A developer building next to your house has the same duties under the Party Wall etc. Act 1996 as any homeowner: it must serve notice before work to a shared wall, before building on the boundary, and before excavating within 3 or 6 metres of your home to the depths the Act sets. You can appoint your own surveyor, normally at the developer's cost, and ask for security for expenses, while planning, noise and boundary issues are dealt with under other rules.

Need a surveyor fast?
1,920 listings across England and Wales, nearest first.

Notices a developer may have to serve on you

Developer's workNoticeMinimum period
Building a new wall on or up to the boundarySection 1 line of junction notice1 month
Building against, cutting into, raising or underpinning a shared wall, or demolishing a building attached to yoursSection 3 party structure notice2 months
Foundations, basements, piling or drainage trenches within 3 m and deeper than your foundations, or within 6 m and cutting a 45-degree line down from your foundationsSection 6 notice with plans and sections1 month

A company is a "building owner" just like an individual. If the site is let or held by several companies, any of them with an interest may serve. The notice should name the owner and describe the work, and a Section 6 notice must include plans and sections showing the depth of excavation. Our guide to the 3 and 6 metre rules shows how distances are measured. Note that a Section 6 notice can reach owners further away than the house next door, if their building is within the distances.

Why your own surveyor matters more on a development

On a single house extension an agreed surveyor is often fine. On a development, especially with demolition, basements or piling, we suggest appointing your own surveyor:

  • the developer's surveyor may work for it on many sites;
  • engineering details (temporary works, retaining walls, monitoring) need checking for your house specifically;
  • bigger programmes mean more stages, more inspections and more scope for damage.

Under section 10(13), the surveyors decide who pays the reasonable costs of the award, and the developer will normally pay where the work is for its benefit. See the adjoining owner's surveyor.

What your surveyor can ask for

  • A schedule of condition of your home before work starts.
  • Engineering information: foundation and temporary works design, sequence of excavation, and the measures to protect your foundations. Under section 6(3), the developer must underpin or strengthen your foundations where necessary if you require it, at its own expense.
  • Monitoring of movement or vibration during excavation or piling, with trigger levels and what happens if they are reached. Whether monitoring is required depends on the risk; the surveyors decide it in the award.
  • Protection: hoarding, shoring or temporary weatherproofing where your property is laid open (section 7(3)).
  • Working arrangements: access, working hours for especially noisy operations, and how damage is reported.
  • Security for expenses under section 12. The GOV.UK booklet says this is usually reserved for intrusive or complex works, which is where many developments sit. See security for expenses.

After a Section 6 job is finished, you can ask for particulars, including plans and sections, of the work actually done (section 6(9)).

Checklist when the developer's notice arrives

  1. Note the service date. You have 14 days to consent. Silence on a Section 3 or 6 notice counts as dissent, but replying and choosing your surveyor keeps control with you.
  2. Check every notice. Developments often send several at once: a Section 6 notice for the main foundations, another for a basement or lift pit, and a party structure notice for work to a shared wall. Each needs a reply.
  3. Check the plans. A Section 6 notice without plans and sections showing depth is incomplete; ask for them.
  4. Look up the planning file. The council's planning website often has the construction management plan, the basement impact assessment (where required locally) and the approved drawings. Your surveyor will find these useful.
  5. Write down your concerns. Cracks you already have, rooms you work from, a fragile extension, garden access, pets, a vulnerable person at home. Give the list to your surveyor before the award is drafted.
  6. Check who you are dealing with. Note the company name on the notice and the contractor's name on site. You will need both if anything goes wrong.

The Act's text on excavation is on legislation.gov.uk (section 6).

Things the Party Wall Act does not cover

ConcernWhere it is dealt with
Whether the scheme can be built, its height, overlookingPlanning: comment on the application to the council
Construction noise, dust, hours on siteThe council's environmental health team, planning conditions, any construction management plan
Right to lightCommon law and the Rights of Light Act 1959; section 9 of the Party Wall Act preserves easements
Where the boundary isDeeds, HM Land Registry, or a boundary agreement
Scaffolding or cranes over your landLicences negotiated with you; see scaffolding licences and crane oversail
Demolition safetyBuilding control demolition notices under the Building Act 1984

If work starts without a notice

  1. Photograph and date everything: the site, your walls inside and out, any cracks.
  2. Write to the developer and its contractor, quoting the Act, asking for the notices that should have been served and for notifiable work to stop until they are.
  3. Take advice quickly from a surveyor or solicitor. You cannot start the Act's process yourself if no notice was served (Power & Kyson v Shah [2023] EWCA Civ 239); your remedy is the courts, including an injunction.

Our guide on a neighbour building without a party wall agreement covers the steps in more detail.

If damage happens

Report it in writing to your surveyor and the developer at once. The building owner must compensate for loss or damage caused by work under the Act (section 7(2)), and section 11(8) lets you ask for the cost of making good to be paid to you instead of the developer's builder doing the repair. See how to claim for party wall damage.

Frequently asked questions

Can I stop a developer building next to me?

Not through the Party Wall Act; it controls how notifiable work is done, not whether it happens. Objections to the scheme belong in the planning process.

Do I have to accept the developer's surveyor?

No. You can agree to them as the agreed surveyor or appoint your own. On larger or deeper work, your own is usually the safer choice.

Who pays my surveyor?

The surveyors decide under section 10(13). Where the work is for the developer's benefit, it normally pays your surveyor's reasonable fees.

The developer is piling 5 metres away. Is that covered?

It can be, if your building is within 6 metres and the piles go below a line drawn down at 45 degrees from the bottom of your foundations. Ask for the plans and sections.

What if the developer's company changes during the job?

Tell your surveyor. The new owner is the building owner for work it does, and may need to serve notices of its own.

This page is general information about the Party Wall etc. Act 1996 (England and Wales). It is not legal advice. Every property and dispute is different, so take advice from a party wall surveyor or a solicitor before you act.

Download the Party Wall etc. Act 1996 free

Get the full, up-to-date text of the Act as a PDF from the official legislation.gov.uk record, with our plain-English guide to every section, sent straight to your inbox.

We use your email to send the Act. See our privacy notice.

Contact us

Send us a message and we'll reply by email.

We only use your details to reply to you. A quick human check runs when you send.