Who pays to repair a party wall?
If a party wall or party fence wall needs repair because it is defective or out of repair, the Act shares the cost between the owners in proportion to their use of the wall and, where both use it, their responsibility for the defect (section 11(4) and (5)). If the work is only for one owner's benefit, that owner pays. Disagreements about the split are settled by surveyors under section 10.
The starting rule, and the repair exception
Section 11(1) says the building owner, meaning the owner who wants to do the work, pays for work under the Act unless the section says otherwise. Repairs are the main exception:
- Section 2(2)(b) gives an owner the right to make good, repair, or demolish and rebuild a party structure or party fence wall that is defective or out of repair.
- Section 11(5) says the expenses of that work are shared between the owners in proportion to their use of the wall and, if both use it, their responsibility for the defect or disrepair.
- Section 11(4) applies the same sharing rule to underpinning, thickening or raising a wall under section 2(2)(a) where that work is needed because of a defect or want of repair.
You can read section 11 on legislation.gov.uk. GOV.UK's summary says you pay for work you start on a party wall, but the neighbour may share the cost if the work is needed because of defects or lack of repair (GOV.UK: reaching an agreement).
"Use" and "responsibility" in plain words
| Factor | What surveyors look at |
|---|---|
| Use | How much of the wall each owner relies on: does it enclose both houses to full height, or does one side only use the lower part as a garden boundary? |
| Responsibility | What caused the defect: a leaking gutter on one side, a tree on one side, a neighbour's past alterations, or simple age and weather affecting both equally. |
| Benefit | Any extra beyond a like-for-like repair (taller, thicker, better) is usually for the owner who wants it. |
Worked examples
A leaning garden wall
A brick garden wall astride the boundary is leaning from old age. It is a party fence wall used equally by both gardens, and neither side caused the problem. One owner serves a party structure notice to rebuild it. The surveyors award a 50:50 split of a like-for-like rebuild. If the owner wants it 300 mm taller, the extra height is theirs to pay.
A wall damaged from one side
The same wall is cracking because of a large tree in one garden. Use is equal, but responsibility lies mainly with the tree owner, so the surveyors could weight the cost towards them.
Repointing the upper part of a party wall
Two terraced houses share a wall, but one house is a storey taller and the upper part of the wall only encloses that house. Repointing the exposed upper section benefits only the taller house, so its owner is likely to pay that part. For repointing generally, see do I need a party wall surveyor to re-point a shared wall.
Repair that is really an upgrade
Underpinning a wall that is sound, so that you can dig a basement, is not repair. Section 11(1) puts the cost on the building owner. The sharing rules only apply where the work is needed because of a defect or want of repair.
How to get a neighbour to contribute
- Talk first. Show photos and a builder's quote. Many neighbours agree a split informally; put it in writing.
- Serve a party structure notice describing the repair and saying you consider it work under section 2(2)(b), with costs shared under section 11(5). The two-month notice period applies, and written consent allows an earlier start.
- If they dissent or stay silent, surveyors are appointed and decide the work and the cost split in the award. A silent neighbour can be dealt with through a 10-day request; see our 10-day notice template.
- After the work, if the neighbour has to pay part, section 13 lets you serve an account within two months of completion. They have one month to object. Section 17 makes sums payable under the Act recoverable as a civil debt.
- Consider security. Section 12(2) lets a building owner ask for security before starting where the neighbour must bear part of the cost.
What if it is an emergency?
If a wall is dangerous, the council's building control team can act under dangerous structures powers. Section 3(3)(b) says the Act does not require a party structure notice before you comply with a notice under statutory provisions about dangerous or neglected structures. Cost sharing can still be argued afterwards.
Insurance and storm damage
Buildings insurance may pay your share of repairing a shared wall after an insured event such as storm or impact. In a 2025 Financial Ombudsman decision we covered, an insurer had to pay its policyholders half the cost of rebuilding a jointly owned wall blown down in a storm: see storm felled shared boundary wall. Check your policy wording, and see does home insurance cover party wall damage.
When the Act does not help
- Timber fences are not party fence walls (the GOV.UK booklet says wooden fences are not included). Fence repairs follow your deeds and ordinary property law; see replacing a shared boundary fence.
- A wall wholly on one owner's land is not a party fence wall. The owner is responsible, and the neighbour has no section 11 share.
- Deeds and covenants may set out who maintains a wall, which can matter alongside the Act.
Frequently asked questions
Can I force my neighbour to repair their half of a party wall?
The Act does not make a neighbour start repairs. It lets you do the repair after notice and have the cost shared by use and responsibility, decided by surveyors if you disagree.
Who pays the surveyors for a repair award?
The surveyors decide under section 10(13). Where the work is a genuine shared repair, they may share their costs too, rather than putting them all on the owner who served notice.
My neighbour will not pay their share after the work. What now?
If the award or account fixes the sum, it is recoverable as a civil debt under section 17, usually through the small claims or county court.
Do I need a notice to repair my side only?
Minor work such as replastering may be too minor to need a notice. Structural repair, rebuilding or underpinning a party wall is notifiable under section 2.
This page is general information about the Party Wall etc. Act 1996 (England and Wales). It is not legal advice. Every property and dispute is different, so take advice from a party wall surveyor or a solicitor before you act.
Download the Party Wall etc. Act 1996 free
Get the full, up-to-date text of the Act as a PDF from the official legislation.gov.uk record, with our plain-English guide to every section, sent straight to your inbox.
We use your email to send the Act. See our privacy notice.