How to serve a party wall notice
To serve a party wall notice, give a written notice to every owner of the neighbouring property, either by hand, by post to their usual or last known address, or by email if they have said they will accept notices that way. It must name all building owners, describe the work and give a start date no earlier than the notice period allows. Keep proof of when and how you served it.
Step 1: work out who you must serve
A notice goes to every "adjoining owner". Under section 20 of the Act, "owner" is wider than the person on the title deeds. It includes:
- anyone receiving, or entitled to receive, rent or profits from the land (for example a freeholder whose flat is let);
- anyone in possession other than a mortgage lender or a tenant from year to year or for a shorter term (so most long leaseholders count; short-term tenants do not);
- a buyer who has exchanged contracts.
In practice that means:
| Neighbouring property | Who to serve |
|---|---|
| House owned outright | All registered owners (each joint owner) |
| House with a mortgage | The owners, not the lender |
| House let to tenants | The landlord (owner). Tenants on short lets are occupiers, not owners, but tell them too because they live there. |
| Converted house or block of flats | The freeholder and every long leaseholder whose part is affected |
| Property being sold | The current owner and, if contracts have exchanged, the buyer as well |
| Council or housing association home | The council or association as owner (and any long leaseholder) |
Check owners with a title register from HM Land Registry rather than guessing. For flats, see party wall procedures for leaseholders and freeholders. A mid-terrace house usually means serving both sides; a Section 6 excavation can catch owners further away, within the 3 m or 6 m zones.
Step 2: make sure the notice says what it must
The Act sets the contents. A party structure notice must state your name and address, the nature and particulars of the work, and the date work will begin (section 3(1)). A Section 6 notice must also say whether you propose to underpin or otherwise strengthen the neighbour's foundations, and must come with plans and sections showing the site and depth of the excavation (section 6(6)). The GOV.UK booklet recommends the notice is dated and says it is a notice under the Act.
Our free party wall notice templates include each of these items.
Step 3: choose how to deliver it
Section 15 lists the ways a notice may be served:
- By hand to the owner.
- By post to the owner's usual or last known residence or place of business in the United Kingdom.
- To a company by delivering it to its secretary or clerk at its registered or principal office, or by post there.
- By email, but only if the owner has said they are willing to receive notices electronically, has not withdrawn that, and you send it to the address they gave (section 15(1A), added by the Party Wall etc. Act 1996 (Electronic Communications) Order 2016, on legislation.gov.uk).
- Addressed to "the owner" of the premises (naming them), delivered to someone there or, if nobody is there, fixed to a conspicuous part of the premises (section 15(2)). This is the route for empty or derelict buildings and unknown owners.
In Knight v Goulandris [2018] EWCA Civ 237 the Court of Appeal held that the section 15 methods are not the only valid ones: a document is served once the recipient actually receives it in readable form. That helps when something arrives another way, but do not rely on it. Use a listed method and keep evidence. See our note on Knight v Goulandris.
Step 4: keep proof
- Keep a dated copy of exactly what you served, including drawings.
- For hand delivery, note the date, time and who received it; a photo of the envelope at the door helps.
- For post, use a certificate of posting. Recorded delivery can fail if nobody signs, so post and hand-deliver if timing is tight.
- For email, keep the owner's written agreement to email service and your sent message.
Validity checklist: common reasons notices fail
- Not every building owner named. If you own jointly, both names go on the notice.
- Not every adjoining owner served. Missing a freeholder or a co-owner is a common gap.
- Wrong section. Steel beams into the wall need a party structure notice; a Section 6 notice does not cover them.
- Vague description. "Building works" is not enough; say what will be done to the wall or how deep you will dig.
- No plans with a Section 6 notice. Plans and sections are required.
- Start date too early. It must allow the full one or two months.
- Emailed without agreement. Email service needs the owner's prior consent.
- Served too early. Section 3 and 6 notices lapse if work has not started within 12 months; see how long a notice lasts.
If you are not sure a notice is valid, serving a fresh, correct one is usually quicker than arguing about the old one.
Should a surveyor serve it for you?
You can serve your own notice. Many people do, especially for simple jobs where the neighbour is likely to consent. A surveyor will draft and serve it for a fee; published notice-only prices are around £50 to £200 per notice (BookaBuilderUK, June 2026; BestBuilders, August 2026). See serving your own notice to save money.
The GOV.UK guidance on serving notices is on the party walls and building work pages.
Frequently asked questions
Can I serve a party wall notice by email?
Yes, but only if the neighbour has told you they are willing to receive notices by email, has not withdrawn that, and you use the address they gave. Get their agreement in writing first.
Can my builder or architect serve the notice?
They can prepare and deliver it on your behalf, but it must be your notice, naming you as building owner. You remain responsible if it is wrong.
What if I do not know who owns the property next door?
Search the title at HM Land Registry. If the owner still cannot be found, address the notice to "the owner" of the premises and deliver it there or fix it to a conspicuous part, as section 15(2) allows.
Do I need separate notices for each neighbour?
Yes. Each adjoining owner gets their own notice, and each property's process runs separately.
Can one letter cover Section 3 and Section 6 work?
You can deliver them together, but the notices have different periods and contents, so most surveyors prepare them as separate notices in the same envelope.
This page is general information about the Party Wall etc. Act 1996 (England and Wales). It is not legal advice. Every property and dispute is different, so take advice from a party wall surveyor or a solicitor before you act.
Which notice for which job: a quick decision table
| Your work | Section | Minimum notice | Deemed dispute if no reply in 14 days? |
|---|---|---|---|
| New wall on the boundary line (on your land or astride it) | 1 | 1 month | No: if your neighbour does not agree to a wall astride the line, you build wholly on your own land |
| Steels into a party wall, raising it, underpinning it, cutting away a chimney breast | 2 (notice under 3) | 2 months | Yes |
| Digging within 3 metres and below next door's foundations | 6(1) | 1 month | Yes |
| Digging within 6 metres and cutting a 45-degree line down from next door's foundations | 6(2) | 1 month, with plans and sections | Yes |
Many projects need more than one notice. A typical terrace loft with a rear extension needs a section 3 notice for the loft steels and a section 6 notice for the extension foundations, served on the same neighbour. You can serve them together, but each must be a separate, complete notice.
Serving several owners
Every owner of the adjoining property needs notice. Under section 20 of the Act, "owner" includes the freeholder, anyone entitled to receive rent, a buyer under a contract of sale, and a tenant whose tenancy is longer than year to year. In practice that means:
- Joint owners: serve each by name. A notice addressed only to one spouse is a common defect.
- Flats: serve the leaseholder of each affected flat and the freeholder of the building.
- Rented houses: serve the landlord. Serve a tenant too if their lease is longer than year to year.
- Owner unknown: section 15 lets you address the notice to "the owner" of the premises, naming them, and fix it to a conspicuous part of the property.
Check the title at HM Land Registry for a few pounds before you serve: it is the quickest way to get every owner's name right.
Timing your notices around planning and builders
You can serve before planning permission is granted, and it often makes sense to do so, because the notice periods then run while you wait for a decision. But a notice lapses if the work has not started within 12 months, so do not serve so early that your start date slips past that point. Give your builder a start date that is after the notice period ends and, if your neighbour dissents, after the award is served: a builder who starts early puts you in breach of the Act.
What to send with the notice
- A short covering letter in plain English explaining the project and inviting questions.
- A drawing showing where the work touches the wall or how close the excavation is. For a section 6(2) notice, plans and sections are required.
- An acknowledgement form with the three choices: consent, dissent and appoint my own surveyor, or dissent and agree to an agreed surveyor.
- A stamped addressed envelope. Small courtesies get more consents.
Our notice generator builds the notice and the reply form for you.
New to this? Start with our building owner’s step-by-step guide.