Party wall surveyor for building owners: what you need to do

As the building owner, you must serve notice on every adjoining owner before starting work covered by the Party Wall etc. Act 1996, wait out the notice period, and, if a neighbour dissents or stays silent, appoint a surveyor and get an award before you start. You normally pay all reasonable surveyor costs.

Local Surveyor Match
1,920 listings across England and Wales, nearest first.

Your legal duties in one paragraph

The Act gives you rights to work on a party wall, build on the boundary and dig near your neighbour's foundations, but only if you follow its procedure. That means: serve the right notice on every owner, give the full notice period, appoint a surveyor if a dispute arises, follow the award, make good damage, and pay the costs the award says you must pay. You also owe your neighbour compensation for loss or damage caused by the work under section 7.

Step 1: work out whether the Act applies

There are three triggers: work to a party wall or other party structure (section 2, notice under section 3); a new wall on the boundary line (section 1); and excavation near a neighbour's building (section 6). Our notice checker takes two minutes. Your architect or engineer should mark on the drawings exactly where the work touches the party wall and how deep foundations will go.

Step 2: talk to your neighbours first

A neighbour who hears about your plans from you, not from a formal notice through the door, is far more likely to consent or accept an agreed surveyor. Show them the drawings, explain the timetable and builder, and tell them a notice is coming. This one conversation is the biggest single saving on most projects.

Step 3: serve notice

You can serve the notices yourself or ask a surveyor to do it. Each notice must name every owner (including freeholders and long leaseholders), describe the work properly, give the start date and allow the full period: two months for party structure notices, one month for line of junction and excavation notices. See how to serve a party wall notice.

Step 4: the neighbour's reply

  • Consent in writing: no surveyors needed. Agree a schedule of condition informally anyway, with dated photos.
  • Dissent and agree to your surveyor acting for both: one agreed surveyor makes the award.
  • Dissent and appoint their own surveyor: two surveyors make the award, and you pay both.
  • No reply within 14 days (section 3 or 6 notices): a dispute is deemed to arise. Send a 10-day request under section 10(4); if they still do not appoint, you can appoint a surveyor for them.

Step 5: what your surveyor does

  • Checks the notices are valid and complete.
  • Selects a third surveyor with the other surveyor, if there are two.
  • Prepares the schedule of condition of the neighbour's property.
  • Reviews your engineer's design and method of work.
  • Negotiates and signs the award, which sets out what you can do, how, when, and who pays.
  • Serves the award on both owners and deals with any damage claims during or after the work.

Remember that a party wall surveyor is not your advocate in the way a solicitor is. Every surveyor appointed under the Act must act impartially and apply the Act, whoever appointed them.

Step 6: build in line with the award

Give your builder a copy of the award and make it part of the contract. Awards commonly set working hours, protection for the neighbour's property, access arrangements and the sequence of structural work. Departing from the award can expose you to claims outside the Act's protection.

Step 7: finishing

When the work is complete, ask your surveyor to arrange the closing inspection against the schedule of condition. Deal promptly with any damage: the award usually lets you either make good or pay compensation instead.

Costs you should budget for

RouteIndicative national range (HomeOwners Alliance, March 2026)
Loft conversion, one agreed surveyor£900 to £1,200
Loft conversion, two surveyors£1,800 to £2,400
Extension, one agreed surveyor£1,200 to £1,500
Extension, two surveyors£2,400 to £3,000
Basement, one agreed surveyor£1,800 to £2,700
Basement, two surveyors£3,600 to £5,400

These are per neighbour. A terraced house with work affecting both sides needs a notice and possibly an award for each. See our full cost guide.

Timetable

Allow at least the notice period plus four to eight weeks for surveyors to agree an award where there is a dispute. Serving notices while planning permission is being decided saves time, as long as work starts within 12 months of service, when the notice would otherwise lapse.

Pitfalls that cost building owners most

  • Starting before the award is served, even by a day.
  • Missing an owner, so the award does not bind them.
  • Vague drawings, so surveyors spend hours chasing details you pay for.
  • Changing the design after the award without telling the surveyors: an addendum award may be needed.
  • No contingency for making good damage.

Frequently asked questions

Can I use my architect as my party wall surveyor?

Yes, if they are not a party to the matter and are competent in the Act. Many architects prefer to leave party wall work to specialists.

Can my builder start the non-party-wall parts before the award?

Work entirely unaffected by the notices can usually proceed, but be careful: excavation near the neighbour, and anything touching the party wall, must wait.

What if my neighbour's surveyor's fees seem too high?

You only have to pay reasonable costs. Ask for a breakdown; disputes over fees can be referred to the third surveyor. See who pays party wall surveyor fees.

This page is general information about the Party Wall etc. Act 1996 (England and Wales). It is not legal advice. Every property and dispute is different, so take advice from a party wall surveyor or a solicitor before you act.

Download the Party Wall etc. Act 1996 free

Get the full, up-to-date text of the Act as a PDF from the official legislation.gov.uk record, with our plain-English guide to every section, sent straight to your inbox.

We use your email to send the Act. See our privacy notice.

Contact us

Send us a message and we'll reply by email.