RefLocationElementCondition notedPhoto
1.1Loft spaceParty wall (brickwork, painted)Sound. Hairline crack, about 1 mm, running diagonally near chimney breast. No movement marks.P01-P03
2.1First floor rear bedroomCeiling, party wall sidePlaster sound. Old paint stain about 200 mm across, dry to touch.P04
2.2First floor rear bedroomParty wall (plaster)Sound. Slight hairline crack at junction with ceiling.P05
3.1Ground floor loungeChimney breastSound. No cracks visible. Wallpaper in good condition.P06
4.1Rear gardenBoundary wallLean of about 5 mm noted at top, pointing weathered. Moss growth.P07-P08

Notes: Measurements taken with a crack gauge and tape. Photographs are dated and referenced above. Both owners sign and keep a copy. Later damage is judged against this record.

What a good schedule includes

  • Every room and area the works could affect, including the outside.
  • Dated photographs that match the written references.
  • Crack widths, positions and whether they look old or new.
  • Signatures from both owners or their surveyors.

This page is general information about the Party Wall etc. Act 1996 (England and Wales). It is not legal advice. Every property and dispute is different, so take advice from a party wall surveyor or a solicitor before you act. Tools produce drafts to help you. Have important documents checked by a party wall surveyor or solicitor.