I have received a party wall notice: how to respond

If you have received a party wall notice, you have 14 days from the day it was served to reply in writing. You can consent, dissent and appoint one surveyor jointly with your neighbour, or dissent and appoint your own surveyor. You cannot use the reply to block the work, but you can make sure it is done properly and that your home is recorded and protected, usually at your neighbour's expense.

Local Surveyor Match
1,920 listings across England and Wales, nearest first.

First, work out which notice you have

The notice should say which section of the Party Wall etc. Act 1996 it is served under. That decides the notice period and, crucially, what happens if you say nothing.

Notice says What your neighbour plans Earliest start If you don't reply within 14 days
Section 1 (line of junction) A new wall on or up to the boundary 1 month after service If they asked to build astride the boundary, they must build wholly on their own land instead (s.1(4))
Section 3 (party structure) Work to the wall you share: steel beams, raising it, removing a chimney breast, underpinning 2 months after service You are treated as dissenting and a dispute exists (s.5)
Section 6 (adjacent excavation) Digging foundations near your building 1 month after service You are treated as dissenting and a dispute exists (s.6(7))

One letter may combine several notices; reply to each. A complete notice names the owner, gives an address, describes the work and, for Sections 3 and 6, a start date. A Section 6 notice must include plans and sections (s.6(6)).

Your three options side by side

Consent Dissent, one agreed surveyor Dissent, your own surveyor
What it means You agree to the work as described You agree to share one impartial surveyor who makes the award You appoint a surveyor of your choice; your neighbour has theirs
Surveyor involvement None, unless a dispute arises later One surveyor acts for both owners (s.10(1)(a)) Two surveyors, who select a third at the start (s.10(1)(b))
Schedule of condition Not automatic. Ask for one anyway Usually part of the award Usually part of the award
Award No award One award One award agreed by both surveyors
Who normally pays surveyors No surveyor fees unless you choose to pay for advice Your neighbour, usually Your neighbour, usually, for both surveyors' reasonable fees
Speed Fastest Usually quicker than two surveyors Slower; two people must agree
Best for Small, low-risk work and a neighbour you trust Most ordinary projects Complex or deep work, or where trust has broken down

Consenting does not remove your neighbour's duties to avoid unnecessary inconvenience (s.7(1)) and to compensate you for damage (s.7(2)). What you give up is an award: an agreed condition record, set working methods and an impartial person to decide on damage.

Day-by-day: from receipt to reply

  1. Day 1: note the date. The 14 days begins with the day of service. Write down when it arrived and how. Keep the envelope or email.
  2. Days 1 to 3: read it properly. Identify the section, the start date and what is planned. Look for drawings. If there are none for excavation work, you are entitled to plans and sections.
  3. Days 3 to 7: talk to your neighbour. Ask what the work involves, who the builder is, and how long it will take. The GOV.UK booklet suggests that if you object, you explain why, because the plans may be changed.
  4. Days 5 to 10: decide. Consider how close the work is to your home, how old and fragile your house is, and whether you have any cracks you'd want on record.
  5. Days 7 to 12: pick a surveyor if dissenting. If your neighbour suggested a surveyor, decide whether you are happy for them to act as agreed surveyor. If not, find your own and check they will act.
  6. By day 14: send your reply in writing. Use the acknowledgement form if one was enclosed, or a short letter. Keep a copy.
  7. Within one month (Section 3 only): counter notice. If you want extra work done for your benefit, serve a counter notice (see below).

Reply wording you can adapt

These are plain examples, not official forms. Put your name, address, the date and the address of the property doing the work at the top.

Consent:

I have received your notice dated [date] under section [1/3/6] of the Party Wall etc. Act 1996 about work at [address]. I consent to the work described. Please let me know your builder's start date and contact details, and I would like photographs of the wall taken before work begins.

Dissent with an agreed surveyor:

I have received your notice dated [date] under section [3/6] of the Party Wall etc. Act 1996. I dissent, and a dispute has therefore arisen. I agree to [surveyor's name, firm and address] acting as the agreed surveyor under section 10(1)(a).

Dissent with your own surveyor:

I have received your notice dated [date] under section [3/6] of the Party Wall etc. Act 1996. I dissent, and a dispute has therefore arisen. I appoint [surveyor's name, firm and address] as my surveyor under section 10(1)(b). Please ask your surveyor to contact them.

Section 1 notice for a wall astride the boundary: say clearly whether you consent to the wall being built across the line. If you are unhappy with other aspects of a Section 1 wall, say you dispute it; section 1(8) sends disputes to the section 10 surveyor process.

Appointments cannot be withdrawn once made (s.10(2)), so check the name first.

What silence means

For a Section 3 or Section 6 notice, saying nothing after 14 days counts as dissent. Your neighbour can then send a written request asking you to appoint a surveyor. If you still do nothing for 10 days after that request, they can appoint a surveyor on your behalf (s.10(4)). That surveyor must act impartially, but you have had no say in who it is.

For a Section 1 notice, silence simply means no consent to a wall astride the line. Your neighbour can still build wholly on their own land after one month, at their own cost.

In short: ignoring a notice never stops the work. It just removes your choice.

Counter notice

For a Section 3 notice you can serve a counter notice within one month of service (s.4(1)). It asks your neighbour to include extra work for your benefit, for example chimney breasts, flues, piers or recesses you reasonably need, or deeper or stronger special foundations if you plan to build on them later. You pay for the extra work you ask for (s.11(9)). Your neighbour must comply unless it would be injurious to them or cause unnecessary inconvenience or delay (s.4(3)). If they don't consent to your counter notice within 14 days, a dispute is deemed to have arisen (s.5).

Agreed surveyor or your own?

An agreed surveyor is often the person your neighbour has already instructed. That is allowed. Every surveyor appointed under the Act must act impartially, not as an advocate for whoever pays. The booklet notes that with only one agreed surveyor there is no third surveyor to turn to.

Choose your own surveyor if:

  • the work is deep excavation, a basement or underpinning;
  • your house has known weaknesses, such as old movement cracks or a fragile chimney;
  • you don't trust the suggested surveyor, or they won't answer your questions;
  • relations with your neighbour are already strained.

Before agreeing to anyone, see how to choose a party wall surveyor and questions to ask a party wall surveyor before hiring them. The trade-offs are covered in more depth in agreed surveyor vs two surveyors: the legal differences.

Who pays

The surveyors decide who pays the reasonable costs of the award (s.10(13)). Where the work is solely for your neighbour's benefit, the booklet says they usually pay, including your own surveyor's reasonable fees. You may share costs where work is needed because of defects or lack of repair in the shared wall (s.11(4)-(5)).

For a sense of scale, published consumer guides put an agreed surveyor at roughly £900 to £1,800 for a whole job, and two surveyors at roughly £1,800 to £3,500 in total (BestBuilders, August 2026; HomeOwners Alliance gives wider ranges). These are indicative only. See who pays the party wall surveyor fees for the exceptions.

Frequently asked questions

Can I ask for more time to reply?

The 14 days is fixed by the Act. Your neighbour can informally agree to wait, but on a Section 3 or 6 notice the deemed dissent still happens after 14 days. The simple fix is to dissent within the time and name a surveyor. Dissenting is not hostile; it just starts the protective process.

Do I have to say "dissent" if I don't object to the work?

No, but on Section 3 and 6 notices dissent is the only route to an award and a schedule of condition paid for by your neighbour. Many people dissent purely to get their home recorded. Think of it as "I'd like this done formally", not "I object".

A surveyor wrote to me after seeing the planning application. Must I use them?

No. A surveyor contacting you unprompted has no special status. You choose your own surveyor, or agree to one with your neighbour. Check credentials and independence before you sign anything.

My neighbour is friendly and says it will be fine. Should I still reply?

Yes. A written reply protects you both. Good relations are a reason to choose one agreed surveyor, not to leave the notice unanswered. Builders cause damage regardless of goodwill.

Can I change my mind after consenting?

A written consent is a valid reply. If problems arise later, for example damage or work going beyond what was notified, a dispute can still arise and go to surveyors under section 10. See what happens if a neighbour signs a party wall notice but then objects.

Related guides

Last updated: 4 November 2026. This page is general information about the Party Wall etc. Act 1996 (England and Wales). It is not legal advice. Every property and dispute is different, so take advice from a party wall surveyor or a solicitor before you act.

Model replies you can adapt

Reply in writing, keep a copy, and send it to the building owner (or their surveyor if the notice asks you to). Choose one of these.

1. Consent

Re: [type] notice dated [date] for works at [address]. I/We, [names], owner(s) of [your address], consent to the works described in the notice. [Optional: We ask that a photographic record of the condition of our property is agreed before work starts.] Signed / dated.

2. Dissent and agree to one surveyor

Re: [type] notice dated [date]. I/We dissent from the works and concur in the appointment of [surveyor named in the notice] as the Agreed Surveyor under section 10(1)(a) of the Party Wall etc. Act 1996. Signed / dated.

3. Dissent and appoint your own surveyor

Re: [type] notice dated [date]. I/We dissent from the works and appoint [name, firm and address of your surveyor] as my/our surveyor under section 10(1)(b) of the Party Wall etc. Act 1996. Signed / dated.

Check with your chosen surveyor before you name them, and get their appointment confirmed in writing.

Which reply suits which situation?

SituationUsual sensible reply
Small job, good relations, house in good conditionConsent, with agreed dated photos
Loft steels or extension, you trust the building owner's surveyorAgreed surveyor
Basement, piling, a period or fragile house, or a poor relationshipAppoint your own surveyor, at the building owner's cost
You think the notice is invalid or incompleteSay so in writing promptly, and take advice

Things to check in the notice before you reply

  • Is it addressed to every owner of your property, by name?
  • Does it say which section it is under, describe the work and give a start date?
  • Is the notice period long enough: two months for section 3, one month for sections 1 and 6?
  • For a section 6(2) notice, are plans and sections attached?

Asking for extra work: the counter notice

Within one month of a section 3 notice, you can serve a counter notice under section 4 asking for additional work for your benefit, such as chimney copings, or deeper or stronger foundations if you plan to build later. You normally pay for that extra work.

Your rights during the work

  • No unnecessary inconvenience (section 7).
  • Compensation for loss or damage (section 7).
  • 14 days' notice before anyone enters your property under section 8.
  • Security for expenses, if you ask for it before work starts (section 12).

See also choosing your own surveyor as the adjoining owner.

Download the Party Wall etc. Act 1996 free

Get the full, up-to-date text of the Act as a PDF from the official legislation.gov.uk record, with our plain-English guide to every section, sent straight to your inbox.