PartyWallAgreement.org.uk

When Do You Need a Party Wall Surveyor?

You need a party wall surveyor when you plan work covered by the Party Wall etc. Act and your neighbour dissents or does not reply to your notice. Before that point, you may not need one. The trigger is the type of work, not its size.

Local Surveyor Match
1,920 listings across England and Wales, nearest first.

The three triggers

Check whether your job falls into one of these groups. If it does, you must serve notice.

  • Building a new wall on the line of junction
  • Work to an existing party wall or party structure, such as cutting in a beam, raising, underpinning or damp proofing
  • Excavation within 3 or 6 metres of a neighbouring building, deeper than their foundations

When you do not need one

If the neighbour consents in writing to the notice, no surveyor may be needed for that notice. Small internal jobs that do not touch the shared wall, and cosmetic work, generally sit outside the Act. If in doubt, ask.

When you do

If the neighbour dissents, or does not answer within 14 days, a dispute is treated as having arisen and surveyors must be appointed. The building owner then needs one, and the adjoining owner needs one, or both can share one.

Timing

Start early. Work to an existing wall needs at least 2 months' notice. New walls and excavation need at least 1 month. Appointing surveyors and agreeing an award takes further time, so do not book builders for the day after notice.

Other permissions

Planning permission and building regulations are separate. Permitted development does not remove the need for party wall notices.

If you are the neighbour

Receiving a notice does not mean you need to hire someone straight away. Read it, check it describes the work clearly, and reply in writing within 14 days. You can consent, or dissent and ask for surveyors to be appointed. The building owner normally pays the reasonable fees where the work is for their benefit.

Frequently asked questions

Does a loft conversion need one?

Often, if it involves cutting into or altering the party wall, such as inserting steel beams. It depends on the work.

Can my builder tell me if I need one?

They may know the rules, but they cannot act as the surveyor for you. A surveyor can confirm.

Do I need one for a fence?

Ordinary timber fences are not covered. Brick garden walls on the boundary might be.

What if I am unsure whether my work needs a notice?

Ask a party wall surveyor before you start. It is cheaper to check than to deal with a dispute after work has begun.

Source: Party Wall etc. Act 1996 on legislation.gov.uk

Related guides

Last updated: . This page is general information about the Party Wall etc. Act 1996 (England and Wales). It is not legal advice. Every property and dispute is different, so take advice from a party wall surveyor or a solicitor before you act.

A quick self-test

Answer these three questions about your project:

  1. Will any work cut into, raise, underpin, repair or demolish a wall or floor you share with a neighbour? If yes, you need a section 3 notice.
  2. Will you build a new wall on, or astride, the boundary line? If yes, you need a section 1 notice.
  3. Will you dig foundations within 3 metres of a neighbour's building and deeper than its foundations, or within 6 metres and below a 45-degree line drawn down from them? If yes, you need a section 6 notice.

If all three answers are no, the Act probably does not apply. If any is yes, you need to serve notice. You only need a surveyor if your neighbour does not consent in writing within 14 days (or you would simply prefer professional help to serve the notice).

Typical projects and whether a surveyor is likely

ProjectNotice?Surveyor likely?
Loft conversion in a terrace or semiYes, section 3Often: steels into the party wall are the classic dispute trigger
Single-storey rear extensionOften, section 6 and sometimes section 1Depends on how close and deep the footings are
BasementYes, section 6 and usually section 3Almost always
Chimney breast removalYes, section 3Often
Fitting kitchen units or shelves to a party wallNo: minor works such as plugging and screwing are not coveredNo
Replastering or rewiring sockets in a party wallUsually noNo
Garden room well away from the boundaryNoNo

If you are the neighbour

You never have to pay for your own surveyor when the work is for your neighbour's benefit: the building owner normally pays your surveyor's reasonable fees. You can choose any surveyor who is not a party to the work, or agree to the building owner's surveyor acting for both of you. If you do nothing for 14 days after a section 3 or section 6 notice, a dispute is deemed to have arisen, and if you then ignore a further 10-day request to appoint, the building owner can appoint a surveyor on your behalf under section 10(4).

Choosing well

Use our notice checker to confirm which sections apply, then compare local surveyors in our directory. Our guide on how to choose a party wall surveyor lists the questions to ask.

Download the Party Wall etc. Act 1996 free

Get the full, up-to-date text of the Act as a PDF from the official legislation.gov.uk record, with our plain-English guide to every section, sent straight to your inbox.

We use your email to send the Act. See our privacy notice.

Contact us

Send us a message and we'll reply by email.

We only use your details to reply to you. A quick human check runs when you send.