If you demolish a building or extension that shares a wall with your neighbour, or dig out its foundations, the work almost always needs a party structure notice (two months) and often a Section 6 excavation notice (one month). You must leave the party wall standing and weatherproofed for the neighbour, and the Building Act 1984 separately requires you to notify the council of most demolitions at least six weeks before.

Local Surveyor Match
1,920 listings across England and Wales, nearest first.

Which party wall rights cover demolition

Section 2 of the Act lists the rights a building owner may exercise after a party structure notice. Those most often used in demolition are:

  • 2(2)(b) demolish and rebuild a party wall that is defective or out of repair;
  • 2(2)(e) demolish and rebuild a party structure that is not strong or high enough for the new building, provided it is still sufficient for the neighbour;
  • 2(2)(g) cut away footings, chimney breasts or other projections from the wall on your land;
  • 2(2)(h) cut away parts of an adjoining building that overhang your land, as far as needed to build a vertical wall;
  • 2(2)(n) expose a party wall or party structure that was previously enclosed, subject to providing adequate weathering.

The full list is on legislation.gov.uk (section 2), and our Section 2 guide explains each right.

Typical demolition jobs and the notices they need

JobParty wall noticeNotes
Knocking down a semi or terraced house to rebuildParty structure notice; Section 6 for new foundationsThe shared wall stays and must be protected; a rebuild usually needs new foundations near the neighbour's
Demolishing an old rear extension built against the party wallParty structure notice if it is built into or exposes the wallExposed sections need weathering
Removing a garage that shares a wall with next door's garageParty structure noticeCheck whether the wall is a party wall or wholly one owner's
Taking down a conservatory fixed to the party wallOften a party structure noticeSee removing a conservatory built against a party wall
Detached outbuilding with no shared wallNone, unless excavation triggers Section 6Breaking out a deep slab near a neighbour's building can count

The exposed wall: weathering and protection

When you demolish your building, the party wall can suddenly become an external wall for your neighbour. The face that was inside your house is now open to rain and frost. The Act deals with this in two places:

  • Section 2(2)(n) lets you expose the wall only if you provide adequate weathering.
  • Section 7(3) says that where the neighbour's land or building is laid open, you must provide and maintain proper hoarding, shoring, fans or temporary construction for as long as needed, at your expense.

In practice that means temporary sheeting or boarding during the works, then a permanent finish if the wall stays exposed: render, repointing, new flashings at the junction with the neighbour's roof, and making good any openings, flues or fixings left in the wall. The award should say what the weathering is and who signs it off. Our page on temporary works and shoring covers protection during the job.

Flues and chimneys in the party wall

Party walls often carry chimney flues serving both houses. Where you demolish and rebuild a party structure under section 2(2)(e), section 2(4) requires you to carry up the neighbour's flues and chimney stacks that belong to it to an agreed height and in agreed materials, or as the surveyors decide. Section 2(3) sets a similar condition for underpinning, thickening or raising a wall when that is not needed because of a defect. Never cap, fill or cut a flue without establishing who it serves.

The separate demolition notice to the council

The Building Act 1984 has its own regime. Under section 80, anyone intending to demolish all or part of a building must normally give the local authority notice at least six weeks before starting. Councils explain that buildings of 50 cubic metres or less, internal demolition in an occupied building, and some greenhouses, conservatories, sheds and prefabricated garages are exempt. The council can then serve a section 81 notice requiring, for example, shoring of adjacent buildings, weatherproofing exposed surfaces and making good damage. Check your council's building control page for its form.

The two regimes run side by side: a section 80 notice does not replace party wall notices, and party wall notices do not replace section 80. Planning permission may also be needed for demolition in some cases, such as in a conservation area. See Party Wall Act vs planning vs building regulations.

Who pays

  • Demolition for your own project, including protection and weathering, is your cost (section 11(1)).
  • Where the neighbour's premises are laid open under section 2(2)(e), section 11(6) says you pay them a fair allowance for disturbance and inconvenience.
  • If the party wall is rebuilt because it is genuinely defective, cost may be shared by use and responsibility (section 11(5)). See who pays to repair a party wall.
  • Damage to the neighbour's property must be made good or compensated (section 7(2)).

A sensible sequence

  1. Survey the existing building: what is a party wall, what is a party fence wall, what is wholly yours.
  2. Get an engineer's demolition and temporary works method, especially for the shared wall.
  3. Serve party structure and Section 6 notices; give the council the section 80 notice.
  4. Agree a schedule of condition of the neighbour's side.
  5. Award agreed, including weathering and any temporary support.
  6. Demolish, protect, rebuild, weather, final inspection.

Frequently asked questions

Can I demolish my half of a party wall?

No. A party wall is shared structure, not two halves you can remove separately. You can demolish and rebuild it only under section 2, after notice, and you must keep it sufficient for the neighbour.

My neighbour demolished their extension and left my wall exposed. What can I do?

If the wall was a party wall enclosed by their extension, they should have served notice and provided adequate weathering. Write to them, take photos, and ask a surveyor about putting it right.

Does the council's demolition notice cover the neighbour?

No. It protects public safety and adjacent buildings in general terms. The party wall process deals with your neighbour's rights and damage.

Do I need a party wall notice to demolish a detached garage?

Not if it shares no wall and the demolition does not involve excavation caught by Section 6. If it shares a wall with next door's garage, it may well need one.

This page is general information about the Party Wall etc. Act 1996 (England and Wales). It is not legal advice. Every property and dispute is different, so take advice from a party wall surveyor or a solicitor before you act.

Download the Party Wall etc. Act 1996 free

Get the full, up-to-date text of the Act as a PDF from the official legislation.gov.uk record, with our plain-English guide to every section, sent straight to your inbox.

We use your email to send the Act. See our privacy notice.

Contact us

Send us a message and we'll reply by email.

We only use your details to reply to you. A quick human check runs when you send.