PartyWallAgreement.org.uk

Party wall addendum award: what happens when plans change

An addendum award is a further award made by the same surveyors to deal with matters the first award did not cover, such as revised drawings, extra work, or damage arising during the job. Small changes within what was notified can usually be handled by an addendum; work of a different kind, or new work not described in the notice, normally needs a fresh notice first. Building owners usually pay the surveyors' reasonable costs of it.

Local Surveyor Match
1,920 listings across England and Wales, nearest first.

Why awards get added to

Building projects change. An engineer resizes a beam, the builder finds the party wall is weaker than expected, a basement needs a different underpinning sequence, or damage appears halfway through. Surveyors can make more than one award: section 10(10) says the agreed surveyor, or the three surveyors or any two of them, shall settle by award any matter connected with any work to which the Act relates that is in dispute. Surveyors commonly call a later award an "addendum award" or a "second award". The term is not in the Act; the power is.

Addendum or fresh notice?

ChangeUsual route
Revised structural drawings for the same notified work (e.g. a different beam size bearing in the same place)Addendum award
Change of method, sequence or temporary works for notified excavationAddendum award
Damage found during or after the workAddendum award dealing with making good or payment
Extra work of a type not in the notice (e.g. you add chimney breast removal to a loft that only notified beams)Fresh party structure notice, then an award
New excavation not in the Section 6 notice, or deeper or closer than notifiedUsually a fresh Section 6 notice with new plans and sections
Work affecting a different neighbourA notice to that neighbour

The reason is that the surveyors' jurisdiction comes from the notices. The GOV.UK booklet says an award should only cover matters relating to the notices. In Power & Kyson v Shah [2023] EWCA Civ 239 the Court of Appeal confirmed that the Act's surveyor process depends on a notice having been served for the work. So where in doubt, serve a fresh notice. See how to serve a party wall notice.

Section 7(5): build what the award says

Section 7(5) requires work to be carried out in accordance with the plans, sections and particulars agreed between the owners or determined under section 10. Deviations are allowed only if agreed or determined in the same way. So if your builder wants to change something that the award fixed, such as the method of underpinning, it is not enough to change it on site. Agree it with the neighbour in writing, or ask the surveyors for an addendum award. Building something different from the award is a breach that can lead to an injunction. See what happens if an award is ignored.

How an addendum award usually works

  1. Tell your surveyor early. Send revised drawings and calculations as soon as they exist, not when the steel is already on site.
  2. The surveyors review. They decide whether it is within the original notice or needs a fresh one, and whether a further inspection is needed.
  3. Further award drafted and agreed. It refers to the original award, records the change and any extra protection, and deals with costs.
  4. Served on both owners. The 14-day appeal right applies to the new award as it does to the first.

On a simple drawing revision this can take days. If a fresh notice is needed, its full notice period applies unless the neighbour consents in writing to an earlier start for party structure work.

Damage during the works

The most common addendum is about damage. If cracks appear, the adjoining owner reports them to their surveyor, the surveyors inspect and compare with the schedule of condition, and the award either requires making good or sets a payment instead. Section 11(8) lets the adjoining owner require payment in place of the building owner doing the repair. Our guide to evidence needed to prove party wall damage explains what helps.

Costs

The surveyors decide who pays the reasonable costs of each award under section 10(13). Where the change is the building owner's, they normally pay. Where an addendum is needed because of a matter the adjoining owner raised that turns out to be unfounded, the surveyors can allocate costs differently. Fee levels vary, and our fee research does not include a published figure for addendum awards specifically, so ask your surveyor how they charge for further awards before you appoint. Published hourly rates range widely, from about £90 to £450 (HomeOwners Alliance and Checkatrade figures). See fixed fees vs hourly rates.

Worked example: a beam that grew

Mo's party structure notice and award cover two steel beams bearing on padstones in the party wall for a loft conversion. During the build, the engineer changes the design: the beams get deeper, one padstone moves 400 mm along the wall, and a third short beam is added to trim around the stairs, also bearing on the party wall.

  • The deeper beams and moved padstone are the same kind of work as notified, in the same wall. The surveyors deal with them in an addendum award with the revised drawings.
  • The third beam is extra cutting into the party wall. Because the original notice described "two beams", the surveyors advise Mo to serve a short supplementary party structure notice. The neighbour consents in writing to an early start, so there is no two-month wait.
  • The addendum award covers both, and the builder carries on within a week.

Avoiding the need for an addendum

  • Get the structural design done before serving notice, not after the award.
  • Describe the work fully in the notice: every beam, every breast, every excavation.
  • Ask the builder to flag changes before they happen, not after.
  • For excavation, ask the engineer to allow for likely variations in the notified depth.

Frequently asked questions

Do I need a new party wall award if my plans change?

If the change is to work already notified and in the award, usually an addendum award. If you are adding a new kind of notifiable work, serve a fresh notice first.

Can the builder just make the change on site?

Not if it departs from the awarded plans. Section 7(5) requires work to follow the agreed or determined plans unless a deviation is agreed or determined.

Can I appeal an addendum award?

Yes. Any award can be appealed to the county court within 14 days of service. See how to appeal a party wall award.

Does an addendum restart the notice period?

No. If a fresh notice is needed for new work, that notice has its own period. An addendum on existing notified work does not.

My neighbour agreed the change by text. Is that enough?

It is evidence of agreement but easy to dispute later. A short signed letter, or an addendum award, is safer.

This page is general information about the Party Wall etc. Act 1996 (England and Wales). It is not legal advice. Every property and dispute is different, so take advice from a party wall surveyor or a solicitor before you act.

Download the Party Wall etc. Act 1996 free

Get the full, up-to-date text of the Act as a PDF from the official legislation.gov.uk record, with our plain-English guide to every section, sent straight to your inbox.

We use your email to send the Act. See our privacy notice.

Contact us

Send us a message and we'll reply by email.

We only use your details to reply to you. A quick human check runs when you send.