The basics 19
What is a party wall?
A party wall is a wall shared by two properties that belong to different owners. Section 20 of the Party Wall etc. Act 1996 covers two kinds: a wall that stands astride the boundary and forms part of a building, and a wall that stands wholly on one owner's land but separates buildings belonging to different owners.
The everyday example is the wall between two semi-detached or terraced houses. In the second kind, only the section of wall that actually divides the two buildings counts as party wall; any part that rises above or extends beyond the neighbouring building does not. The Act also has rules for party fence walls and party structures, explained in our guide to the Party Wall Act 1996.
What is the Party Wall etc. Act 1996?
The Party Wall etc. Act 1996 is the law in England and Wales that sets out how building owners must notify neighbours before certain work to shared walls, new walls on the boundary and excavations near a neighbour's building. It came into force on 1 July 1997.
The Act gives you rights to carry out that work, even if your neighbour would rather you didn't, but only after serving written notice and following its procedure. In return, it protects the neighbour: disagreements are settled by impartial surveyors through a binding award, and you must make good or pay for any damage your work causes. It does not replace planning permission or Building Regulations. You can read the full text of the Act or start with our plain-English guide to the Act.
What is a party wall agreement?
A party wall agreement is the everyday name for the document that lets notifiable work go ahead under the Party Wall etc. Act 1996. The phrase does not actually appear in the Act, so people use it to mean one of two things.
The first is your neighbour's written consent to your party wall notice, which settles the matter without surveyors. The second is a party wall award, made by one or more surveyors under section 10 when the neighbour dissents or does not consent within 14 days. An award sets out what work can be done, how and when, and usually records the condition of the neighbour's property beforehand. Our guide to notices, awards and agreements explains how they fit together.
What is the difference between a party wall agreement and a party wall award?
A party wall award is one type of party wall agreement. "Party wall agreement" is an informal term that covers either your neighbour's written consent to your notice or a formal award made by surveyors.
Written consent is simply the adjoining owner agreeing, in writing, to the work described in your notice. An award is a legal document made by surveyors under section 10 when a dispute is deemed to have arisen, for example because the neighbour dissented or did not reply within 14 days. The award settles the right to do the work, the time and manner of doing it, and costs. It is binding on both owners unless successfully appealed to the county court within 14 days of being served. See notices, awards and agreements explained.
Is a party wall agreement a legal requirement?
Yes, if your work is covered by the Party Wall etc. Act 1996, you must serve written notice, and you then need either your neighbour's written consent or a party wall award before starting. The Act does not use the phrase "party wall agreement", but in practice that is what the consent or award amounts to.
Not serving notice is not a criminal offence, but it leaves you exposed. Your neighbour may seek a court injunction to stop the work and claim damages at common law, and you lose the protection the Act's procedure gives you. If your project does not involve any of the three triggers (a new wall on the boundary, work to an existing party wall, or excavation near a neighbour's building), no notice or agreement is needed. Our Party Wall Act guide explains the triggers.
What is a party fence wall?
A party fence wall is a garden or boundary wall that stands astride the boundary between two properties and is not part of a building. It is defined in section 20 of the Party Wall etc. Act 1996 as a wall used to separate land belonging to different owners.
Two things fall outside the definition. Wooden or panel fences are not party fence walls, because they are not walls. And a masonry wall built wholly on one owner's land is not a party fence wall, even if it marks the boundary. Work such as raising, demolishing and rebuilding, or building against a party fence wall is usually notifiable under section 2. Our page on garden walls and boundary fences has more detail.
What is a party structure?
A party structure is any wall, floor, partition or other structure that separates buildings, or parts of buildings, that are reached by separate staircases or entrances. The term is defined in section 20 of the Party Wall etc. Act 1996 and includes party walls.
The most common example beyond an ordinary party wall is the floor between two flats in a converted house or block. Work to a party structure, such as cutting into it, strengthening it or demolishing and rebuilding it, is covered by section 2 and needs a party structure notice at least two months before work starts. This is why the Act often applies to flat refurbishments and conversions, not just to houses. Our guide to party structure definitions gives examples.
Who is the building owner?
The building owner is the owner who wants to carry out work that the Party Wall etc. Act 1996 covers. It is the person who must serve notice, and who normally pays for the work and the reasonable surveyors' fees.
"Owner" has a wide meaning under section 20. It includes freeholders, people in possession of land other than as a mortgagee or a short-term tenant (in practice, leaseholders with a lease of more than a year), and buyers who have contracted to purchase. So a long leaseholder planning works to their flat can be a building owner. The term describes your role in a particular project, not your status: the same person may be the building owner for one job and the adjoining owner for the next.
Who is the adjoining owner?
The adjoining owner is the neighbour whose land, building or storey adjoins the work being carried out. It is the person who must receive notice and who may consent, dissent or appoint a surveyor.
As with the building owner, "owner" is defined broadly in section 20. It covers the freeholder and, in practice, leaseholders with a lease of more than a year, so one property may have several adjoining owners. A house split into flats next door could mean serving the freeholder and each long leaseholder affected. Tenants on short lets are not owners, though it is courteous to keep them informed. For excavation work, adjoining owners can include neighbours who do not share a wall with you at all. Our guide on leaseholders and freeholders explains who to serve.
What is the line of junction?
The line of junction is the Party Wall etc. Act 1996's term for the boundary line between two pieces of land owned by different people. It matters most under section 1, which deals with building a new wall on that line where there is currently no wall, or only a fence.
If you want to build a new wall astride the line of junction, you need your neighbour's written consent. If they do not consent within 14 days, you may build the wall wholly on your own land instead, right up to the line. The Act uses the boundary as a reference point but does not decide where it is; if the position of the boundary is disputed, that has to be settled separately. See our guide to section 1 and new walls on junction lines.
When did the Party Wall Act come into force?
The Party Wall etc. Act 1996 came into force on 1 July 1997 and applies across England and Wales.
Before then, inner London had its own party wall rules under the London Building Acts (Amendment) Act 1939, which the 1996 Act was largely modelled on. Elsewhere in England and Wales, neighbours had to rely on common law, with no set procedure for notices or surveyors. The Act has been amended since, including a 2016 change allowing notices to be served by email where the recipient has agreed to that. You can read the current version of the Party Wall etc. Act 1996 on the official legislation website, or see our plain-English guide.
Who is the Party Wall Act relevant to?
The Party Wall etc. Act 1996 is relevant to anyone who owns property in England or Wales and either plans building work near a boundary or lives next door to someone who does.
That includes homeowners, long leaseholders, landlords, freeholders of blocks of flats, developers and owners of commercial premises. The Act applies to domestic and commercial buildings alike, and public bodies are covered too. Builders, architects and designers also need to understand it, because they often advise clients on whether notice is needed and may serve notices on their behalf. However, the legal duty to serve notice sits with the building owner, not the contractor. Tenants on short lets are not "owners" under the Act. Our guide to the Act explains your role in more detail.
What are the main steps of the party wall process?
The process usually follows these steps:
- Check whether your work is notifiable under section 1, 2 or 6.
- Serve written notice on every adjoining owner: two months for party wall work, one month for new boundary walls and excavations.
- The neighbour has 14 days to consent in writing. If they dissent or say nothing, a dispute is deemed to arise.
- In a dispute, each owner appoints a surveyor, or both share one agreed surveyor.
- The surveyors record the neighbour's property in a schedule of condition and make an award.
- Work starts once there is consent, or once the award is served and the notice period has expired.
Any damage is then dealt with under the award. Our party wall timeline flowchart shows each stage.
What is the difference between a notice, written consent, an award and a schedule of condition?
They are separate stages of the same process. A notice is the written document you serve on your neighbour describing the work and when you intend to start. It is what starts the process.
Written consent is your neighbour agreeing to the notice in writing, which means no surveyors are needed. An award is the binding document surveyors make under section 10 if consent is not given within 14 days; it settles how and when the work is done and who pays.
A schedule of condition is a written and photographic record of the neighbour's property before work starts. The Act does not require one, but it is strongly advised and usually forms part of an award. See our notices, awards and agreements guide.
Where can I read the official party wall guidance?
The official government guidance is the Party Wall etc. Act 1996 explanatory booklet, published on GOV.UK. It explains the Act in plain terms and includes example notices and response letters you can adapt.
The law itself is on the official legislation website, where you can read the full text of the Party Wall etc. Act 1996, section by section, in its current amended form. GOV.UK also has a shorter summary page on party walls and building works. The booklet is guidance rather than law, so where the two seem to differ, the wording of the Act prevails. For anything complex, such as basements or disputes, it is sensible to take advice from a party wall surveyor or solicitor.
Is a garden fence a party wall?
No. A wooden or panel garden fence is not a party wall or a party fence wall, so the Party Wall etc. Act 1996 does not cover work to it. Replacing or repairing a timber fence is a matter for the owners and the general law, including any covenants in the title deeds.
A masonry garden wall is different. If it stands astride the boundary and is not part of a building, it is a party fence wall under section 20, and work such as raising or rebuilding it is usually notifiable. If you plan to replace a fence with a new wall on the boundary, that is also covered, under section 1. See our guide to replacing a shared boundary fence.
Can a wall that stands wholly on my land still be a party wall?
Yes. Under section 20, a wall built entirely on one owner's land is a party wall if it separates buildings belonging to different owners. This often happens where a neighbour has built up against your existing external wall rather than building their own.
Only the part of the wall that actually separates the two buildings counts. For example, if your two-storey wall has a neighbour's single-storey extension built against it, the lower section is party wall but the upper section is not. If your wall stands wholly on your land and nothing is built against it, it is not a party wall, although a neighbour wanting to build against it would need to serve notice. Our guide to section 2 and existing party walls explains more.
What happens to a party wall when one of the buildings is demolished?
When one building is demolished, the party wall it shared is exposed and, in practice, becomes the external wall of the building that remains. Exposing a party wall that was previously enclosed is notifiable work under section 2, so the demolishing owner must serve a party structure notice at least two months before.
The building owner must also provide adequate weathering and protection for the exposed wall, such as rendering, insulation or temporary covering, and must make good or pay for any damage. Surveyors usually settle these details in the award. Whether the wall legally remains a party wall afterwards may depend on where it stands: a wall astride the boundary still counts if it forms part of a building, while a wall wholly on the remaining owner's land may cease to be one. See our guide to temporary works and shoring.
Does the Act apply to my work? 17
How do I know if the Party Wall Act applies to my project?
The Act applies if your project involves at least one of three types of work. Check each one:
- New wall on the boundary (section 1): building a wall on or at the line of junction where there is no wall, or only a fence.
- Work to an existing party wall or structure (section 2): for example cutting in a steel beam, removing a chimney breast, raising, underpinning or rebuilding.
- Excavation (section 6): digging within 3 metres of a neighbour's building and deeper than its foundations, or within 6 metres where the dig would cut a 45-degree line down from them.
If none applies, no notice is needed under the Act. If you are unsure, a party wall surveyor can usually tell you quickly. Our guide to when you need a party wall surveyor can help.
What types of work does the Party Wall Act cover?
The Act covers building new walls on the boundary, work to existing party walls and structures, and certain excavations near neighbouring buildings. Typical notifiable work includes:
- cutting into a party wall to take the weight of a steel beam, often for loft conversions
- removing a chimney breast attached to a party wall
- raising, thickening, underpinning, or demolishing and rebuilding a party wall
- inserting a damp-proof course into a party wall
- cutting into a neighbour's wall to insert flashings
- exposing a party wall during demolition
- building a new wall on the boundary
- digging foundations within 3 or 6 metres of a neighbour's building
The full list of party wall works is in section 2 of the Act. Our guide to the Act explains each category.
Which minor works do not need a party wall notice?
Everyday minor work to a party wall usually does not need notice. Official guidance treats the following as generally outside the Act:
- drilling to fix shelves, wall units, kitchen cupboards or a TV bracket
- fitting or moving electrical sockets and switches, or rewiring
- replastering
- decorating
The reason is that these jobs do not materially affect the strength or support of the wall. The position changes when the work goes further: deep chasing, cutting large recesses, or removing material that the wall relies on may count as cutting into a party structure under section 2. If you are unsure, it is safer to check before starting. Our list of common party wall mistakes covers this.
Do I need a notice to put up shelves, kitchen units or sockets on a party wall?
No, usually not. Drilling into a party wall to put up shelves, fix kitchen or wall units, or fit electrical sockets is treated as minor work that does not need a party wall notice.
These jobs involve small holes and fixings that do not affect the wall's strength or support, so they fall outside the work listed in section 2. It is still worth taking care: heavy drilling can disturb loose plaster on your neighbour's side, and you would be responsible for any damage you cause. A friendly word with your neighbour before noisy work is good practice. If the job involves more than surface fixings, such as cutting deep chases or recesses into the wall, check whether notice is needed. Our guide to section 2 work explains where the line falls.
Does replastering or rewiring a party wall need a notice?
No, replastering and rewiring are usually treated as minor works that do not need a party wall notice. Stripping and renewing plaster on your side, or running new cables and fitting sockets, does not normally affect the wall's structure.
The exception is where the work goes deeper than the surface. Cutting deep or extensive chases, forming recesses, or removing brickwork may amount to cutting into a party structure under section 2, which needs a party structure notice at least two months before. Old walls with soft mortar or thin construction need particular care, as vibration can affect the other side. Whether or not notice is needed, you remain responsible for any damage your work causes to your neighbour's property. See our guide to section 2 work on existing party walls.
Does every extension need a party wall notice?
No, but many do. An extension needs notice only if it involves one of the Act's three triggers: building a new wall on the boundary, work to an existing party wall, or excavating close to a neighbour's building.
The excavation rule in section 6 is the one most extensions trigger. Foundations dug within 3 metres of a neighbour's building and deeper than its foundations need notice, and so may deeper foundations within 6 metres. Side return and rear extensions built up to the boundary, or tied into a shared wall with flashings, often need notice under sections 1 or 2 as well. A small extension well away from the boundary, with shallow foundations, may need no notice at all. Our guide to party wall rules for home extensions walks through the checks.
Does the Act only cover the part of the project that touches the party wall?
Yes, broadly. The Party Wall etc. Act 1996 deals only with the notifiable elements of a project: new walls on the boundary, work to party walls and structures, and qualifying excavations. The rest of your building work is outside the Act.
So in a loft conversion, the notice and any award cover cutting beams into the party wall, but not your new staircase or dormer windows. Surveyors can only decide matters arising from the notifiable work, including how and when it is done and any damage it causes. Other parts of the project are governed by planning, Building Regulations and the general law. Your duty not to damage your neighbour's property still applies to all of it. Under section 10, an award settles the notified work only. Our guide on notices and awards explains more.
Do I need a notice if my neighbour is happy with the work?
Yes. If your work is covered by the Act, you still need to serve written notice, even if your neighbour has told you they are happy with it. An informal chat or verbal approval does not replace the notice.
The good news is that a supportive neighbour makes the process simple and cheap. Once they receive your notice, they can give written consent within 14 days, and no surveyors are needed. Written consent can also agree an earlier start date than the notice period would allow. Many owners still choose to record the condition of the neighbour's property with photographs before work begins, so there is no argument later about existing cracks. Our free party wall notice templates can help you prepare the notice. The rules on notice are set out in section 3.
Do I need to tell my neighbours about building work that is not covered by the Act?
No, there is no duty under the Party Wall etc. Act 1996 to tell neighbours about work the Act does not cover. However, it is usually wise to let them know as a courtesy, especially if the work will be noisy, involve skips or scaffolding, or last several weeks.
Other rules may still require contact. If you need planning permission, the council will normally consult neighbours. If you need to go onto their land for scaffolding or access, the Act's access rights do not help, because they only apply to notifiable work; you will need their agreement, or an order under the Access to Neighbouring Land Act 1992. You also remain liable at common law for any damage or nuisance your work causes. See our guide to rights of access under the Act.
Does cutting into a party wall for flashings need a notice?
Yes. Cutting into the wall of your neighbour's building to insert a flashing or other weatherproofing is specifically listed as notifiable work in section 2 of the Act. You must serve a party structure notice at least two months before starting.
This often comes up with extensions built up against a neighbour's wall, where a lead flashing is chased into their brickwork to keep the joint watertight. It also applies when the wall is a party wall and you cut into it for flashings, because cutting into a party structure for any purpose is notifiable. The neighbour can consent in writing within 14 days, or the matter goes to surveyors. Because flashings are usually part of a wider extension, they are often covered by the same notice as other work. See our guide to party wall rules for extensions.
Does inserting a damp-proof course into a party wall need a notice?
Yes. Section 2 gives the right to cut into a party structure for any purpose, and expressly mentions inserting a damp-proof course. That means you should serve a party structure notice at least two months before the work starts.
This applies whether the damp-proof course is a physical membrane cut into the brickwork or, usually, a chemical injection, which involves drilling a line of holes into the wall. The work can affect your neighbour's side, for example by disturbing plaster or pushing moisture elsewhere, so the Act gives them the chance to consent or to have surveyors set conditions. If your neighbour agrees, written consent is all you need. Our guide to damp-proofing injection on a party wall covers the practical points.
Does raising the height of a party wall need a notice?
Yes. Raising a party wall is notifiable work under section 2, so you must serve a party structure notice at least two months before starting. The same applies to raising a party fence wall, such as a shared garden wall.
Raising often comes up with loft conversions, hip-to-gable work, mansard roofs and two-storey extensions, where the party wall must go higher to support the new structure. The building owner normally pays for the work and must make good any damage, including to the neighbour's roof, flashings or chimney flues. If the neighbour later uses the raised part, for example by building their own extension against it, they may have to contribute a fair share of its cost. The details are usually settled in the award. See our loft conversion party wall rules.
Does demolishing and rebuilding a party wall need a notice?
Yes. Demolishing and rebuilding a party wall or party structure is notifiable under section 2, and you must serve a party structure notice at least two months before starting.
The Act allows this where the wall is defective or out of repair, or where it is not strong enough or high enough for the building you plan. When rebuilding, the building owner must protect the neighbour's building, make good any damage and, if the wall is being rebuilt for the building owner's benefit, carry the cost. Where rebuilding is needed because of defects both owners are responsible for, costs may be shared in proportion to use and responsibility. This is significant work, so surveyors usually set detailed requirements for temporary support, weatherproofing and timing in the award. See our guide to temporary works and shoring.
Does underpinning a party wall need a notice?
Yes. Underpinning a party wall is listed as notifiable work in section 2, so you need to serve a party structure notice at least two months before starting.
Underpinning deepens or strengthens the foundations under the wall, often for a basement, to deal with subsidence, or to support a heavier structure above. Because it affects the support of your neighbour's building as well as yours, the Act requires notice even if the work is entirely on your side. If the underpinning involves digging near your neighbour's foundations, an excavation notice under section 6 may be needed as well, and one document can cover both if each is clearly set out. Surveyors usually ask for engineer's drawings and method statements. Our guide to excavations and underpinning explains more.
Does exposing a party wall during demolition need a notice?
Yes. Exposing a party wall or party structure that was previously enclosed is notifiable work under section 2. If you are demolishing your building, or part of it, and that leaves your neighbour's side of a shared wall open to the weather, you must serve a party structure notice at least two months before.
The Act allows this only if you provide adequate weathering for the exposed wall, for example render, cladding or a temporary covering. You must also protect your neighbour's property during the work and make good or pay for any damage. Surveyors usually specify what protection is needed and when it must be in place. Demolition can also affect support for the neighbouring building, so temporary propping may be required. See our guide to temporary works and shoring.
Does thickening a party wall need a notice?
Yes. Thickening a party wall is notifiable work under section 2, alongside raising and underpinning. You must serve a party structure notice at least two months before starting.
Thickening is usually done to strengthen a wall so it can carry extra loads, such as a new storey or a loft conversion, or to improve fire or sound separation. It is normally built on the building owner's side. The building owner pays for the work and must make good any damage it causes to the neighbour's property. Fixing a thin layer of plasterboard or insulation to your face of the wall is not the same as thickening it structurally, and is usually treated as minor work. If you are unsure which applies, ask a surveyor. Our guide to section 2 work explains more.
Does cavity wall or internal insulation on a party wall need a notice?
It depends on the method. Fixing insulated plasterboard or a lightweight lining to your own face of a party wall is usually treated as minor work and does not normally need notice.
Injecting insulation into the cavity of a party wall is different. It involves drilling into the shared structure, and the material can spread into the part of the cavity that serves your neighbour's home, so it may count as cutting into a party structure under section 2. In that case, serve a party structure notice at least two months before. Insulating your own external cavity walls, which do not separate you from a neighbour, is outside the Act. Whatever the method, you are liable for any damage, such as damp bridging. See our guide on cavity wall insulation and party walls.
Common projects 18
Do I need a party wall agreement for a loft conversion?
Usually yes. Most loft conversions in terraced and semi-detached houses involve cutting into the party wall to take the ends of new steel beams or floor joists, which is notifiable under section 2. You must serve a party structure notice at least two months before starting.
Other loft work that often needs notice includes raising the party wall for a hip-to-gable or mansard conversion, removing chimney breasts in the roof space, and cutting in flashings. One notice can describe all the party wall elements. If your neighbour gives written consent within 14 days, no surveyors are needed; otherwise a party wall award will be required before the notifiable work starts. A detached house where no shared wall is touched may not need notice at all. See our loft conversion party wall rules.
Do I need a party wall agreement for a rear extension?
Often yes. Most rear extensions need new foundations, and if they are within 3 metres of a neighbour's building and deeper than its foundations, you must serve notice under section 6 at least one month before. Deeper foundations up to 6 metres away may also be caught.
Building a new wall on the boundary needs a section 1 notice, and cutting flashings into your neighbour's wall or raising a shared garden wall needs a section 2 notice, with two months' warning. Because rear extensions in terraces and semis are usually close to neighbouring houses, it is rare for one to need no notice at all. Check every trigger before serving, as a single notice can cover several. Our guide to party wall rules for home extensions explains each one.
Do I need a party wall agreement for a side return or infill extension?
Almost always, yes. A side return extension fills the narrow passage beside a terraced house, so it is usually built on or right up to the boundary, close to your neighbour's house.
Several triggers often apply at once. Building a new wall on the boundary needs a notice under section 1, one month before. Building on, raising or rebuilding an existing shared garden wall, or cutting flashings into your neighbour's wall, needs a section 2 notice, two months before. New foundations close to the neighbour's house will usually need a section 6 notice, one month before. Your neighbour may consent to a wall astride the boundary; if not, it must be built wholly on your land. Our guide to party wall rules for home extensions covers side returns in detail.
Do I need a party wall agreement for a two-storey extension?
Usually yes. A two-storey extension needs deeper or wider foundations than a single-storey one, so the excavation rules in section 6 are very likely to apply if it is close to a neighbour's building. That needs notice at least one month before.
Two-storey extensions on terraced and semi-detached houses also commonly involve raising or building against an existing party wall, cutting beams or flashings into it, or building a new wall on the boundary. These need notices under sections 2 and 1. Because of the extra height and loads, surveyors usually ask for structural drawings and calculations before making an award. A two-storey extension well away from any neighbour may need no notice. Our guide to party wall rules for home extensions explains how to check.
Do I need a party wall agreement to remove a chimney breast?
Yes, if the chimney breast is attached to a party wall, which it usually is in terraced and semi-detached houses. Cutting away a chimney breast from a party wall is notifiable under section 2, and you must serve a party structure notice at least two months before starting.
Removing a chimney breast can affect your neighbour's flues and the support for the remaining stack, especially if you take out the lower part and leave the upper part in place. You will normally need steel supports or gallows brackets, and Building Regulations approval, which is a separate requirement. If your neighbour gives written consent, no surveyors are needed; otherwise an award will set out how the work must be done. See our step-by-step guide to chimney breast removal and the Party Wall Act.
Do I need a party wall agreement to install a steel beam (RSJ)?
Yes, if the beam will bear on or be cut into a party wall. Cutting into a party structure to take the end of a steel beam is notifiable under section 2, so you must serve a party structure notice at least two months before starting.
This is common when knocking through rooms in a terraced house or converting a loft, where the beam often needs a padstone set into the party wall. If the beam is supported entirely on your own walls or on new piers built within your property, without cutting into the party wall, the Act may not apply. The structural design itself is checked through Building Regulations, which is separate. Surveyors usually want to see the engineer's details before making an award. Our guide to party wall rules for installing an RSJ explains more.
Do I need a party wall agreement for a basement?
Almost certainly, yes. A basement dig will usually go deeper than your neighbour's foundations, so if it is within 3 metres of their building, or within 6 metres and would cut a 45-degree line down from their foundations, you must serve notice under section 6 at least one month before.
Most basements under terraced or semi-detached houses also involve underpinning the party wall, which needs a section 2 party structure notice two months before. The excavation notice must state whether you plan to underpin or strengthen the neighbour's foundations and must include plans and sections. Basements carry more risk than most projects, so surveyors usually require detailed engineering information, monitoring and careful schedules of condition, and the adjoining owner may ask for security for expenses. Our guide to excavations and underpinning explains the process.
Do I need a party wall agreement for a conservatory?
Sometimes. A conservatory needs notice only if it triggers one of the Act's three rules, and many small conservatories do not.
Check these points. If the foundations will be within 3 metres of a neighbour's building and deeper than its foundations, you need a notice under section 6. If you build a dwarf wall or side wall on the boundary, section 1 applies. If you fix the conservatory to a party wall by cutting in flashings, or build on a shared garden wall, section 2 applies. A conservatory set back from the boundary on shallow foundations may need no notice at all. Conservatories are often exempt from planning and Building Regulations, but that does not affect the party wall position. See our guide to party wall rules for extensions.
Do I need a party wall agreement for a garden office or outbuilding?
Usually not, but it depends on where it goes and what foundations it has. Most garden offices sit on shallow bases, ground screws or pads well away from neighbouring buildings, so none of the Act's triggers apply.
Notice may be needed if you build a wall of the outbuilding on the boundary (section 1), build onto or against a shared garden wall (section 2), or dig foundations within 3 metres of a neighbour's building or structure and deeper than its foundations (section 6). The neighbour's "structure" can include their garage or shed, not just their house, and distances are measured from that structure, not the boundary. If you plan deeper strip foundations near a neighbour's outbuilding, check the depth first. Our guide to section 6 excavation rules explains the measurements.
Do I need a party wall agreement to replace my roof?
Usually not, if you are simply replacing the coverings on your own roof. Re-tiling, new battens and felt, or replacing your own rafters do not normally involve any of the Act's triggers.
Notice is needed if the job involves work to the party wall. Examples include raising the party wall or parapet, cutting into it to support new timbers or steels, rebuilding the party wall in the roof space, or cutting flashings into your neighbour's wall. These are notifiable under section 2 and need two months' notice. Changing the roof shape, such as a hip-to-gable conversion, will often involve the party wall. Note that scaffolding on a neighbour's land for an ordinary re-roof is not covered by the Act's access rights, so you will need their agreement. See our guide to section 2 work.
Do I need a party wall agreement for a new garden wall?
Yes, if you plan to build it on the boundary where there is currently no wall, or only a fence. That is covered by section 1, and you must serve notice at least one month before starting.
You can propose a wall astride the boundary, shared by both of you, but only with your neighbour's written consent. If they do not consent within 14 days, you may build the wall wholly on your own land, right up to the boundary, at your own expense. In that case you can place projecting footings under your neighbour's land, paying compensation for any damage. A garden wall built well inside your boundary does not need notice. Work to an existing shared garden wall, such as raising or rebuilding it, falls under section 2 instead. See our guide to garden walls and boundary fences.
Do I need a party wall agreement for knocking through a load-bearing wall?
Not for the internal wall itself, but often for the support. Removing a load-bearing wall inside your own home is not notifiable under the Party Wall etc. Act 1996, because it is not a party wall.
The question is where the new steel beam bears. In terraced and semi-detached houses, one end often sits on a padstone cut into the party wall, which is notifiable under section 2 and needs a party structure notice two months before. If the beam is supported entirely on your own walls or new piers within your property, no notice is usually needed. Either way, removing a load-bearing wall needs Building Regulations approval and an engineer's design, and you are responsible for any damage it causes next door. See our guide to party wall rules for installing an RSJ.
Do I need a party wall agreement for solar panels?
Usually not. Fitting solar panels to your own roof does not normally involve a party wall, a new boundary wall or excavation, so the Act does not apply.
It may apply if the installation involves work to the party wall, for example cutting into a party parapet, fixing brackets into the party wall, or raising it. Those works are notifiable under section 2. Panels or fixings must not overhang your neighbour's roof without their permission, as the Act gives no right to do that. If your installer needs scaffolding on your neighbour's land, that also needs their agreement, because the Act's access rights only apply to notifiable work. Planning rules on panel positions are separate. See our guide to solar panels near a neighbour's roofline.
Do I need a party wall agreement for drainage works?
Sometimes. The Act does not deal with drains as such, but digging a trench for a new drain, inspection chamber or soakaway is an excavation. If it is within 3 metres of a neighbour's building and deeper than its foundations, or within 6 metres and would cut a 45-degree line down from them, you must serve notice under section 6 at least one month before.
Shallow drainage runs that stay above the neighbour's foundation level are usually outside the Act. Separately, building over or near a public sewer, including many shared drains, may need agreement from the local water company, and connections to sewers have their own approval process. These are not party wall matters, so one does not replace the other. See our guide to shared drainage and sewers.
Do I need a party wall agreement for rendering or insulating an extension wall that faces my neighbour?
Usually not, but the Act also will not help you. Rendering or adding external insulation to your own wall is not notifiable work, so no party wall notice is needed.
The practical problem is space. If your wall is built right up to the boundary, render or insulation will project over your neighbour's land, and the Act gives no right to do that. You will need your neighbour's permission, ideally in writing, or the projection may be a trespass. Reaching the wall to do the work also needs their agreement, because the access rights in section 8 only apply to work carried out under the Act. If they refuse, you may be able to apply for a court order under the Access to Neighbouring Land Act 1992. See our guide to rights of access under the Act.
What other works often trigger the Act alongside an extension?
Extensions often include several separate pieces of notifiable work, and each should be described in your notices. Common examples include:
- new foundations within 3 or 6 metres of a neighbour's building (section 6)
- a new wall built on the boundary (section 1)
- cutting flashings into a neighbour's wall, or building on or raising a shared garden wall (section 2)
- steel beams bearing on the party wall where you open up the back of the house
- removing a chimney breast to create more space
- underpinning part of a party wall
Work under section 2 needs two months' notice; sections 1 and 6 need one month. Missing an item can mean a later delay or a second award. Our guide to party wall rules for home extensions has a fuller checklist.
Do I need a party wall agreement for piled foundations?
Usually yes, if the piles are near a neighbour's building. Piling is an excavation, and piles normally go far deeper than the foundations of a typical house. If they are within 3 metres of a neighbour's building or structure, or within 6 metres and would cut a 45-degree line down from its foundations, you must serve notice under section 6 at least one month before.
The notice must include plans and sections showing the piles' position and depth. Piling can also cause vibration, so surveyors may set conditions on the method, hours and monitoring, and a careful schedule of condition is especially important. Piles are often chosen where ground conditions are poor, which can make neighbouring buildings more sensitive. See our article on piled foundations near a neighbouring property.
Do I need a party wall agreement to repair a chimney stack?
It depends on whether the stack is part of a party wall. In terraced and semi-detached houses, chimney stacks often straddle the boundary and form part of the party wall, so they are party structures.
Making good, repairing, or demolishing and rebuilding a party structure is covered by section 2, so substantial repairs or rebuilding a shared stack usually need a party structure notice two months before. Taking down a shared stack, or reducing its height, will affect your neighbour's flues and needs notice. Very minor maintenance, such as small repointing on your own side, may be treated as outside the Act, but check before relying on that. Where the repair is needed because of disrepair both owners share, the cost may be split. A stack wholly on your side that serves only your house is not covered. See our guide to section 2 work.
Excavation: the 3 metre and 6 metre rules 10
What is the 3 metre rule?
The 3 metre rule is the first excavation test in section 6 of the Party Wall etc. Act 1996. You must serve notice if you plan to dig within 3 metres of a neighbour's building or structure and your excavation will go deeper than the bottom of its foundations.
The rule applies whether or not you share a wall, so it can catch extensions, basements, new foundations and deep trenches next to detached houses too. The notice must be served at least one month before work starts.
If your neighbour does not give written consent within 14 days, a dispute is treated as having arisen and surveyors settle how the work is done in an award. Our guide to section 6 explains both distance tests.
What is the 6 metre rule?
The 6 metre rule is the second excavation test in section 6(2). You must serve notice if you plan to dig within 6 metres of a neighbour's building or structure and the excavation would cut a line drawn downwards at 45 degrees from the bottom of that building's foundations.
In practice it catches deeper digs a little further away, such as basements, piled foundations and deep drainage. The closer and deeper you go, the more likely your excavation is to cross that 45-degree line, so a structural engineer's section drawing is usually the best way to check.
As with the 3 metre rule, notice must be served at least one month before work starts. See our guide to excavations and underpinning for worked examples.
Are the 3 m and 6 m distances measured from the boundary or from the neighbour's building?
They are measured from the neighbour's building or structure, not from the boundary. The question is how far your excavation is from the nearest part of their building or structure, and how deep it goes compared with their foundations.
This means you can dig right up to the boundary without triggering section 6 if the neighbour's house is set well back, while a dig several metres inside your own garden can still be caught if their building is close to the boundary. "Structure" is wider than the house itself, so a neighbour's garage or other structure can count.
Measure from the actual building on site rather than from a plan of the plot, and take advice if the figures are close.
Does the Act apply if I only dig on my own land?
Yes. Section 6 of the Act is specifically about excavations on your own land that are close enough and deep enough to affect a neighbour's foundations. Owning the land you dig on does not take the work outside the Act.
If your excavation falls within the 3 metre or 6 metre tests, you must serve an excavation notice at least one month before starting, even though nothing touches your neighbour's property. The aim is to protect their building from movement caused by removing soil nearby.
The Act does not give you a right to dig on your neighbour's land. Our section 6 guide explains how to check whether your dig is caught.
How do I know if I need an excavation notice if I don't know how deep my neighbour's foundations are?
You often can't know for certain, so the safe approach is to assume the foundations may be shallow and serve notice if your dig could plausibly go deeper. Many older houses, particularly Victorian and Edwardian ones, were built on fairly shallow footings.
Ways to find out more include asking your neighbour, checking any original drawings or building control records, and asking your structural engineer to dig a trial pit on your side of the boundary.
Serving a notice that turns out to be unnecessary costs little, while missing one can lead to an injunction or a damages claim. Read more in digging deeper than shallow foundations.
What must an excavation notice include?
An excavation notice under section 6 must be in writing and include:
- your name and address as the building owner;
- the nature and particulars of the proposed work, including whether you intend to underpin or otherwise strengthen or safeguard your neighbour's foundations;
- the date the work will begin;
- plans and sections showing the site and depth of the excavation and the site of any building or structure you plan to put up.
Missing plans or sections are a common reason excavation notices are challenged. Our free notice templates include a section 6 version.
Does digging for a new drain or soakaway need a notice?
It may do. The Act does not care what the hole is for, only how close it is to a neighbour's building or structure and how deep it goes. If a drain trench or soakaway meets the 3 metre or 6 metre test in section 6, you need to serve an excavation notice at least one month before digging.
Many shallow drain runs fall outside the Act, but soakaways and deeper connections can easily be caught when they are close to the house next door.
Work near or over a public sewer usually also needs the water company's approval, which is a separate process. See our guide to shared drainage and sewers.
Does a basement dig always need an excavation notice?
Not always, but almost. A basement is usually deep enough and close enough to the neighbouring building to meet the 3 metre or 6 metre tests in section 6. The main exception is where the nearest neighbouring building is far enough away that neither test applies.
In terraced and semi-detached houses, basement projects often involve more than one type of notice. Underpinning or cutting into the party wall is work under section 2, which needs a party structure notice at least two months before starting, alongside the one-month excavation notice.
Given the risks, basement works usually involve detailed engineering drawings, a schedule of condition and a full award. See our excavation and underpinning guide.
Can I underpin my neighbour's foundations?
Yes, if it is needed to protect their building from your excavation, but only through the Act's procedure. Under section 6(3), you may underpin or otherwise strengthen or safeguard your neighbour's foundations, and must do so if they require it, as far as necessary and at your own expense.
Your excavation notice must say whether you propose to do this. If the wall being underpinned is a party wall, the work also falls under section 2 and needs a party structure notice.
Where the neighbour does not consent, the surveyors decide the method and timing in the award. Access to their land needs 14 days' notice under section 8. Our underpinning guide explains more.
New walls on the boundary 11
Do I need a notice to build a new wall on the boundary?
Yes, if there is currently no wall on the boundary, or only a fence, and you want to build a new wall on the line of junction. Section 1 requires you to serve notice at least one month before you start.
This applies whether you want to build the wall astride the boundary (half on each side) or wholly on your own land right up against it. The notice should say which you intend, describe the wall and give the start date.
If you build the wall set back from the boundary, section 1 does not apply, although digging its foundations near a neighbour's building may still need an excavation notice. Our section 1 guide covers the details.
Can I build a new party wall astride the boundary?
Only with your neighbour's written consent. Under section 1, you must serve notice at least one month before starting, describing the wall you want to build astride the line of junction.
If your neighbour agrees in writing, the wall is built half on each side, or in another position you both agree. The cost is shared in proportion to the use each of you makes, or will make, of the wall.
If they do not consent within 14 days, you cannot build astride the boundary. You may only build the wall wholly on your own land, at your own expense. Our section 1 guide explains both options.
What happens if my neighbour doesn't consent to a wall astride the boundary?
You must build the wall wholly on your own land instead. Under section 1(4), if you do not receive written consent within 14 days of serving notice, you may only build the wall at your own expense, as an external wall or fence wall on your side of the boundary.
Unlike party structure and excavation notices, silence here does not create a dispute that needs surveyors. It simply means the astride option is off the table.
You keep the right to place projecting footings under your neighbour's land where necessary, paying compensation for any damage. If a disagreement arises about how the work is carried out, it can be referred to surveyors under section 10.
Can my foundations go under my neighbour's land?
In limited cases, yes. When you build a new wall wholly on your own land under section 1, section 1(6) gives you the right to place projecting footings and foundations below your neighbour's land where they are necessary for the wall. You must pay compensation for any damage this causes to their property.
There is an important limit: "special foundations", meaning foundations reinforced with steel beams or rods, cannot be placed on your neighbour's land without their written consent under section 7(4). Engineers usually design around this, for example with a cantilevered foundation.
Outside this right, the Act does not let you build under your neighbour's land, so any other encroachment needs their agreement.
What happens if my neighbour later builds against my wall?
If your neighbour later makes use of a wall built at your expense, they will usually have to pay you a fair share of its cost. Under section 11(11), an adjoining owner who uses work carried out by the building owner must pay a due proportion of the expenses, often called enclosure costs.
The share normally reflects how much of the wall they use, valued at the time they use it. If you can't agree the figure, it can be settled by surveyors under the Act.
Any work your neighbour wants to do to your wall, such as cutting in or raising it, will need its own notice. See our guide on paying for boundary walls.
Can I build up against an existing wall that has not been built against before?
It depends who owns the wall and what you plan to do to it. If the wall stands astride the boundary, using it as part of your new building usually involves work such as raising, thickening or cutting into it, which needs a party structure notice under section 2, served two months ahead.
If the wall stands wholly on your neighbour's land, the Act gives you no right to use it. You would need their agreement, or you would build your own wall alongside it.
Either way, digging new foundations near it may need an excavation notice, and you may have to contribute to the cost of a wall your neighbour paid for. A surveyor can check which rules apply before you finalise your design.
Can the Party Wall Act settle a boundary dispute?
No. The Act deals with how notifiable building work is carried out near a boundary, not with where the boundary is. Party wall surveyors have no power to decide the legal boundary between two properties.
If you and your neighbour disagree about where the line runs, you will need to resolve that separately, for example by agreement, mediation, an application to HM Land Registry for a determined boundary, or ultimately through the courts. Taking advice from a solicitor or boundary specialist is sensible.
It is usually best to settle a boundary disagreement before serving notice, because the type of notice, and whether a wall can go astride the line, depends on where the boundary is. See our guide to boundary fences and common law.
Does a party wall award decide where the legal boundary is?
No. A party wall award settles matters connected with the notified work, such as the right to carry it out, the time and manner of doing it, and costs. It does not decide or change the legal boundary between the properties.
An award may describe or show where a wall sits for the purposes of the work, but that is not a ruling on ownership and should not be relied on as proof of where the boundary lies. Surveyors' powers under section 10 do not extend to boundary disputes.
If the boundary position matters to you, deal with it separately through agreement, HM Land Registry or a solicitor.
Does the Party Wall Act change who owns a wall?
No. The Act gives owners rights to carry out certain work and sets out a procedure for doing it, but it does not transfer ownership of a wall or move the boundary.
A wall astride the boundary is usually treated as belonging to each owner up to the boundary line, with each having rights over the whole wall. A wall wholly on one owner's land stays that owner's property, even if it becomes a party wall because buildings on both sides use it.
Doing work under the Act, such as raising or thickening a party wall, does not by itself give you ownership of your neighbour's side. Our Party Wall Act guide explains the definitions in more detail.
Can render, insulation or guttering overhang my neighbour's land?
Not without your neighbour's agreement. The Act does not give you a right to have render, external insulation, gutters, fascias or eaves project over your neighbour's land. The only encroachment it allows is projecting footings below ground under section 1(6), in limited circumstances.
Anything that overhangs the boundary without consent is likely to be a trespass, and your neighbour could ask for it to be removed. This catches many extensions built tight to the boundary, where a few centimetres of render or a gutter end up on the wrong side.
If your neighbour agrees, get it in writing and ask a solicitor whether it should be formally recorded so it binds future owners. See our guide to overhanging structures.
What is a section 1 notice?
A section 1 notice, sometimes called a line of junction notice, is the notice you serve when you want to build a new wall on the boundary where there is currently no wall, or only a fence. It is required by section 1 and must be served at least one month before work starts.
The notice says whether you want to build the wall astride the boundary, which needs your neighbour's written consent, or wholly on your own land. If your neighbour does not consent within 14 days, you can only build on your own side.
It must be in writing and describe the wall and the start date. Our free notice templates include a section 1 version.
Serving a party wall notice 22
What is a party wall notice?
A party wall notice is a formal written notice that tells your neighbour about building work covered by the Party Wall etc. Act 1996 before it starts. You need one for new walls on the boundary (section 1), work to an existing party wall or structure (section 2) and excavations near a neighbour's building (section 6).
Serving the notice starts the statutory process. Your neighbour can consent in writing, or the matter goes to surveyors who agree the terms of the work in an award. The notice is not itself an agreement, and it does not ask permission for the project as a whole.
Our guide to notices, awards and agreements explains how they fit together.
What types of party wall notice are there?
There are three main notices a building owner may need to serve:
- Line of junction notice (section 1): for a new wall on the boundary, at least one month before work.
- Party structure notice (section 3): for work to an existing party wall, party fence wall or party structure under section 2, at least two months before work.
- Notice of adjacent excavation (section 6): for digging within the 3 metre or 6 metre distances, at least one month before work.
The Act also provides for a counter notice, which an adjoining owner may serve in reply to a party structure notice, and a notice of entry under section 8 before access. See the full Act.
How do I serve a party wall notice?
Prepare a written notice for each adjoining owner and deliver it in one of the ways allowed by section 15: by hand, by post to their usual or last-known address, or by leaving it at that address. You can use email only if the recipient has told you in advance that they accept notices that way and given you an address.
Serve every owner of each affected property, including freeholders and long leaseholders. Include any plans or sections required, and a reply form makes it easier for your neighbour to respond.
Keep copies and a record of how and when each notice was served. The party wall notice generator can help you prepare the documents.
Can I serve a party wall notice myself?
Yes. Anyone can prepare and serve a party wall notice, including the building owner. There is no requirement to use a surveyor, and no official form you must buy.
The key is accuracy. A notice must give your name and address, describe the work properly and state the start date, and excavation notices also need plans and sections. Courts have treated defective notices as invalid, so a careless notice can delay the project.
Many homeowners serve their own notices for straightforward work and only involve a surveyor if the neighbour does not consent. Our party wall notice generator walks you through the details you need.
Will my builder or architect serve the notice for me?
They may, but you should not assume it. Builders, architects and surveyors can all serve notices on your behalf, but it is not automatically part of their job unless agreed.
Legally, the duty to serve notice falls on you as the building owner. If a notice is not served, or is served late or incorrectly, you face the consequences, such as delays or claims from your neighbour.
Agree in writing who will prepare and serve the notices, and ask for copies and proof of service before any notifiable work starts. Leaving this unclear is one of the most common party wall mistakes.
What must a party wall notice include?
Every notice must be in writing and include your name and address as the building owner, the nature and particulars of the proposed work, and the date the work will begin. The details should be specific enough for your neighbour to understand exactly what you intend to do.
Some notices need more. A party structure notice involving special foundations must include plans, sections and construction details with particulars of the loads, under section 3. An excavation notice must say whether you will underpin or strengthen the neighbour's foundations and include plans and sections.
For jointly owned property, name all the owners. Our free notice templates cover each type of notice.
Is there an official party wall notice form or template?
No. The Act does not prescribe an official form, so any written notice that contains the required information and is served properly is valid.
The government's explanatory booklet includes example notices and reply letters you can adapt. Whatever you use, check it matches the type of work: a section 1, section 3 and section 6 notice each need slightly different content.
You can also use our free party wall notice templates, which follow the Act's requirements and include a reply form for your neighbour.
Can I serve a party wall notice by email?
Only if the person you are serving has said in advance that they will accept notices by email and has given you an email address for that purpose. This was allowed by a 2016 amendment to section 15.
Without that prior agreement, an emailed notice may not be validly served, which could undermine everything that follows. Keep a written record of your neighbour's agreement to email service, such as a message confirming the address to use.
If you have any doubt, serve the notice by hand or by post as well. Our notice generator produces documents you can print or send.
Can a party wall notice be given verbally?
No. A party wall notice must be in writing and served in one of the ways set out in section 15. A conversation over the fence, however friendly, does not count as notice under the Act.
Talking to your neighbour first is still a good idea. Explaining your plans in person often makes them more comfortable and more likely to consent. But you must follow up with a formal written notice that includes the required details and the start date.
The same applies to your neighbour's reply: consent should be given in writing to be relied on. Our cover letter template helps you introduce the notice in a friendly way.
Who must I serve a party wall notice on?
You must serve every adjoining owner of each property affected by the notifiable work. Under section 20, "owner" includes the freeholder, anyone in possession other than as a mortgagee or short-term tenant, and a buyer who has exchanged contracts.
In practice, leaseholders with a lease of more than a year count as owners too. So if the building next door is split into flats, you may need to serve the freeholder and each long leaseholder whose property is affected.
Short-term tenants, such as those on an assured shorthold tenancy, are not owners and do not need notice, though telling them is courteous. See leaseholders vs freeholders.
How do I find out who owns the neighbouring property?
Start by asking your neighbour, but don't rely on that alone. The most reliable source is the title register held by HM Land Registry, which you can download for a small fee. It shows the registered owner and an address for service.
If the building contains flats, check for separate leasehold titles as well as the freehold, since long leaseholders also count as owners. For rented property, the register will show the landlord rather than the tenant, and a letting agent may be able to confirm contact details.
If the land is unregistered or the owner can't be traced, the Act lets you address the notice to "the owner" of the premises, as explained in section 15.
What if I don't know who owns the property next door?
You can still serve a valid notice. Under section 15(2), if you cannot find the owner's name and address after reasonable enquiry, you can address the notice to "the owner" of the premises, naming the property, and either deliver it to someone there or fix it to a conspicuous part of the premises.
Make genuine efforts first, such as checking HM Land Registry and asking neighbours or agents, and keep a record of what you did. Photograph the notice once it is fixed in place.
If no one responds, a dispute arises after 14 days and you can appoint a surveyor for the absent owner. Our guide to derelict and abandoned properties explains more.
What if the neighbouring property is empty, derelict or rented out?
You still need to serve notice on the owner. For rented property, that usually means the landlord, plus any tenant with a lease of more than a year. Short-term tenants are not owners under the Act.
For empty or derelict buildings, check HM Land Registry for the registered owner and serve them at their address. If you cannot trace them, section 15(2) allows a notice addressed to "the owner" to be fixed to a conspicuous part of the premises.
If no one replies within 14 days, a dispute arises and, after a further written request and 10 days, you can appoint a surveyor on the owner's behalf. See what if the property next door is derelict.
Do I need to serve notice on every neighbour?
No, only on the owners of properties affected by notifiable work. In a semi-detached house, that is usually just the attached neighbour. In a terrace, it may be the owners on one or both sides, depending on which walls you work on.
Excavations can widen the circle. If you dig within 3 or 6 metres of other buildings, such as a house behind or across a shared passage, those owners may need an excavation notice too, even though you share no wall.
Remember that one property can have several owners, such as a freeholder and long leaseholders. Our guide to semi-detached and terraced houses sets out typical scenarios.
Should I talk to my neighbours before serving notice?
Yes, it is strongly recommended, although the Act does not require it. A formal notice arriving out of the blue can feel confrontational, while a friendly conversation first gives your neighbour a chance to see the plans and ask questions.
Explain what you plan to do, roughly when, how long it should take, and that you will cover the reasonable surveyor costs if a surveyor is needed. Neighbours who feel informed are more likely to consent, which can save time and money.
The conversation does not replace the written notice, which you must still serve properly. Our cover letter template helps you send the notice in a friendly tone.
What happens if my notice is wrong or incomplete?
It may be invalid. Courts expect notices to comply strictly with the Act, as shown in Gyle-Thompson v Wall Street Properties (1974). A notice with the wrong owner, a missing start date, a vague description of the work or missing plans for an excavation could be challenged.
An invalid notice can undermine the surveyors' authority and any award based on it, leaving your works exposed to an injunction or claim. The usual fix is to serve a fresh, correct notice, but the notice period then starts again.
Checking notices carefully before serving them saves time later. Our list of common party wall mistakes covers the usual errors.
Can I serve one notice covering several types of work?
Usually you serve a separate notice for each type of work, because each section of the Act has its own rules and notice period. For example, a rear extension might need a section 6 excavation notice (one month) and a section 3 party structure notice (two months) for cutting into the party wall.
You can deliver the notices together in one envelope. A single party structure notice can also cover several items of work to the same wall, as long as each item is described clearly.
Remember to serve each affected owner separately. Our notice generator helps you produce the right set of notices for your project.
What records should I keep?
Keep a full paper trail from the first notice to the end of the works. In particular, keep:
- copies of every notice, plan and section you served;
- proof of service, such as the date, method, postage receipts or photographs;
- any written agreement to accept email service;
- your neighbour's replies, consents and counter notices;
- surveyor appointment letters, the award and any addendum awards;
- the schedule of condition and correspondence about damage or costs.
These records protect you if anything is disputed later and help when you sell. Our dispute resolution checklist shows what to have ready.
Do I need planning permission before serving a party wall notice?
No. Planning permission, Building Regulations and the Party Wall Act are separate systems, and you can serve notice before planning is granted. Having planning permission does not remove the need for notice either.
Timing still matters. Party structure and excavation notices lapse if work has not started within 12 months of service. If planning is slow, or your design changes after approval, you may need to serve fresh notices that match the final scheme.
Many owners serve notice once the design is settled and planning is likely or granted. See Party Wall Act vs planning vs Building Regulations.
What is a section 3 party structure notice?
A party structure notice is the notice you serve under section 3 before doing work to an existing party wall, party fence wall or party structure under section 2. Typical examples are cutting in steel beams, removing chimney breasts, raising the wall, underpinning and inserting a damp-proof course.
It must be served at least two months before work starts and give your details, the nature of the work and the start date. Your neighbour has 14 days to consent in writing, otherwise a dispute arises. They may also serve a counter notice within one month.
The notice lapses if work does not start within 12 months. See our section 2 guide.
What is a section 6 notice of adjacent excavation?
It is the notice you serve under section 6 before digging within 3 metres of a neighbour's building and deeper than its foundations, or within 6 metres where the dig would cut a 45-degree line down from those foundations.
It must be served at least one month before work starts, say whether you plan to underpin or strengthen the neighbour's foundations, and include plans and sections showing the excavation and any new building. Your neighbour has 14 days to consent in writing, otherwise a dispute arises and surveyors are appointed.
The notice lapses if work does not start within 12 months. See our section 6 guide.
What is an acknowledgement letter?
An acknowledgement letter is a reply form usually sent with a party wall notice so the neighbour can respond easily. It typically offers three choices: consent to the work, dissent and agree to use the same surveyor, or dissent and appoint their own surveyor.
The Act does not require one, but it helps record the neighbour's decision clearly. Signing to confirm you received the notice is not the same as consenting to the work, so both sides should check which option has been ticked.
If the form is not returned within 14 days for a party structure or excavation notice, a dispute arises. See consent vs acknowledgement for the difference.
Notice periods and timescales 14
How much notice must I give?
It depends on the type of work. You must give at least two months' notice for work to an existing party wall or party structure under section 3, and at least one month's notice for a new wall on the boundary (section 1) or an excavation near a neighbour's building (section 6).
These are minimum periods. They can only be shortened if your neighbour agrees in writing. If your neighbour does not consent and surveyors are needed, you will also have to wait for the award, which can take longer than the notice period.
Our party wall timeline flowchart shows how the periods fit together.
When should I serve a party wall notice?
Serve it as soon as your design is settled enough to describe the work accurately, and well before the minimum notice period. Leave extra time in case your neighbour does not consent and surveyors need to prepare an award.
Don't serve too early either. Party structure and excavation notices lapse if work has not started within 12 months of service, so serving long before you are ready to build can mean starting again.
You can serve notice before planning permission is granted, but if the design changes afterwards you may need fresh notices. Our party wall timeline guide helps you plan the dates.
How long does my neighbour have to reply?
Your neighbour has 14 days to consent in writing to a party structure notice or an excavation notice. If they do not consent within that time, a dispute is treated as having arisen under section 5, and surveyors must be appointed. Silence is not consent.
For a section 1 notice to build a wall astride the boundary, the 14 days work differently: no consent simply means you must build wholly on your own land.
Separately, an adjoining owner who receives a party structure notice has one month to serve a counter notice asking for extra work. See what happens if a neighbour ignores a notice.
Can I start work before the notice period ends?
Only if your neighbour agrees in writing to an earlier start. The notice periods of two months for party structure work and one month for excavations and boundary walls are minimums that protect the adjoining owner.
Without that written agreement, you must wait for the notice period to expire. If there is a dispute, you also need an award to have been served before starting the notifiable work. A narrow exception in section 3(3) covers work required by a council's dangerous structure notice.
Parts of your project that are not covered by the Act can usually go ahead in the meantime.
Does a quick reply from my neighbour shorten the notice period?
No, not on its own. A prompt written consent means no dispute arises and surveyors are not needed, but the notice period still runs to its end unless your neighbour also agrees in writing to an earlier start date.
If you want to start sooner, ask your neighbour to say so expressly in their consent, for example by confirming that work may begin on a stated date. Make sure the wording is clear and keep a copy.
Without that, you must still wait the full two months for party structure work or one month for excavations and boundary walls. See consent vs acknowledgement for how replies are worded.
How long is a party wall notice valid for?
A party structure notice or an excavation notice ceases to have effect if the work has not begun within 12 months of the day it was served, and is not then carried on with due diligence. This is set out in section 3(2)(b) and section 6(8).
If your project is delayed beyond 12 months, for example by planning or funding, you will need to serve a fresh notice and the notice period starts again.
Once work has begun within the 12 months and is pressed on with properly, the notice stays effective. Our guide on how long an award is valid explains how this links to awards.
Does a notice's 12-month life mean the work must finish within a year?
No. The 12-month rule is about starting, not finishing. The work must begin within 12 months of the notice being served and must then be carried on with due diligence. There is no fixed deadline for completion in the Act.
"Due diligence" means you should not start the work just to keep the notice alive and then leave it for a long period. A token start followed by a lengthy pause risks the notice lapsing.
The award may set out how and when the work is to be carried out, so check it for any timing terms. See section 3(2)(b) for the wording.
How long does the party wall process take?
If your neighbour consents in writing, the process usually takes no longer than the notice period: two months for party structure work, or one month for excavations and boundary walls, unless they agree an earlier start.
If a dispute arises, it takes longer. Surveyors must be appointed, a schedule of condition prepared, drawings and engineering details reviewed, and the award agreed and served. That often adds several weeks, and complex projects such as basements, or neighbours who don't respond, can extend it further.
Serving notice early and sending complete drawings helps keep things moving. Our party wall timeline flowchart shows each stage.
How long does a party wall award take?
It varies with the project and the people involved. Once surveyors are appointed, they need the full drawings and structural details, a schedule of condition of the neighbour's property, and time to agree the terms of the award.
An agreed surveyor acting for both owners is often quicker than two surveyors who must reach agreement. Delays usually come from missing engineering information, disagreements about method or fees, or an owner who does not respond.
The Act includes 10-day deadlines in section 10 that stop the process stalling if someone fails to appoint or act. See our agreed surveyor vs two surveyors comparison.
Can I start work before the award is finished?
No, not the notifiable work, unless your neighbour agrees. Where a dispute has arisen, you may only start once the award has been served and the notice period has expired. Starting early can expose you to an injunction and a claim for damages.
You can usually get on with parts of the project that are not covered by the Act, such as internal work away from the party wall, while the surveyors finish the award.
The award is made under section 10 and sets out the time and manner of the work. Our timeline guide shows where the award fits.
Can I start work if my neighbour doesn't reply?
No. If your neighbour does not consent in writing within 14 days of a party structure or excavation notice, a dispute is treated as having arisen. Silence is not consent, so you need an award before starting the notifiable work.
If your neighbour also fails to appoint a surveyor, you can send a written request asking them to do so. If they still have not appointed one within 10 days, section 10(4) lets you appoint a surveyor on their behalf, so the process can continue.
See what happens if a neighbour ignores a notice for the steps in order.
How long is a party wall award valid for?
The Act sets no expiry date for an award itself. An award relates to the specific work it describes, so it remains relevant for as long as that work is being carried out as described.
Two things can affect it in practice. The notice the award is based on must not have lapsed, which happens if work does not start within 12 months of service and proceed with due diligence. And if the work changes materially from what the award covers, an addendum award or a new award may be needed.
Our guide on how long a party wall award is valid for explains this in more detail.
How long does my neighbour have to serve a counter notice?
One month from the date the party structure notice was served. Under section 4, the adjoining owner can use that time to ask for additional work for their own benefit, such as chimney copings, piers or deeper foundations, which they usually pay for.
The building owner then has 14 days to consent to the counter notice. If they do not, a dispute arises and the surveyors decide.
Counter notices only apply to party structure notices. For an excavation notice, the neighbour can instead require their foundations to be underpinned or safeguarded, with any disagreement settled by the surveyors. See our section 2 guide.
What is the latest I can serve notice before my builder starts?
At the very latest, two months before work starts for party structure work, or one month before for excavations and new boundary walls. These minimums can only be shortened if your neighbour agrees in writing.
Serving at the last possible moment is risky. If your neighbour does not consent within 14 days, you cannot start the notifiable work until an award has been served, which may take longer than the notice period. Builders often have to be rescheduled as a result.
A safer approach is to serve as soon as your plans are settled, within 12 months of your expected start. Our party wall notice generator helps you prepare notices quickly.
You've received a notice 16
I've received a party wall notice. What should I do?
Read it carefully and reply in writing within 14 days. The notice should name the building owner, describe the work and give a start date; an excavation notice should also come with plans and sections. If anything is unclear, ask the building owner for more detail before you decide.
You can consent, or dissent and either agree to one surveyor acting for you both or appoint your own. If you do not reply to a section 3 or section 6 notice within 14 days, a dispute is treated as having arisen under section 5 and surveyors will be appointed. A notice for a new wall astride the boundary works differently: silence there means no consent, not a dispute.
Whatever you decide, it is wise to have the condition of your property recorded before work starts.
What are my options when I receive a party wall notice?
You usually have three options when you receive a party structure (section 3) or excavation (section 6) notice:
- Consent in writing, so the work can go ahead without surveyors.
- Dissent and agree to one surveyor acting impartially for both owners (the agreed surveyor).
- Dissent and appoint your own surveyor, who works with the building owner's surveyor.
If you dissent, the surveyors make a party wall award setting out how the work is to be done. With a party structure notice you may also serve a counter notice within one month asking for extra works for your benefit. Saying nothing is not consent: after 14 days a dispute is deemed to have arisen under section 5.
Should I consent or dissent to a party wall notice?
Consent if the work is minor and you are comfortable with it; dissent if the work carries more risk or you want the protection of a formal award. Consenting is quicker and avoids surveyors' fees, which can suit low-risk work by a neighbour you trust.
Dissenting is often sensible for excavations, basements, underpinning or cutting steel beams into the wall. It leads to an award that can set working methods, hours, protection and access, usually with a schedule of condition, and the building owner normally pays the reasonable surveyors' fees under section 11.
Dissenting does not stop the work; it sets the rules for how it is done. If you consent, ask for the condition of your property to be recorded first.
What does consenting to a party wall notice mean for me?
Consenting means you agree in writing to the work described in the notice going ahead without surveyors, so no award is made. You can also agree to the work starting earlier than the notice period would otherwise allow.
You still keep important protections. Under section 7 the building owner must not cause unnecessary inconvenience and must compensate you for any loss or damage the work causes. If a disagreement arises later, for example over damage, surveyors can usually be appointed to settle it.
The main drawback is that there is no agreed record of your property's condition unless you arrange one, so ask for a schedule of condition or take dated photos before work begins.
If I consent to a party wall notice, can I still claim for damage?
Yes. Consenting does not remove the building owner's duty under section 7 to compensate adjoining owners and occupiers for any loss or damage caused by the work.
If you and the building owner cannot agree on the damage or what should be paid, a dispute arises and surveyors can usually be appointed to decide it, even though you consented to the original notice. The surveyors may require the damage to be made good or award a payment instead.
Your claim is much easier to prove if the condition of your property was recorded before work started. Without that record, it can be hard to show which cracks are new, so dated photos or a schedule of condition are worth having. See our guide to the evidence needed to prove damage.
What happens if I ignore a party wall notice?
If you ignore a section 3 or section 6 notice, you have not consented, and after 14 days a dispute is treated as having arisen. The process then moves on without you. The building owner can ask you in writing to appoint a surveyor, and if you do not do so within 10 days, they may appoint one on your behalf under section 10(4).
That surveyor must act impartially, and the award they make is binding on you, but you lose the chance to choose who is appointed for your side. The work can still go ahead once the award is served and the notice period has ended.
A section 1 notice for a new wall astride the boundary is different: if you do not consent within 14 days, the wall must be built wholly on your neighbour's land. More on ignored notices.
Can I stop my neighbour's building work?
Usually not. The Act gives building owners a right to carry out the work it covers, provided they follow the procedure. Dissenting does not give you a veto; it leads to surveyors deciding how and when the work is done, with protection for your property.
You may be able to halt work in some situations. If notifiable work starts without notice, or before written consent or an award, you can ask the court for an injunction, and prompt legal advice is sensible. See our guide on a neighbour building without a party wall agreement.
Objections to whether the project should happen at all, such as its size or appearance, belong in the planning process rather than the party wall process.
Can I object to party wall work because I don't like the design?
No. The Party Wall Act deals with how notifiable work is carried out next to or on the party wall, not with whether a project looks right. Surveyors cannot refuse work, or change its design, because a neighbour dislikes its appearance.
Concerns about size, height, overlooking or appearance are planning matters. If the work needs planning permission, you can comment on the application to the local council. If it is permitted development, your options for objecting on design grounds are usually limited.
Under the Act, your influence is over the practical side: protection, working methods, access, hours and making good any damage. Our guide on the Party Wall Act, planning and Building Regulations explains how the regimes differ.
What is a party wall counter notice?
A counter notice is a reply to a party structure notice asking the building owner to carry out extra works for your benefit at the same time. You must serve it within one month of the party structure notice being served, under section 4.
It must describe the works you want and include plans or sections where needed. The building owner then has 14 days to consent; if they do not, a dispute arises and the surveyors decide. The building owner does not have to carry out works that would harm them or cause unnecessary inconvenience or delay.
You normally pay for the extra works you ask for, and the building owner may ask you for security before carrying them out.
What can a counter notice ask for?
A counter notice can ask the building owner to build in works that are reasonably required for your convenience while they work on the party wall or party structure. Under section 4 this may include:
- chimney copings, breasts, jambs or flues;
- piers, recesses or similar works;
- deeper or special foundations, where the building owner plans to place special foundations on your land.
A common example is asking for a party wall to be built with a flue or pier you plan to use later. The request must be made within one month and be reasonable. If the building owner disagrees, the surveyors decide. You normally pay for the extra works.
Who pays for works asked for in a counter notice?
You do, normally. The adjoining owner who asks for additional works through a counter notice usually pays for them, because they are carried out for their benefit rather than the building owner's. The cost rules are in section 11.
The building owner may also ask you for security before carrying out counter-notice works, so they are not left out of pocket. If the amount of security or the cost of the extras is disputed, the surveyors decide.
The building owner still pays for their own works and normally the reasonable surveyors' fees for the dispute as a whole, although surveyors may apportion fees linked to the counter-notice works differently.
Can I choose my own party wall surveyor if my neighbour is paying?
Yes. As the adjoining owner you may appoint your own surveyor rather than agreeing to the building owner's surveyor acting for you both, and the building owner normally pays the reasonable fees of both surveyors under section 11.
Your surveyor must still act impartially and work to the Act, not simply follow your instructions. Their fees must be reasonable: the building owner can challenge excessive charges, and the surveyors or the third surveyor decide what is reasonable.
Choosing someone with a clear, sensible fee basis helps keep things smooth. Read what happens if the adjoining owner chooses an expensive surveyor.
Should I get a schedule of condition even if I consent?
Yes, it is usually a good idea. A schedule of condition is a written and photographic record of your property before work starts. The Act does not require one, and if you consent there is no award to include it, but without a record it can be hard to prove that cracks or other damage are new.
You can ask the building owner to arrange one as a condition of your consent, have one done yourself, or at least take clear, dated photos of the rooms and walls next to the works. Share a copy with the building owner so the record is agreed before work begins.
Our guide explains why a schedule of condition matters.
What rights do adjoining owners have under the Party Wall Act?
Adjoining owners have several important protections under the Act, including the right to:
- receive proper written notice before notifiable work starts;
- consent, or dissent and have the work settled by impartial surveyors;
- appoint your own surveyor, normally at the building owner's cost;
- serve a counter notice asking for extra works, within one month;
- ask for security for expenses before work starts;
- be compensated for loss or damage caused by the work, under section 7;
- appeal an award to the county court within 14 days.
You also have duties, such as allowing access on 14 days' notice for work under the Act. Our guide to the Party Wall Act 1996 covers these in more detail.
Can I ask for security before the party wall work starts?
Yes. Under section 12, an adjoining owner can ask the building owner, before work starts, to provide security for expenses. This is usually money held so that you are protected if the work is left unfinished and your property is exposed or unsafe.
If you cannot agree the amount or terms, the surveyors decide. It is not appropriate for every project; it is more often requested for larger or riskier works, such as basements and deep excavations, or where there are doubts about the building owner's ability to finish.
Read more about security for expenses.
My neighbour is building on the boundary. What can I do?
If your neighbour wants to build a new wall on the boundary where none exists, they must serve a notice under section 1 at least one month before starting. They cannot build it astride the boundary without your written consent; if you do not consent within 14 days, the wall must be built wholly on their land.
Even then, they may place projecting footings under your land where needed, but must compensate you for any damage. Disagreements about the work can be settled by surveyors. The Act does not decide where the legal boundary lies, so get separate advice if you think the wall is on your land.
If work started without notice, you may have common law remedies such as an injunction. See our section 1 guide.
Consent, dissent and disputes 15
What happens if my neighbour consents to my party wall notice?
If your neighbour consents in writing, you can carry out the work described in the notice without appointing surveyors or obtaining an award. Work can start when the notice period ends, or earlier if the written consent agrees an earlier date.
Consent covers only the work in the notice, so a new notice may be needed if your plans change materially. You still owe the duties in section 7: avoid unnecessary inconvenience and compensate for any damage. If a dispute arises later, for example over damage, surveyors can usually be appointed.
It is sensible to record the condition of the neighbour's property before work starts. Our guide explains the difference between consent and acknowledgement.
What happens if my neighbour dissents to my party wall notice?
If your neighbour dissents, a dispute arises and must be settled by surveyors under section 10. Either one agreed surveyor acts for both of you, or you each appoint your own surveyor and they select a third surveyor.
The surveyors usually record the condition of the neighbour's property and then make a party wall award setting out the right to do the work, how and when it is done, and who pays the costs. Once the award is served and the notice period has ended, you can start.
Dissent is not a refusal of the work itself; it is a request for the work to be regulated. See the timeline of a party wall dispute.
What happens if my neighbour doesn't respond to a party wall notice within 14 days?
For a section 3 or section 6 notice, a dispute is deemed to have arisen once 14 days pass without written consent, under section 5 and section 6(7). You then need surveyors and an award before starting.
Write to your neighbour asking them to appoint a surveyor. If they do not do so within 10 days, you may appoint a surveyor on their behalf under section 10(4). That surveyor acts impartially and works with your surveyor to produce the award.
For a section 1 notice to build a new wall astride the boundary, silence is not a dispute: without consent within 14 days, the wall must be built wholly on your own land. Read more on ignored notices.
Does silence mean my neighbour agrees to the party wall notice?
No. Silence is never consent under the Act. If your neighbour does not consent in writing within 14 days of a section 3 or section 6 notice, a dispute is treated as having arisen under section 5, and surveyors must be appointed to make an award before you start the work.
For a section 1 notice about a new wall astride the boundary, silence is not treated as a dispute. Instead, without written consent you must build the wall wholly on your own land.
Do not rely on a verbal "that's fine" either. If your neighbour is happy, ask them to sign and return a written consent so there is a clear record.
Can my neighbour refuse a party wall agreement?
Your neighbour can refuse to consent, but that usually cannot stop the work. Refusing means a dispute arises, and surveyors appointed under section 10 then make a party wall award setting out how the work is done. Once the award is served and the notice period has ended, you can go ahead.
The main exception is a new wall astride the boundary under section 1. Your neighbour can refuse consent to that, in which case you must build the wall wholly on your own land.
So in practice a refusal changes the route rather than the outcome: you get an award instead of written consent. Our guide to notices, awards and agreements explains the difference.
Can my neighbour stop all the works by dissenting?
No. Dissenting does not give your neighbour a veto. It means the notifiable work must wait until surveyors have made and served an award and the notice period has ended, but the award will normally confirm your right to carry out the work.
Parts of a project that are not notifiable under the Act are not controlled by the party wall process, although other rules such as planning and Building Regulations still apply. Starting notifiable work before an award, without consent, risks an injunction.
The award may set conditions, such as working hours, protection and methods, which are designed to protect the neighbour's property rather than stop the project. Under section 10, the award is binding on both owners unless successfully appealed.
When does a party wall dispute arise?
A dispute arises when the owners do not agree in writing about notifiable work. It usually happens in one of these ways:
- the adjoining owner dissents from a section 3 or section 6 notice;
- the adjoining owner does not consent within 14 days, so a dispute is deemed to have arisen;
- the building owner does not consent to a counter notice within 14 days;
- a disagreement comes up later, for example about damage, access or costs.
Any of these is settled under section 10 by appointing surveyors. "Dispute" here is a technical term: it often just means the work will be regulated by an award, not that the neighbours have fallen out.
What happens when a party wall dispute arises?
The dispute is settled by surveyors under section 10. The usual steps are:
- both owners appoint one agreed surveyor, or each appoints their own, in writing;
- where there are two surveyors, they select a third surveyor straight away;
- the surveyors usually record the condition of the adjoining property;
- they agree and serve an award covering the work, how and when it is done, and costs;
- either owner may appeal to the county court within 14 days of service.
Once the award is served and the notice period has ended, the work can start. Our party wall timeline flowchart shows the process step by step.
What if my neighbour refuses to appoint a party wall surveyor?
You can appoint one for them. Under section 10(4), once a dispute has arisen you can send your neighbour a written request to appoint a surveyor. If they refuse, or fail to appoint within 10 days, you may appoint a surveyor on their behalf.
The surveyor you appoint for them must be independent of you and must act impartially, just like any other party wall surveyor. They then work with your own surveyor to produce the award, which is binding on both owners.
Keep copies of the request and proof of how it was served, as the 10-day period needs to be clear. Our step-by-step guide to appointing a surveyor covers this.
Can a neighbour block the party wall process by doing nothing?
No. The Act is designed so that inaction cannot stop the process. If your neighbour does not consent within 14 days, a dispute is deemed to arise. If they then do not appoint a surveyor within 10 days of a written request, you may appoint one on their behalf.
The same applies to surveyors. If one surveyor refuses or fails to act effectively within 10 days of a written request, the other may proceed alone and make an ex parte award under section 10.
These steps take time, so serve notice early. Read about ex parte awards.
Can my neighbour withdraw consent after giving it?
Usually not for the work they have already consented to. The Act sets out no procedure for withdrawing written consent, and it is generally treated as settling the right to carry out the work described in the notice.
That does not leave your neighbour without protection. If a disagreement arises later, for example about damage, working methods or access, a dispute can still arise and surveyors can usually be appointed under section 10 to deal with it. Consent also covers only the work described, so if your plans change materially a fresh notice may be needed.
The legal position can depend on the facts, so take advice if consent is disputed. See when a neighbour signs then objects.
Is a text message or email consent to a party wall notice valid?
It may be, but it is risky. Consent to a section 3 or section 6 notice must be in writing, and an email or text can count as writing. The problem is proof: a short message may not clearly identify the notice, the property, the work or who is consenting.
If ownership is shared, all owners may need to consent, and a text from one person may not be enough. A clear, signed consent form that refers to the notice and its date is far safer for both sides.
Note that serving notices by email is a separate issue: it is only valid if the recipient has agreed to accept notices that way. Read more on text message consent.
Is the Party Wall Act open to abuse?
It can be misused, but it contains safeguards. Common complaints include high surveyors' fees, surveyors appointed where written consent would have done, delays, and adjoining owners using the process to slow a project.
The Act limits these problems in several ways. Surveyors must act impartially, fees must be reasonable, and either owner can refer a matter to the third surveyor. Awards can be appealed to the county court within 14 days. Inaction cannot block the process because of the 10-day rules in section 10.
Talking to neighbours early, sharing drawings and agreeing fee bases in advance prevents most problems. If you think fees are excessive, see how to dispute surveyors' fees.
How do I keep a good relationship with my neighbour during the party wall process?
Talk to your neighbour before the notice arrives. A formal notice out of the blue can feel hostile, while a friendly conversation and a covering letter often lead to quicker consent or a smoother award.
Practical steps that usually help:
- share drawings and explain the timetable and noisy phases;
- suggest an agreed surveyor if they are comfortable with that;
- agree working hours, access and how to contact the builder;
- keep the site tidy and deal with any damage promptly.
Respond to concerns quickly and in writing so nothing is misunderstood. Our party wall cover letter template can help you introduce the notice in a friendly way.
What are the most common party wall problems?
Most party wall problems come from missed steps or poor communication rather than the work itself. Common issues include:
- work starting without notice, or before consent or an award;
- notices that are inaccurate or incomplete, and so may be invalid;
- neighbours not replying, delaying the appointment of surveyors;
- disagreements over surveyors' fees;
- damage claims where nobody recorded the property's condition beforehand;
- works changing after the award without a new or addendum award.
Serving notice early, recording the property's condition and keeping neighbours informed avoid most of these. See our list of common party wall mistakes.
Party wall surveyors 21
What does a party wall surveyor do?
A party wall surveyor resolves disputes between neighbours about work covered by the Party Wall Act. Appointed under section 10, they act impartially, whoever appointed them.
Their main job is to make a party wall award. This may settle the right to do the work, the time and manner of doing it (such as hours, methods and protection) and other matters such as costs. They usually record the condition of the adjoining property beforehand, review drawings, and may inspect again after the works if damage is alleged.
Many surveyors also help building owners prepare and serve notices. Read more in what is a party wall surveyor.
Do I need a party wall surveyor?
Only if there is a dispute. If your neighbour gives written consent to your notice, you can proceed without a surveyor or an award. If they dissent, or do not consent within 14 days of a section 3 or section 6 notice, surveyors must be appointed under section 10.
Many building owners still use a surveyor to prepare and serve notices correctly, since a defective notice can be invalid. Neighbours sometimes use one to record the condition of their property even when they consent.
Our guide explains when you need a party wall surveyor.
When should I appoint a party wall surveyor?
As a building owner, appoint one early, ideally before you serve notice if you want help preparing it. Notice periods are two months for work to a party wall and one month for excavation or a new boundary wall, and if your neighbour dissents the award must be served before notifiable work starts. Leaving it late can delay your builder.
As an adjoining owner, you appoint a surveyor once you decide to dissent. If you receive a written request to appoint one after a dispute has arisen, do so within 10 days, or the building owner may appoint one for you under section 10(4).
If there's no dispute, do I need a party wall surveyor?
No. Surveyors are needed under the Act only when a dispute arises. If your neighbour consents in writing, no surveyor or award is required and you can proceed once the notice period ends, or earlier if the consent says so.
You may still choose to use a surveyor for other tasks, such as preparing accurate notices or recording the condition of the neighbour's property. That is optional and agreed privately rather than under section 10.
If a dispute arises later, for example about damage, surveyors can usually be appointed then. Read when you need a party wall surveyor.
What is an agreed party wall surveyor?
An agreed surveyor is a single surveyor appointed jointly by both owners to settle the dispute, under section 10(1)(a). Often the building owner's surveyor is proposed and the adjoining owner agrees to them acting for both.
The agreed surveyor must act impartially between the two owners, record the condition of the adjoining property where appropriate, and make the award. Because only one surveyor is involved, the process is usually quicker and cheaper.
The adjoining owner does not have to accept an agreed surveyor and can appoint their own instead. Compare the options in agreed surveyor vs two surveyors.
What is the difference between an agreed surveyor and two surveyors?
With an agreed surveyor, one surveyor acts for both owners. With two surveyors, each owner appoints their own, and those two select a third surveyor straight away to decide anything they cannot agree. Both routes are set out in section 10, and all surveyors must act impartially.
An agreed surveyor is usually faster and cheaper. Two surveyors can give the adjoining owner more confidence but cost more, as the building owner normally pays both. As a guide, HomeOwners Alliance 2026 figures put an agreed surveyor at £900–£2,700 for most standard projects and two surveyors at £1,800–£5,400. Fees vary by area, complexity and number of neighbours; see our party wall surveyor cost guide.
Do I have to use the same party wall surveyor as my neighbour?
No. As the adjoining owner, you can agree to the building owner's surveyor acting as the agreed surveyor for both of you, or you can appoint your own surveyor under section 10. The building owner normally pays the reasonable fees of both surveyors.
Using one agreed surveyor is usually quicker and cheaper, and that surveyor must act impartially. Some adjoining owners prefer their own surveyor, especially for larger or riskier work. Either choice is legitimate.
If you choose your own, appoint them in writing and tell the building owner promptly. Compare cost and speed of each option.
What is a third surveyor?
A third surveyor is selected by the two owners' surveyors straight away after they are appointed, under section 10. They are not involved day to day and are only called on if needed.
Either surveyor or either owner can refer a matter to the third surveyor, for example if the two surveyors cannot agree on the award or on fees. The third surveyor then makes a decision, which may take the form of an award, and also decides who pays the costs of the referral.
Referrals are relatively uncommon, but the role is an important safeguard. Read our guide to the third surveyor.
Can I act as my own party wall surveyor?
No. The Act defines a surveyor as a person who is not a party to the matter, under section 20. As an owner in the dispute, you cannot act as the surveyor, and any award you made would be open to challenge.
You can still do a lot yourself. Any owner may prepare and serve their own party wall notice, and if your neighbour consents in writing, no surveyor is needed at all.
If a dispute arises, appoint someone independent who understands the Act. You can find a party wall surveyor through our directory.
Can a friend or relative be my party wall surveyor?
Legally they may, as long as they are not a party to the dispute, but it is rarely wise. The Act only excludes a person who is party to the matter, so a co-owner cannot act, but a friend or relative is not automatically barred.
The difficulty is impartiality and competence. A party wall surveyor must act impartially between both owners and understand the Act, and a close relationship can lead to the award being challenged. An inexperienced surveyor may also make procedural errors that put the award at risk.
Check that anyone you appoint has relevant experience and professional indemnity insurance. See our red flags when hiring a surveyor.
Does a party wall surveyor act for me?
Not in the sense of an advocate. A surveyor appointed under section 10 has a duty to act impartially and resolve the dispute fairly in line with the Act, even though you appointed them.
In practice, your surveyor will make sure your concerns are properly considered: protection of your property, working hours, access and how damage will be dealt with. But you cannot instruct them to take your side or to reach a particular outcome.
If you want someone to argue your case, for example about a boundary or a legal claim, that is a job for a solicitor. Read what a party wall surveyor does.
Does a party wall surveyor have to be chartered?
No. The Party Wall Act does not require a surveyor to hold any particular qualification or membership. Under section 20, a surveyor is any person who is not a party to the matter.
Membership of a relevant body is still a useful sign of competence. The main ones are RICS, the Faculty of Party Wall Surveyors (FPWS) and the Pyramus & Thisbe Society.
What matters most is experience of similar projects, a sound understanding of the Act and professional indemnity insurance. See RICS vs FPWS.
How do I choose a party wall surveyor?
Choose someone with solid experience of projects like yours, a good grasp of the Act and a clear fee basis. Useful things to weigh include:
- experience with your type of work, such as loft conversions or basements;
- membership of a relevant body such as RICS, FPWS or the Pyramus & Thisbe Society;
- professional indemnity insurance;
- a written fee quote, fixed or hourly;
- availability to meet your timetable.
Remember that the surveyor must act impartially, so avoid anyone promising to "fight your corner". Our guide on how to choose a party wall surveyor covers this in more detail.
What should I ask a party wall surveyor before appointing them?
Ask questions that test their experience, costs and availability before you appoint them in writing. Useful questions include:
- How many similar projects have you handled?
- Are you a member of a relevant professional body?
- Do you hold professional indemnity insurance?
- Is your fee fixed or hourly, and what does it include?
- Will you prepare the schedule of condition yourself?
- How soon can you start and serve the award?
Compare a few answers before deciding, as fees and approach vary. You can request party wall quotes to compare surveyors.
How do I check a party wall surveyor's credentials?
Ask for evidence and check it independently. If a surveyor says they belong to RICS, FPWS or the Pyramus & Thisbe Society, confirm their membership using that body's member directory.
Also ask for a copy of their professional indemnity insurance certificate, check that their business name and address are consistent across their paperwork, and ask how many similar projects they have handled. A surveyor who is reluctant to share these details is a warning sign.
Membership is not legally required, so experience and insurance matter just as much as letters after a name. Our guide explains how to verify a surveyor's credentials.
What if I'm unhappy with my party wall surveyor?
Raise your concerns with the surveyor first, in writing, and give them a chance to respond. If that does not work, use their firm's complaints procedure, and if they belong to a professional body you can complain to that body.
You cannot simply cancel the appointment, as appointments under section 10 cannot be rescinded. But if there are two surveyors, either owner can refer a matter to the third surveyor. If you disagree with the award itself, you can appeal to the county court within 14 days of it being served.
Our dispute resolution checklist sets out the options in order.
Can I sack my party wall surveyor?
Usually not. Under section 10, appointments of party wall surveyors must be in writing and cannot be rescinded by either party. Once you have appointed a surveyor, you cannot dismiss them simply because you disagree with them.
A replacement can be appointed if the surveyor dies or declares themselves incapable of acting. Some surveyors will step down if the relationship has broken down, but that is their decision.
If you have concerns about their conduct, you can complain to their firm or professional body, refer matters to the third surveyor, or appeal the award within 14 days. Read what to do if you want to fire your surveyor.
What if my neighbour's party wall surveyor won't respond?
Your surveyor can serve a written request on them to act. If the other surveyor refuses to act effectively, or neglects to act for 10 days after the request, your surveyor may proceed alone under section 10(6) and (7) and make an ex parte award.
An ex parte award is as binding as any other award, but the procedure must be followed carefully, so keep records of all correspondence and when requests were served. Your surveyor should still act impartially and consider the neighbour's interests.
Read more about ex parte awards.
How do I appoint a party wall surveyor in writing?
Write a short, signed and dated letter appointing the surveyor under section 10. It should give your name and address, the property concerned, the surveyor's name and address, and refer to the notice and the work it covers.
If the property is jointly owned, all owners should sign. Send a copy to the surveyor and keep one yourself, and tell the other owner who you have appointed. Many surveyors provide their own appointment form.
Appointments cannot be rescinded once made, so choose carefully before signing. Our step-by-step guide to appointing a surveyor walks through the process.
What are FPWS, RICS and the Pyramus & Thisbe Society?
They are professional bodies whose members include party wall surveyors. Membership is not required by the Act, but it can indicate training and a commitment to professional standards.
- RICS (Royal Institution of Chartered Surveyors) is the main professional body for chartered surveyors across many specialisms.
- FPWS (Faculty of Party Wall Surveyors) is a body focused specifically on party wall matters.
- The Pyramus & Thisbe Society is a specialist society for people working on party wall matters, with an emphasis on education.
Membership grades and requirements differ, so ask a surveyor about their experience as well. See RICS vs FPWS.
How do I find a party wall surveyor near me?
Use our find a surveyor directory to search for party wall surveyors in your area. A local surveyor may know common building types and ground conditions nearby, though surveyors often cover wide areas.
Shortlist two or three, check their experience with your type of work, confirm any professional body membership and insurance, and compare written fee quotes before appointing anyone in writing.
If you are the adjoining owner, you are free to choose your own surveyor rather than accept the building owner's; the building owner normally pays reasonable fees for both.
Party wall awards 17
What is a party wall award?
A party wall award is the legal document that party wall surveyors make to settle a dispute under the Party Wall etc. Act 1996. A dispute arises when your neighbour dissents from your notice, or does not give written consent within 14 days, and surveyors are then appointed under section 10.
The award sets out whether you can carry out the notified work, when and how it must be done, and any other matter arising from the dispute, including who pays the surveyors' fees. It is often what people mean when they talk about a "party wall agreement", although that phrase does not appear in the Act. Once served on both owners, the award is binding unless it is successfully appealed. See notices, awards and agreements explained.
What does a party wall award contain?
A party wall award usually contains the surveyors' decisions on the right to carry out the work, the time and manner of doing it, and any other matter arising from the dispute, as allowed by section 10(12). In practice, most awards include:
- a schedule of condition recording the neighbour's property before work starts
- drawings and details of the approved work
- permitted working hours, access arrangements and protection measures
- provisions for making good any damage, or a payment instead
- who pays the surveyors' fees and how much
The exact content depends on the project and on what the surveyors consider necessary. An award cannot deal with matters outside the Act, such as planning or rights to light.
Is a party wall award legally binding?
Yes. Under section 10(16) of the Party Wall etc. Act 1996, a party wall award is conclusive and binding on both owners, and cannot be questioned in any court, except by an appeal to the county court.
That appeal must be made within 14 days beginning with the day the award is served (section 10(17)). If nobody appeals in time, both owners must follow the award's terms, including working hours, protection measures and the payment of fees. An award is only binding if the surveyors had jurisdiction to make it; for example, an award based on an invalid notice, or one dealing with matters outside the Act, may be open to challenge.
How is a party wall award agreed and served?
A party wall award is drawn up by the surveyors, not signed by the owners. With an agreed surveyor, that one surveyor makes and signs the award. With two surveyors, they negotiate the terms and both usually sign it; if they cannot agree, either can refer the point to the third surveyor, whose decision forms an award.
The surveyors usually inspect the neighbour's property, prepare a schedule of condition and review your drawings before finalising the terms. Once made, the award must be served on both owners, by hand, by post or by another method allowed under section 15. Service matters because the 14-day appeal period runs from the day the award is served. See the timeline of a party wall dispute.
Can I appeal a party wall award?
Yes. Either owner can appeal a party wall award to the county court under section 10(17), but only within 14 days beginning with the day the award is served. The court may rescind the award or change it as it thinks fit, and may make an order about the costs of the appeal.
Appeals are court proceedings, so they can be costly and the losing side may have to pay the other side's legal costs. Take advice from a solicitor or experienced party wall surveyor quickly, because the deadline is short. Disagreements about fees or points of detail can sometimes be resolved by asking the surveyors to refer them to the third surveyor before an award is made. See how to appeal an award.
How long do I have to appeal a party wall award?
You have 14 days to appeal a party wall award. Under section 10(17), the period begins with the day the award is served on you, so the day of service counts as day one.
This is a strict deadline. If you miss it, the award usually becomes conclusive and binding under section 10(16), and you will generally lose the right to challenge its contents. If you receive an award you disagree with, check the date of service straight away and take legal advice promptly. Appeals go to the county court and the court rules on procedure apply. See how to appeal an award in the county court.
What can I do if I think the party wall award is wrong?
If you think a party wall award is wrong, first speak to the surveyor you appointed, or the agreed surveyor, and ask them to explain the decision. Before an award is made, either owner or surveyor can refer a disputed point to the third surveyor.
Once the award has been served, your main route is an appeal to the county court under section 10(17), which must be made within 14 days beginning with the day of service. If the problem is that the surveyors had no power to make the award at all, for example because the notice was invalid, a solicitor can advise whether the award may be treated as void. Act quickly, because waiting usually makes the award binding. See our dispute resolution checklist.
Can a party wall award be changed after it is served?
Usually not. Once served, a party wall award is conclusive and binding under section 10(16), and the surveyors cannot simply rewrite it. The only way to overturn or alter its contents against an owner's wishes is an appeal to the county court within 14 days of service.
However, the surveyors may make a further award, often called an addendum award, to deal with new matters that were not decided in the first award, such as a change to the design, extra work or damage that occurs during the works. Very minor clerical mistakes may sometimes be corrected, but anything that affects either owner's rights should be handled through a proper further award. See how long an award is valid for.
Can more than one party wall award be needed?
Yes. You usually need a separate award for each adjoining owner who is in dispute with you. A semi-detached house may need one award, while a mid-terrace project affecting both neighbours may need two. Where a neighbouring building is split into flats, the freeholder and each long leaseholder may be owners, so several notices and awards may be needed.
More than one award may also be needed with the same neighbour over time. If the works change materially, extra work is added, or a new issue arises such as damage, the surveyors may make an addendum award. See neighbouring property split into flats.
Does the party wall award cover all of my building work?
No. A party wall award only covers the work described in your notices that falls under the Party Wall etc. Act 1996: work to the party wall or structure under section 2, new walls at the boundary under section 1, and excavations within 3 or 6 metres under section 6.
Other parts of your project, such as an internal kitchen refit, a rear wall away from the boundary or general decoration, are not governed by the award. The award also does not replace planning permission or Building Regulations approval, and it does not give rights the Act does not grant, such as interfering with a right to light. If your plans change materially after the award, ask your surveyor whether a further award is needed. See Party Wall Act vs planning and Building Regulations.
What makes a party wall award invalid?
A party wall award may be invalid if the surveyors had no jurisdiction to make it. Common reasons include an invalid or defective notice, surveyors who were not properly appointed in writing, an award that deals with work or matters outside the Act, or an award covering works carried out before any notice was served.
The courts expect the Act's procedures to be followed strictly; in Gyle-Thompson v Wall Street Properties (1974), an award based on a defective notice was found invalid. An invalid award does not have the protection of section 10(16). Questions about validity are legal questions, so take advice from a solicitor or experienced surveyor before relying on, or refusing to follow, an award.
What is an ex parte party wall award?
An ex parte party wall award is one made by a single surveyor without the participation of the other side's surveyor. It is allowed by section 10 where one party has not engaged with the process.
If an owner fails to appoint a surveyor within 10 days of a written request, the other owner can appoint one on their behalf under section 10(4). If an appointed surveyor refuses or fails to act within 10 days of a written request, the other surveyor may proceed alone under section 10(6) and (7). The resulting award binds both owners in the same way as any other award. Surveyors should still act impartially and follow the procedure exactly. See ex parte awards explained.
Can a party wall award be made retrospectively?
Generally no, not for work already done. Following Power & Kyson v Shah [2023], surveyors have no jurisdiction under the Party Wall etc. Act 1996 over works carried out before a notice was served, so they cannot make a valid award covering that past work.
If your neighbour has started work without notice, your remedies for what has already happened are usually through the courts at common law, for example an injunction or damages for trespass or nuisance. If notifiable work remains to be done, the building owner can serve notice for those remaining works, which brings the future work within the Act and the award process. See retrospective party wall procedure.
What happens if someone ignores the party wall award?
If an owner ignores a party wall award, the other owner can enforce it through the courts, because the award is binding under section 10(16). Surveyors cannot enforce an award themselves.
Where a building owner works outside the agreed hours, methods or protection measures, the adjoining owner may seek an injunction to stop the work and claim damages. Unpaid sums awarded under the Act, such as fees or compensation, can be recovered as a civil debt. Refusing entry to someone entitled to access under section 8, knowing they are entitled, is a criminal offence under section 16. Keep records and take legal advice before acting. See what to do if a neighbour ignores an award.
Does a party wall award move to a new owner if the property is sold?
Usually, yes in practice. Rights and obligations under the Act generally attach to the owners of the properties, so a buyer may step into the seller's position, but this should be confirmed in writing between seller, buyer and the surveyors.
An award is not registered against the title and will not show on local searches. Buyers' solicitors normally ask about party wall notices, awards and disputes through the property information form (TA6). If you are selling during or after party wall works, give copies of notices, awards and schedules of condition to your solicitor, and agree who is responsible for outstanding fees, making good and any security held. See how long an award is valid for.
How do I check whether a party wall award is genuine?
You can check a party wall award by confirming that it matches the notices served, names the correct owners and properties, and is signed by the surveyor or surveyors properly appointed in writing. It should also name the third surveyor where two surveyors are involved, describe the specific works with drawings, and include a date and details of service.
Contact the surveyor named in the award directly, using contact details you find independently rather than those printed on the document. You can also check whether they belong to a professional body such as RICS, the Faculty of Party Wall Surveyors or the Pyramus & Thisbe Society, and whether they hold professional indemnity insurance. If anything does not match, take advice before relying on it. See how to check if an award is genuine.
What is an addendum party wall award?
An addendum award is a further award made by the same surveyors to deal with a matter that the original award did not cover. Under section 10(12), surveyors can settle any matter arising out of or incidental to the dispute, so they may make more than one award.
Addendum awards are often used when the design changes materially, extra notifiable work is added, a structural detail needs approval later, or damage needs to be assessed and settled at the end of the works. An addendum award is binding in the same way as the original and can be appealed within 14 days of service. It cannot be used to reopen points already decided in the original award.
Schedules of condition 9
What is a schedule of condition?
A schedule of condition is a detailed written and photographic record of your neighbour's property, made before party wall works start. It notes existing cracks, stains, damp and other defects in the rooms and areas most likely to be affected, such as the rooms on the other side of the party wall.
It is usually prepared by the surveyor or surveyors appointed under the Party Wall etc. Act 1996 and attached to the award. After the works, the property can be compared against the schedule to see whether any new damage has appeared. This makes it much easier to settle claims fairly under section 7. See why you need a schedule of condition.
Is a schedule of condition legally required?
No. The Party Wall etc. Act 1996 does not require a schedule of condition. However, it is strongly advised, and surveyors usually include one as part of the party wall award.
Even if your neighbour gives written consent and no award is needed, it is still sensible to agree a schedule of condition before work starts. Without one, it can be very difficult to show whether a crack or other defect was already there or was caused by the works. Both owners can sign and date a simple record with photographs if a surveyor is not involved, though a professional schedule usually carries more weight. See our example schedule of condition.
Why does a schedule of condition protect both neighbours?
A schedule of condition protects both neighbours because it creates an agreed starting point that neither side can later dispute.
For the adjoining owner, it provides evidence that damage appearing after the works was not there before, which supports a claim for repair or compensation under section 7(2). For the building owner, it shows which defects already existed, so you are not asked to pay for cracks, damp or wear that were present before your work began. A clear record also reduces arguments, saves surveyors' time at the end of the project and helps keep neighbour relations on a better footing. See why you need a schedule of condition.
Who pays for a schedule of condition?
The building owner usually pays for the schedule of condition. Where surveyors are appointed after a dispute, the schedule is normally part of the surveyors' work, and their reasonable fees are usually paid by the building owner as set out in the award.
If your neighbour has consented to the works and you arrange a schedule of condition anyway, you will usually pay for it, as it protects your position as well as theirs. If the adjoining owner wants a separate, more extensive record for their own purposes, they may need to pay for it themselves. Costs vary with the size and age of the property and how many rooms are recorded. See schedule of condition costs.
What does a good schedule of condition include?
A good schedule of condition records the neighbour's property clearly enough that anyone could compare it after the works. It usually includes:
- the property address, date of inspection and who attended
- a room-by-room written description of walls, ceilings, floors and joinery, focusing on areas near the works
- existing cracks with their location, length and approximate width
- dated photographs, ideally numbered and cross-referenced to the text
- external elements such as the party wall, roof, chimneys, paths and boundary walls where relevant
Vague notes such as "general wear" are of little use. It should be agreed by both sides, or both surveyors, and attached to the award. See our schedule of condition checklist.
Can a schedule of condition prove who caused damage?
Not on its own. A schedule of condition proves what the property looked like before the works began, which is strong evidence when new damage appears afterwards, but it does not by itself prove what caused that damage.
If a new crack appears that was not recorded, the surveyors will usually consider the type, location and timing of the damage alongside the nature of the works. Where they are satisfied the work caused it, the building owner must make good or pay compensation under section 7(2), and the surveyors may award a payment instead of repairs. Damage that was already recorded, or has another cause, will usually not be the building owner's responsibility. See evidence needed to prove damage.
What if my neighbour won't let anyone in to do a schedule of condition?
If your neighbour refuses access, you cannot force entry for a voluntary schedule of condition, but you can protect your position. Where surveyors have been appointed under the Act, section 8 gives them a right to enter during usual working hours for the purpose of their appointment, after giving notice.
If access is still refused, record what you can from your side and from public areas, keep dated photographs, and keep written evidence of your requests and the refusal. A neighbour who has refused access may find it harder to prove later that damage was caused by your works. Knowingly refusing entry to someone entitled to it under the Act, without reasonable excuse, can also be an offence. See what to do if a neighbour refuses a schedule.
Is there a final inspection after the party wall works?
Usually, yes. Most party wall awards provide for the surveyors to inspect the adjoining owner's property again once the notifiable works are finished, and to compare it with the schedule of condition.
If new damage is found, the surveyors decide what making good is needed or may award a payment instead, under section 7. This is often settled in a further award. If your neighbour consented and no surveyors were involved, it is still sensible to arrange a joint walk-round when the work is finished and record any concerns in writing. Some damage, such as settlement cracks, may take time to appear, so keep your records and report problems promptly. See if a neighbour says your work caused damage.
What's the difference between a schedule of condition and a home survey?
A schedule of condition and a home survey do different jobs. A schedule of condition is a factual record of a neighbouring property's current state, made before party wall works so that any later damage can be identified. It describes defects but does not usually assess value, give advice or recommend repairs.
A home survey, such as an RICS Level 2 survey, is commissioned by a buyer to assess the condition of a property they plan to buy and to flag risks and repairs. It is not designed to record every crack in detail and is not normally used as the starting point for a party wall damage claim. See RICS Level 2 survey vs schedule of condition.
Costs and who pays 18
How much does a party wall agreement cost?
There is no fixed price. If your neighbour gives written consent to your notice, the cost may be limited to preparing and serving the notice, plus an optional schedule of condition. If they dissent or do not reply within 14 days, surveyors must be appointed and most of the cost is their fees.
HomeOwners Alliance 2026 figures put the cost of an agreed surveyor at around £900 to £2,700 for most standard projects, and around £1,800 to £5,400 where each owner appoints a surveyor. These figures vary by area, complexity and number of neighbours. The building owner usually pays. See our party wall surveyor cost guide.
How much does a party wall surveyor cost?
A party wall surveyor's fee depends on the project, the property and how many neighbours are involved. HomeOwners Alliance 2026 figures suggest around £900 to £2,700 for an agreed surveyor acting for both owners on most standard projects, and around £1,800 to £5,400 in total where each owner has their own surveyor.
Checkatrade 2026 figures put average hourly rates at around £200. Prices vary by area, the complexity of the work, the age of the buildings and whether there is a dispute. Each adjoining owner may need their own award, so a terraced project can cost more than a semi-detached one. Use our party wall surveyor cost guide for more detail.
Who pays for the party wall surveyor?
The building owner, the person carrying out the work, usually pays. Under section 10(13) the surveyors decide who pays the reasonable costs of making the award, and because the works are for the building owner's benefit, this is normally the building owner.
That usually covers your own surveyor, your neighbour's surveyor and any agreed surveyor. The surveyors can decide differently in some cases, for example where the adjoining owner has asked for extra work by counter notice or has caused unnecessary costs. Fees must be reasonable, and disputes about them can be referred to the third surveyor. See our party wall surveyor cost guide.
Do I have to pay for my neighbour's party wall surveyor?
Usually, yes. If you are the building owner and your neighbour appoints their own surveyor, you will normally pay that surveyor's reasonable fees as well as your own. Your neighbour is entitled to their own surveyor and should not be left out of pocket because of work they did not ask for.
The amount is set in the award, and the fees must be reasonable. If you think they are too high, your surveyor can challenge them and refer the question to the third surveyor. To reduce costs, you can propose a single agreed surveyor for both owners, but your neighbour is free to refuse. See if your neighbour chooses an expensive surveyor.
Who pays the third surveyor?
The building owner usually pays the third surveyor if they are called on, unless the award says otherwise. The third surveyor is selected at the start under section 10, but is only involved, and only charges, if a matter is referred to them.
When a referral is made, the third surveyor decides the point in dispute and also decides who pays their fees. They may order the owner or surveyor who made an unreasonable referral, or whose position was not upheld, to pay some or all of the cost. In most projects the third surveyor is never called on, so there is no fee to pay. See our guide to the third surveyor.
Who decides how party wall costs are split?
If the owners cannot agree, the party wall surveyors decide how costs are split. They set this out in the award, including who pays for the work, for any repairs to a defective party wall and for the surveyors' own fees.
They apply the rules in section 11, which usually place the cost on the building owner but allow sharing where both owners use the wall and are responsible for its disrepair. Where costs are to be shared, the building owner should send an account of expenses within two months of completing the work under section 13. Either owner can appeal the award to the county court within 14 days of service. See how to dispute surveyors' fees.
Is there a fixed fee or hourly rate for party wall surveyors?
Both are common. Many party wall surveyors quote a fixed fee for standard projects such as loft conversions or rear extensions, while others charge an hourly rate, especially for the adjoining owner's surveyor or for complex work.
Checkatrade 2026 figures put average hourly rates at around £200. HomeOwners Alliance 2026 figures suggest around £900 to £2,700 for an agreed surveyor on most standard projects, and around £1,800 to £5,400 where there are two surveyors. All of these vary by area, complexity and number of neighbours. Ask what is included, such as the schedule of condition, final inspection and travel. See our party wall surveyor cost guide.
How can I keep party wall costs down?
The most effective way is to talk to your neighbours before serving notice. If they understand the work and give written consent within 14 days, surveyors may not be needed at all.
Other ways to keep costs down:
- serve accurate, complete notices so they do not have to be reissued
- suggest one agreed surveyor for both owners, though your neighbour can refuse
- have clear drawings and structural details ready before surveyors start
- plan all notifiable work together, so you do not need extra awards later
Even with consent, a schedule of condition is a sensible small investment. Use our party wall budget calculator to estimate costs.
Can I challenge my neighbour's surveyor's fees?
Yes. You only have to pay fees that are reasonable. If your neighbour's surveyor's fees seem too high, ask your own surveyor to raise it with them first, as surveyors often resolve fee questions between themselves.
If they cannot agree, either surveyor or either owner can refer the fees to the third surveyor, who will decide what is reasonable. If the fees have already been set in a served award, your route is an appeal to the county court under section 10(17) within 14 days beginning with the day of service. Ask for a breakdown of time spent, as this helps show whether the fee is reasonable. See how to dispute surveyors' fees.
What if my neighbour chooses an expensive surveyor?
Your neighbour is free to choose their own surveyor, and you usually pay that surveyor's fees. However, you only have to pay what is reasonable for the work involved, not whatever the surveyor chooses to charge.
If the fees seem excessive, your surveyor can challenge them and, if necessary, refer the question to the third surveyor under section 10. It also helps to agree fee arrangements early, and to compare against typical figures; HomeOwners Alliance 2026 figures put two-surveyor costs at around £1,800 to £5,400 for most standard projects, though fees vary by area and complexity. See if your neighbour chooses an expensive surveyor.
What other costs might the building owner pay?
Apart from surveyors' fees and the building work itself, the building owner may have to pay:
- compensation for any loss or damage to the neighbour's property caused by the work, under section 7
- the cost of protecting the neighbour's land and buildings, such as hoarding or shoring
- security for expenses, if the adjoining owner asks for money to be held before work starts
- the third surveyor's fees, if a matter is referred and the award puts the cost on you
The surveyors may also award a payment instead of making good damage. Some of these costs vary greatly, so it is wise to build a contingency into your budget. See who pays for damage.
What are enclosure costs?
Enclosure costs are a payment the adjoining owner makes when they later use a wall that the building owner built and paid for. Under section 11(11), if the adjoining owner makes use of the wall, or of extra height or thickness added at the building owner's expense, they must pay a due proportion of its cost.
A common example is where you build a wall on the boundary and your neighbour later builds an extension against it, using it as part of their own building. The amount usually reflects the value of the part of the wall they use, and the surveyors decide it if the owners cannot agree.
What if I can't recover costs from my neighbour?
If your neighbour owes money under the Act or an award, such as their share of shared works or the cost of counter-notice works, you can recover it through the courts. Under section 17, any sum payable under the Act, other than a fine, can be recovered as a civil debt.
Before that, make sure the amount has been set out in the award or account of expenses, and ask for payment in writing. For works your neighbour asks for by counter notice, you can ask for security for expenses before carrying out the extra work, which reduces the risk of non-payment. Take legal advice before starting court action. See security for expenses.
How do I get a party wall quote?
You can get a party wall quote by contacting several party wall surveyors with the key details of your project. Include your address, the neighbouring addresses, a description of the work, any drawings or structural details, and whether you have already served notice.
Ask each surveyor whether the fee is fixed or hourly, what it includes, such as notices, schedules of condition and final inspections, and whether it covers one or more neighbours. Check their experience, professional body membership and professional indemnity insurance. You can request quotes from party wall surveyors through our site.
Who pays if the party wall work has already started?
The building owner remains responsible for the cost and consequences of their work. If notifiable work has started without notice, the Party Wall etc. Act 1996 process does not cover the works already carried out; after Power & Kyson v Shah [2023], surveyors have no jurisdiction over them.
Instead, the adjoining owner may claim at common law, for example seeking an injunction or damages for trespass or nuisance, and the building owner may face legal costs as well as the cost of any damage. If notifiable work remains, the building owner can serve notice for it, and the usual rules then apply: the building owner normally pays the surveyors' fees for that part. See neighbour building without a party wall agreement.
Who is responsible for repairing a party wall?
Both owners usually share responsibility for repairing a party wall, because each owns part of it. Under section 2, an owner can repair a party wall that is defective or out of repair, after serving notice.
Where the work is needed because of a defect or want of repair, section 11 says the cost is shared in proportion to each owner's use of the wall and responsibility for the defect. If one owner caused the damage, they may be responsible for the full cost. Where the owners disagree, the surveyors decide the split in an award. Repairs carried out only for your own benefit, such as for an extension, are usually your cost. See our guide to section 2.
Can I get compensation under the Party Wall Act?
Yes. Under section 7(2), the building owner must compensate adjoining owners and occupiers for any loss or damage resulting from work carried out under the Act.
This usually means making good damage to your property, but the surveyors may award a payment instead. Compensation can also cover other losses caused by the work, depending on the facts. A schedule of condition made before the work started is the best evidence that damage is new. If you think the work has caused damage, tell the building owner and the surveyors promptly in writing, with dated photographs. Compensation is not payable for damage that existed before the work or has another cause. See who pays for damage.
During the works: access, noise and protection 12
Do I have to let my neighbour's builders onto my property?
Usually yes, if entry is needed to carry out work authorised by the Party Wall etc. Act 1996. Section 8 lets the building owner, their workmen and the surveyors enter adjoining land and buildings during usual working hours to carry out works in pursuance of the Act.
They must normally give you 14 days' notice first, unless it is an emergency. The right only covers works under the Act, not general building work, and the building owner must avoid unnecessary inconvenience and compensate you for any loss or damage. Access arrangements, such as times and protection, are often set out in the award. See our guide to rights of access under the Act.
How much notice is needed before access?
At least 14 days' notice of the intended entry is required, except in an emergency. Under section 8, the building owner must give this notice to the owner and the occupier of the land or building to be entered.
This is separate from the party wall notice itself. Serving a party structure or excavation notice does not, on its own, count as notice of entry. In an emergency, the Act requires only such notice as is reasonably practicable. The award will often set out practical details such as the hours when access may be taken and how your property will be protected.
Can builders break in to get access?
Only in limited circumstances. If the premises are closed, section 8 allows the building owner, their workmen and surveyors to break open fences or doors to gain entry, but only if they are accompanied by a police officer.
The right applies only to entry needed for works authorised by the Act, during usual working hours, and after the required 14 days' notice (except in an emergency). Any damage caused must be compensated under section 7. In practice, forced entry is rare; most access is arranged by agreement or through terms in the award. See our guide to rights of access.
Can I refuse access to my neighbour's builders?
Not if the access is properly authorised under the Act. Under section 16, an occupier who refuses entry, knowing or having reasonable cause to believe the person is entitled to enter, commits an offence unless they have a reasonable excuse. The penalty is a fine.
You can, however, expect the rules to be followed: 14 days' notice (except in an emergency), entry during usual working hours, and access only for works under the Act. If you have concerns about security, timing or protection, raise them with the surveyors, who can deal with these matters in the award. Access for work that is not notifiable is a different matter and needs your agreement or a court order.
How will the builders reach the wall?
Usually from the building owner's own side, but sometimes they need to work from your land, for example to put up scaffolding, protect your property or finish the face of the wall. Where entry is necessary for works authorised by the Act, section 8 gives a right of access with 14 days' notice.
The surveyors will often set out in the award how and when access will be taken, where scaffolding or protection will go, and how your property will be secured and reinstated afterwards. If access is only wanted for work outside the Act, the builder needs your agreement or an order under the Access to Neighbouring Land Act 1992.
What hours can party wall works be done?
The Party Wall etc. Act 1996 does not set fixed working hours for building work. Access to a neighbour's property under section 8 is limited to usual working hours, except in an emergency.
In practice, a party wall award often sets the hours when notifiable work may be carried out, and it may restrict particularly noisy operations to certain times. Your local council may also impose hours through planning conditions, and its environmental health team can deal with noise that amounts to a statutory nuisance. If you are worried about hours, raise it with the surveyors before the award is made. See notices, awards and agreements explained.
Can I do anything about building noise next door?
Yes, but usually not through the Party Wall Act itself, which does not regulate noise. What you can do depends on the source of the problem.
If an award is in place, it may set working hours or conditions for noisy work, and you can ask the surveyors to deal with any breach. The building owner must also not cause unnecessary inconvenience under section 7. For noise that is excessive or at unreasonable times, contact your local council's environmental health team, which handles statutory nuisance. Talking calmly to your neighbour or their builder first often solves the problem fastest.
Who is responsible for safety and security during the works?
The building owner, along with their contractor, is responsible for carrying out the work safely and for protecting the adjoining property. Under section 7, they must not cause unnecessary inconvenience, must provide protection such as hoardings or shoring where your land or building is exposed, and must compensate you for any loss or damage.
If work exposes your property, for example by removing part of a roof or wall, the award will usually require temporary weatherproofing and security measures. Where builders enter your property, they must restore fences, doors and other items afterwards. Report any safety or security concerns to the surveyors and the builder straight away.
What protection must the building owner provide?
Where work exposes the adjoining land or building, the building owner must provide adequate protection at their own expense. Section 7(3) refers to hoardings, shoring, fans or temporary constructions, and the building owner must keep the protection in place for as long as necessary.
The award usually sets out the specific measures, which may include temporary weatherproofing, dust sheeting, propping, protection of gardens and security of exposed openings. The building owner must also make good, or compensate for, any damage that results from the work. See our guide to temporary works and shoring.
What if I doubt my neighbour can finish the work?
You can ask for security for expenses before the work starts. Under section 12, an adjoining owner may require the building owner to provide security, usually a sum of money held by a third party, to protect against the risk of work being left unfinished.
The request should be made before work begins. If the amount or the terms are disputed, the surveyors decide them. Security is most often requested for larger or riskier projects, such as basements or major structural work on a party wall. See our guide to security for expenses.
Can I use the Act to get scaffolding access for non-party-wall work?
No. The access rights in section 8 apply only to works carried out under the Party Wall etc. Act 1996. If you need scaffolding on a neighbour's land for other work, such as repointing your own wall or general repairs, the Act does not help.
Instead, ask your neighbour for permission, ideally recorded in a written licence covering duration, insurance, protection and any fee. If they refuse and the work is a basic preservation work to your property, you may be able to apply to court under the Access to Neighbouring Land Act 1992. See our guide to scaffolding licences and the Act.
What if the works change after the award?
Tell the surveyors before carrying out the changed work. An award relates to the works it describes, so if the work changes materially, a new notice or an addendum award may be needed.
Small changes within the scope of the original notice may be dealt with by the surveyors through an addendum award. A significant change, such as a new type of work to the party wall or deeper excavation, may require a fresh notice and the relevant notice period. Going ahead with work the award does not cover risks losing the protection of the Act and exposes the building owner to a claim at common law. See how long a party wall award is valid for.
Damage and compensation 9
What happens if my property is damaged by party wall work?
The building owner must compensate you. Under section 7(2), they must pay compensation to adjoining owners and occupiers for any loss or damage resulting from work carried out under the Act.
Tell the building owner and the surveyors as soon as you notice damage. The surveyors will usually inspect, compare the damage against the schedule of condition and decide what needs to be done. They may require the building owner to make good the damage or award a payment instead. If the owners cannot agree, the surveyors can settle it in an award. See who pays for damage during building work.
Who pays for damage caused during party wall work?
The building owner, the person having the work done, pays. Section 7(2) makes the building owner liable to compensate adjoining owners and occupiers for any loss or damage resulting from work under the Act.
Your claim is against the building owner, not their builder. The building owner may then seek to recover the cost from their contractor or insurer, but that is a matter between them. If the cause or amount of damage is disputed, the surveyors can decide it, and they may order repairs or a payment instead. A clear schedule of condition made before the work helps to settle such questions fairly.
Can I claim for damage after the works finish?
Yes. The building owner's duty under section 7(2) to compensate for loss or damage resulting from the work does not end when the builders leave. Some damage, such as cracking caused by settlement, may only appear later.
Report any damage as soon as you notice it, with dated photographs, and contact the surveyors who dealt with the work. They can usually inspect, compare the damage with the schedule of condition and make an award on what should be done. The longer you wait, the harder it may be to show the work caused the damage, and legal time limits may apply to court claims. See evidence needed to prove damage.
What if my neighbour won't pay for damage?
Refer the matter to the surveyors. If you and the building owner disagree about damage, the surveyors can decide what is owed and set it out in an award, which is conclusive and binding on both owners under section 10 unless appealed.
If the building owner still refuses to pay what the award requires, you can take court action to enforce it, ideally with advice from a solicitor. Security for expenses held under section 12, if you requested it before work began, may also help. Keep copies of the award, schedule of condition, photographs and correspondence. See what happens if a neighbour ignores an award.
Can the surveyors award money instead of repairs?
Yes. The surveyors may award a payment to the adjoining owner instead of requiring the building owner to carry out repairs. This is often called a payment in lieu of making good.
It can suit both sides: the adjoining owner can arrange repairs with their own tradespeople at a convenient time, and the building owner avoids returning to the property. The surveyors decide a fair amount, usually based on the reasonable cost of the repairs. The decision forms part of an award, which can be appealed to the county court within 14 days under section 10(17). See who pays for damage.
What if the damage was caused by work not covered by the Act?
The surveyors cannot deal with it. Their powers under the Party Wall etc. Act 1996 are limited to works that fall within the Act, so damage from other work, such as general building activity on the neighbour's own land, is outside their jurisdiction.
You can still seek compensation from your neighbour, but it would be a civil claim at common law, for example in negligence, nuisance or trespass. Start by raising the damage in writing with photographs and asking your neighbour to notify their insurer. If you cannot agree, take advice from a solicitor. A record of your property's condition before the work will help, whichever route applies.
What evidence do I need to prove damage?
The most useful evidence is a schedule of condition made before the work started, so the surveyors can compare your property before and after. Without one, it is much harder to show that damage is new.
Helpful evidence includes:
- dated photographs and videos of the damage, taken as soon as you notice it
- a record of when you first saw it and what work was happening at the time
- copies of the notice, award and all correspondence with the building owner and surveyors
Report damage promptly. See what evidence is needed to prove damage.
My neighbour says my building work cracked their ceiling. What now?
Take it seriously and involve the surveyors. Ask your neighbour for photographs and, if surveyors were appointed, tell them so they can inspect and compare the ceiling with the schedule of condition.
If the work was under the Act and caused the damage, you must compensate your neighbour under section 7(2), either by making good or through a payment the surveyors decide. If the crack was already recorded, or was caused by something else, the surveyors can decide that too. Tell your builder and insurer, and avoid admitting liability before the facts are known. See what to do if your neighbour claims your work cracked their ceiling.
What if the wall was already in poor repair?
The building owner is only responsible for damage their work causes, not for defects that existed beforehand. A schedule of condition is the best way to show what was already there.
Where work to a party wall is needed because of a defect or want of repair for which both owners are responsible, the cost may be shared under section 11, in proportion to the use each owner makes of the structure and their responsibility for the defect. If the owners disagree, the surveyors decide. Discovering serious defects during the work, such as rot or subsidence, should be reported to the surveyors straight away. See dry rot or subsidence discovered during works.
Work started without notice 8
What happens if I don't serve a party wall notice?
You lose the protection and rights the Act gives you, and your neighbour can take civil action against you. Failing to serve notice is not a criminal offence, but it is a civil matter that can be costly.
Your neighbour may apply to court for an injunction to stop the work and may claim damages for trespass or nuisance. Following Power & Kyson v Shah [2023], surveyors have no jurisdiction under the Act over work done before notice was served, so the usual surveyor process may not be available for that work. Unresolved issues can also cause problems when you sell. See common party wall mistakes.
My neighbour has started work without serving notice. What can I do?
Act quickly and put your concerns in writing. Ask your neighbour to stop the notifiable work and serve the correct notice so that the remaining work comes under the Party Wall etc. Act 1996.
Take dated photographs of your property and the work. If notice is then served, you can appoint a surveyor and the remaining work can be dealt with through an award. For work already carried out before notice, your remedies are at common law, such as an injunction or damages for trespass or nuisance, so take advice from a solicitor if the work is causing damage or your neighbour refuses to engage. See neighbour building without a party wall agreement.
What if the work is already finished and no notice was served?
The Party Wall Act process usually cannot help with finished work. Following Power & Kyson v Shah [2023], surveyors have no jurisdiction under the Act over works carried out before a notice was served, so they cannot make an award about them.
If the work damaged your property, your remedies are at common law, for example a claim for damages in trespass, nuisance or negligence. Gather evidence such as photographs and any earlier records of your property's condition, and write to your neighbour setting out the problem. If you cannot reach agreement, take advice from a solicitor. See neighbour building without a party wall agreement.
Should I stop work if I didn't serve notice first?
Usually yes. If you realise you have started notifiable work without serving notice, it is sensible to pause that work and serve the correct notice for what remains.
Serving notice now can bring the future works within the Act, giving you the right to proceed through consent or an award and reducing the risk of an injunction. It will not cover work already done: following Power & Kyson v Shah [2023], surveyors have no jurisdiction over works carried out before notice, so any claim about that work would be at common law. Speak to your neighbour openly and consider taking advice from a party wall surveyor. See when you need a party wall surveyor.
Can a surveyor sort it out after work started without notice?
Only partly. A surveyor can help bring the remaining work within the Act, but cannot deal with work that was done before notice was served.
Following Power & Kyson v Shah [2023], surveyors have no jurisdiction under the Act over works carried out before notice. If the building owner serves notice for the work still to come, the usual process applies to that work, including an award and a schedule of condition. Any dispute about damage from the earlier work must be resolved by agreement or at common law, for example through a claim in trespass or nuisance. See our guide to the retrospective party wall procedure.
What did Power & Kyson v Shah change?
It confirmed that party wall surveyors have no jurisdiction under the Act to deal with works carried out before a notice was served. Before this decision in 2023, some surveyors made so-called retrospective awards covering damage from work done without notice.
After Power & Kyson v Shah [2023], an adjoining owner whose property is affected by work carried out without notice must usually pursue remedies at common law, such as an injunction or damages for trespass or nuisance. Serving notice for any remaining works can still bring those future works within the Act. The case makes it even more important to serve notice before starting work. See the retrospective party wall procedure.
Can I get an injunction to stop the work?
Possibly. If your neighbour starts notifiable work without serving notice, or carries out work outside what an award allows, you may apply to court for an injunction. This is a common law remedy, and the court has discretion over whether to grant it.
Injunctions can be expensive and need clear evidence, so take advice from a solicitor first. Often a firm letter asking your neighbour to stop and serve notice is enough to bring the work within the Act. Where notice has been properly served and an award made, the award is binding, and you would need to appeal it rather than seek to stop authorised work. See neighbour building without a party wall agreement.
Is it a criminal offence not to serve a party wall notice?
No. Failing to serve a party wall notice is not a criminal offence. It is a civil matter, and the council does not enforce the Party Wall etc. Act 1996.
The consequences are still serious. Your neighbour may seek an injunction to stop the work and claim damages at common law, and you lose the rights and protection the Act would have given you. The only criminal offence in the Act relates to access: under section 16, an occupier who knowingly refuses entry to someone entitled to enter under section 8, without reasonable excuse, may be fined. See building without a party wall agreement.
Flats, leaseholders and landlords 8
Does the Party Wall Act apply to flats?
Yes. The Act applies to flats as well as houses. Floors and walls separating flats with separate entrances are party structures under section 20, so work such as cutting into a floor or wall between flats can be notifiable.
The same three triggers apply: work to an existing party wall or party structure, a new wall on the boundary, and excavation near a neighbour's building. In a block of flats there may be several owners to serve, including the freeholder and each long leaseholder affected. Check your lease too, as it may require the landlord's consent for alterations. See leaseholders and freeholders.
Who is the owner when flats are leasehold?
Usually both the freeholder and the leaseholders. The Act's definition of owner in section 20 is wider than freehold ownership. It includes anyone in possession other than as a mortgagee or as a tenant from year to year or for a shorter term, and a purchaser under a contract.
In practice, a leaseholder with a lease of more than a year counts as an owner, alongside the freeholder. Tenants with shorter tenancies, such as most private renters, do not. This means several notices may be needed for the same property. See how the Act applies to leaseholders and freeholders.
Do I need to serve the freeholder as well as leaseholders?
Usually yes. Both the freeholder and each long leaseholder whose property is affected count as owners under section 20, so each should normally be served with notice.
For example, if you are cutting into a party wall with a building split into flats, you may need to serve the freeholder and every leaseholder whose flat adjoins the work. Each owner can respond separately, and each may appoint their own surveyor or agree to an agreed surveyor. Check HM Land Registry for the freehold and leasehold titles to identify everyone. See neighbouring property split into flats.
Does the floor between flats count as a party structure?
Yes. Under section 20, a party structure includes a floor partition or other structure separating buildings or parts of buildings approached by separate staircases or separate entrances. A floor between two flats with their own entrances is a typical example.
That means work to the floor, such as cutting in new joists or beams, can be notifiable under section 2 and need a party structure notice at least two months before work starts. Simple works such as replacing floor coverings would not usually be notifiable. See what is a party structure.
Can a freeholder dig below a ground-floor flat?
Possibly, but the Act and the lease both need to be considered. Work that affects the floor or structure separating the flat from space below may be work to a party structure, and digging near the building may fall under the excavation rules in section 6.
A ground-floor leaseholder with a lease of more than a year is usually an owner under the Act and should be served with any required notice. Separately, the lease decides what land and rights the freeholder kept, and whether the work is allowed at all; the Party Wall Act does not grant rights the lease does not give. Take advice from a solicitor on the lease. See leaseholders and freeholders.
What about properties split into several flats next door?
You will usually need to serve several notices. Where the neighbouring building is divided into flats, the freeholder and each leaseholder with a lease of more than a year whose flat is affected count as owners under section 20.
For example, raising or cutting into a party wall with a converted house may affect the ground-floor, upper-floor and top-floor flats as well as the freeholder. Each owner can respond in their own way, so you may end up with a mix of consents and surveyors. Check the title registers to identify everyone and allow extra time. See neighbouring property split into flats.
Do tenants need to be served notice?
Usually not for the party wall notice itself. Tenants from year to year or for a shorter term, which covers most private renters, are not owners under section 20, so notice goes to the landlord. A tenant with a lease of more than a year is usually an owner and should be served.
Occupiers still matter. If you need access to the neighbouring property, section 8 requires 14 days' notice to the owner and the occupier. Occupiers can also claim compensation for loss or damage under section 7. Telling tenants about the work early, as a courtesy, often avoids problems. See leaseholders and freeholders.
Does a council or housing association neighbour need notice?
Yes. Buildings owned by councils, housing associations and other public bodies are covered by the Party Wall etc. Act 1996 in the same way as privately owned property, so the owner must be served with any required notice.
Serve the notice on the organisation that owns the property, ideally to its address for legal notices or estates department, and keep proof of service. The tenants living there are usually not owners if their tenancy is periodic or short, but they are occupiers, so they should receive notice of any access under section 8. Public bodies may take longer to reply, so allow time. See notices, awards and agreements explained.
Buying and selling 8
Do I need a party wall agreement to sell my house?
No. You do not need a party wall agreement or award to sell your house. But if you have carried out work covered by the Act, your buyer's solicitor will usually ask about it.
The TA6 property information form asks whether any notices have been served or received and about any disputes. Have copies of notices, written consents, awards and schedules of condition ready to show the work was dealt with properly. If notifiable work was done without notice, be honest about it and take advice from your solicitor, as it may raise questions for the buyer. See notices, awards and agreements explained.
Does a party wall award transfer to the new owner?
Generally yes, in effect. The rights and obligations under the Act tend to run with the properties and their owners, so a new owner can step into the process. But because awards are not registered against the title, the transfer should be handled carefully.
If a property changes hands during the works, the seller, buyer and surveyors should agree in writing who takes on the building owner's or adjoining owner's position, including responsibility for costs, damage and any security held. Your solicitor should deal with this as part of the sale. See how long a party wall award is valid for.
What should a buyer check about party wall works?
Ask the seller, through your solicitor, whether any party wall work has been done to the property or next door, and for copies of the paperwork. Party wall awards are not registered and do not appear on local searches, so the seller's answers on the TA6 form are the main source.
Useful checks include:
- notices, written consents and any awards for work such as loft conversions or extensions
- whether the work was completed and any damage settled
- any ongoing works, disputes or notices received from neighbours
If notifiable work was done without notice, ask your solicitor how that affects you. See notices, awards and agreements explained.
What must a seller disclose about party wall matters?
You should answer the TA6 property information form fully and accurately, including whether any party wall notices have been served or received and whether there are any disputes with neighbours.
Provide copies of relevant notices, consents, awards and schedules of condition. Mention any ongoing works, unresolved damage claims or work you carried out without serving notice. Giving incorrect or incomplete answers could expose you to a claim from the buyer later, so if you are unsure how to answer, ask your solicitor. Being open early usually makes the sale smoother than having issues emerge during enquiries. See common party wall mistakes.
Does a party wall award show up on searches?
No. A party wall award is not registered against the title at HM Land Registry and does not appear on local authority searches. The council does not keep records of party wall notices or awards.
Buyers usually find out about party wall matters through the seller's answers on the TA6 property information form and the documents the seller provides. If you are buying, ask your solicitor to request copies of any notices, consents and awards for past or current works. If you are selling, keep these documents safe so you can supply them. See notices, awards and agreements explained.
What if works were done without an award?
It depends on whether an award was actually needed. If the neighbour gave written consent, no award was required, and the consent letter is the key document. If the work was not notifiable, no paperwork under the Act was needed at all.
If notifiable work was done without notice, the Act cannot now be used to deal with it: following Power & Kyson v Shah [2023], surveyors have no jurisdiction over work done before notice. Any claim by a neighbour would be at common law. A buyer should ask their solicitor how much risk this carries, and a seller should disclose it honestly on the TA6 form. See building without a party wall agreement.
Am I still liable after I sell?
Possibly. The Act places duties on owners, such as compensating for damage under section 7, and whether those pass to a buyer or stay with you depends on the circumstances and what is agreed on the sale.
If you sell while works are under way, or while a damage claim or costs remain unsettled, agree in writing with the buyer, your neighbour and the surveyors who will be responsible from completion. Your solicitor can deal with this in the sale contract. Without a clear agreement, you may still face a claim for things that happened while you owned the property. See who pays for damage during building work.
What if I'm buying from the building owner during works?
Take legal advice before exchanging. If party wall works are in progress, you need to know who will finish them, who pays the remaining costs and surveyors' fees, and who deals with any damage claims from the neighbour.
Ask for copies of the notices, award and schedule of condition, and find out whether any security for expenses is held. Rights and obligations under the Act can pass to a new owner, but it is best to agree in writing between seller, buyer and the surveyors who takes over the building owner's role. Your solicitor can build this into the contract. See how long a party wall award is valid for.
Law, planning and other rules 12
Is a party wall agreement the same as planning permission?
No. They are entirely separate. Planning permission is granted by your local council and deals with whether a development is acceptable in planning terms, such as its size and appearance. The party wall process is a private, civil procedure between neighbours under the Party Wall etc. Act 1996.
Getting planning permission does not remove the need to serve party wall notice, and a party wall award does not grant planning permission. Building Regulations approval is a third, separate requirement covering how work is built. You may need all three for the same project. See party wall vs planning vs Building Regulations.
Do I still need a notice if I have planning permission and Building Regulations approval?
Yes. Planning permission and Building Regulations approval do not remove the need to serve notice under the Party Wall etc. Act 1996. If your work falls under section 1, 2 or 6, you must still serve the correct notice and follow the process.
Each system deals with something different: planning covers whether the development is acceptable, Building Regulations cover construction standards and safety, and the Party Wall Act protects neighbouring owners when work affects shared structures or nearby foundations. You can serve a party wall notice before planning permission is granted, but remember a notice lapses if work does not start within 12 months. See party wall vs planning vs Building Regulations.
Why didn't the council tell me about the Party Wall Act?
Because the council does not administer or enforce the Party Wall etc. Act 1996. The party wall process is a civil matter between neighbouring owners, so it is your responsibility to work out whether the Act applies and to serve notice if it does.
A planning or Building Regulations approval only covers those systems. Some councils mention the Act in their guidance, but they are not required to check whether you have complied, and an approval from them does not mean you have. If you are unsure whether your project needs a notice, a party wall surveyor can advise. See party wall vs planning vs Building Regulations.
Does the Party Wall Act override my other legal rights?
Only in part. The Act gives building owners specific rights, such as to carry out work to a party wall or enter neighbouring land for that work, which they would not otherwise have. In return, it gives adjoining owners protections, including notice, surveyors and compensation.
It does not take away other rights. Section 9 states that the Act does not authorise interference with an easement of light or other easements relating to a party wall. It also does not decide boundaries or override planning, Building Regulations, restrictive covenants or lease terms. For work outside the Act, the normal law applies. See our Party Wall Act 1996 guide.
Does the Act cover rights to light?
No. Section 9 of the Party Wall etc. Act 1996 makes clear that nothing in the Act authorises interference with an easement of light. A party wall award cannot give a building owner permission to block a neighbour's right to light.
Raising a party wall, for example, may be allowed under the Act, but if it interferes with an established right to light, the neighbour may still have a claim at common law. Rights to light are a specialist area, so if you are concerned, take advice from a solicitor or a rights of light specialist. Planning decisions on daylight are a separate matter again.
Do I need a solicitor?
Usually not. Most party wall matters are handled by the owners themselves and party wall surveyors, without a solicitor. Notices can be served by the building owner, and disputes under the Act are resolved by surveyors through an award.
A solicitor may be useful if you are appealing an award to the county court, seeking an injunction, dealing with work done without notice, buying or selling a property with party wall issues, or facing a boundary or lease question the surveyors cannot decide. If in doubt, ask a party wall surveyor first, as they can tell you whether a legal issue goes beyond their role. See when you need a party wall surveyor.
Does the Party Wall Act apply to listed buildings?
Yes. The Party Wall etc. Act 1996 applies to listed buildings in the same way as to any other building. If your work falls under section 1, 2 or 6, you must serve notice, whether your property, your neighbour's, or both are listed.
Listed building consent is a separate requirement. You may need it from the council for work affecting a listed building, and a party wall award does not grant it. Surveyors may also need to consider historic materials and more careful methods of work when making an award. See building near listed buildings.
Does the Act apply to commercial property?
Yes. The Party Wall etc. Act 1996 does not distinguish between homes and other buildings. It applies to offices, shops, warehouses and mixed-use buildings in England and Wales as well as to houses and flats.
The same rules apply: notice under section 1, 2 or 6, consent or a dispute, and surveyors making an award. Commercial projects often involve more owners and occupiers, such as freeholders and business tenants with long leases, and may involve larger excavations, so identifying everyone who needs to be served is especially important. See Party Wall Act requirements for commercial developments.
Does the Act apply to Crown or public property?
Yes. Crown property is covered by the Party Wall etc. Act 1996, with some special rules set out in section 19. Buildings owned by public bodies such as councils, NHS bodies and housing associations are also covered.
If you plan notifiable work next to Crown or public property, serve notice on the body that owns or manages it in the usual way and allow time for a response. Because the special rules for Crown land can be technical, it is sensible to take advice from a party wall surveyor if your neighbour is a government department or other Crown body. See our Party Wall Act 1996 guide.
What does the Party Wall Act not cover?
The Act covers only three types of work: new walls on the boundary, work to existing party walls and structures, and excavation near neighbouring buildings. It does not cover:
- minor works such as shelves, sockets, replastering or decorating
- boundary disputes, rights to light, planning or Building Regulations
- general noise and disturbance, beyond terms set in an award
- works carried out before notice was served
- access for non-notifiable work, such as general repairs from a neighbour's land
Surveyors cannot deal with matters outside the Act. See our Party Wall Act 1996 guide.
Can I deal with overhanging trees or hedges under the Act?
No. The Party Wall etc. Act 1996 does not deal with trees or hedges. Surveyors appointed under the Act cannot make an award about overhanging branches, roots or hedge height.
These are matters of general law between neighbours. Before cutting anything back, check with your council whether the tree is protected by a tree preservation order or sits in a conservation area, and speak to your neighbour. If tree roots are relevant to excavation or foundations covered by the Act, the surveyors may consider them as part of the notifiable work, but the tree dispute itself remains outside the Act. For persistent problems, take advice from a solicitor.
What is the Access to Neighbouring Land Act?
The Access to Neighbouring Land Act 1992 lets you apply to court for an order giving access to a neighbour's land when you need it to carry out basic preservation works to your own property and the neighbour will not agree.
It is different from the Party Wall Act. The access rights in section 8 of the Party Wall etc. Act 1996 apply only to work under that Act, with 14 days' notice. For other work, such as repairing or repointing your own wall, you need your neighbour's permission or, failing that, a court order under the 1992 Act. Court applications take time and cost money, so try to agree access first. See scaffolding licences and the Act.
Wales, Scotland and Northern Ireland 4
Does the Party Wall Act apply in Wales?
Yes. The Party Wall etc. Act 1996 applies across both England and Wales, and has done since it came into force on 1 July 1997. The same notice periods, surveyor procedures and rights apply in Wales as in England.
Notices, awards and appeals work in the same way, with appeals against an award going to the county court within 14 days of service. Planning and Building Regulations are handled separately by Welsh councils and may differ in some details from England, but these do not change the party wall process. See our Party Wall Act 1996 guide or the full Act.
Does the Party Wall Act apply in Scotland?
No. The Party Wall etc. Act 1996 applies only in England and Wales, and there is no equivalent Act in Scotland. Matters between neighbours there are governed by common law and, for tenement buildings such as flats, by the Tenements (Scotland) Act 2004.
The notice periods, surveyor process and awards described on this site do not apply in Scotland. If you are planning work that affects a shared wall or neighbouring building in Scotland, take advice from a Scottish solicitor or surveyor familiar with local law before you start.
Does the Party Wall Act apply in Northern Ireland?
No. The Party Wall etc. Act 1996 applies only in England and Wales, and Northern Ireland has no equivalent Act. The notice, surveyor and award process described on this site does not apply there.
Disputes about shared walls and neighbouring work in Northern Ireland are dealt with under the general law. If you are planning work that affects a neighbour's property, or you are worried about work next door, take advice from a solicitor or surveyor in Northern Ireland who is familiar with local law.
Where can I get more help with a party wall matter?
Start with the official guidance. GOV.UK publishes a party walls guide and an explanatory booklet that explains the Party Wall etc. Act 1996 and includes example notices.
For advice on your situation, speak to a party wall surveyor. Many belong to the RICS, the Faculty of Party Wall Surveyors or the Pyramus & Thisbe Society, but check their experience and insurance. A solicitor is helpful for legal disputes, appeals, injunctions or property sales. Talking to your neighbour early often prevents problems. Use our surveyor finder to look for local help.
No questions match that search. Try one word, such as "notice", "fees" or "loft".
Need a party wall surveyor? Search 1,920 listed surveyors across England and Wales by postcode.
Find a surveyorThis page is general information about the Party Wall etc. Act 1996 (England and Wales), last reviewed 1 November 2026. It is not legal advice. Every property and dispute is different, so take advice from a party wall surveyor or a solicitor before you act. Primary sources: the Party Wall etc. Act 1996 and the GOV.UK guide Party walls and building work.
Download the Party Wall etc. Act 1996 free
Get the full, up-to-date text of the Act as a PDF from the official legislation.gov.uk record, with our plain-English guide to every section, sent straight to your inbox.
We use your email to send the Act. See our privacy notice.
Contact us
Send us a message and we'll reply by email.
Thanks, your message has been sent. We'll reply by email.