Party wall notice for a conservatory or orangery

You may need a party wall notice for a new conservatory or orangery, but not always. The Act cares about what you dig, where you build and what you touch, not about the glass. Excavating foundations within 3 metres of a neighbour's building and below its foundations needs a section 6 notice. Building on the boundary line needs a section 1 notice. Cutting into or raising a shared wall needs a section 2 notice. A conservatory set well in from the boundary, touching nothing shared, may need none.

Local Surveyor Match
1,920 listings across England and Wales, nearest first.

Why a conservatory is not automatically exempt

People often assume that a conservatory is "only glass" and falls outside the Act. Planning rules and building regulations treat conservatories differently from other extensions, but the Party Wall etc. Act 1996 does not. It regulates work on or near a neighbour's wall, foundations or boundary, whatever you build there.

An orangery is heavier than a typical conservatory. Brick or masonry walls, a solid or part-solid roof and a lantern mean deeper, wider foundations, which raises the chance of triggering section 6. Treat orangeries as extensions for party wall purposes. Our general guide to party wall rules for home extensions sets the wider background.

The Act does not cover planning permission, building regulations, rights of light or boundary ownership.

Which section applies: four common positions

Where you build Section Notice period What it means
Foundations dug within 3 m of a neighbouring building and deeper than its foundations, or within 6 m and below the 45-degree line Section 6 1 month Excavation near a neighbour's building
New wall on the line of junction, or wholly on your land with footings extending under theirs Section 1 1 month Boundary wall rules
Building against, cutting into, raising or loading an existing shared wall Section 2 2 months Work to a party structure or party fence wall
Fully inside your land, shallow footings, more than the distances above from any neighbouring structure, touching nothing shared None None No notice needed under the Act

You can need more than one: a conservatory dug close to a neighbour's garage and flashed into a shared wall could need section 6 and section 2 notices.

Foundations and section 6

Conservatory foundations are often modest, but modest is relative. What matters is the comparison with your neighbour's foundations. Section 6 applies when your excavation is:

  • within 3 metres, measured horizontally, of a building or structure belonging to the neighbour, and goes below the level of the bottom of its foundations; or
  • within 6 metres of it and cuts a plane sloping down at 45 degrees from the bottom outer edge of those foundations.

An example, with invented figures: the neighbour's house has foundations with a base 0.9 m below ground. Your conservatory sits 2.4 m from their rear wall, and the trench goes 1.0 m down. You are within 3 m and deeper than their foundations, so section 6 applies. If you moved the conservatory out to 3.5 m and kept the trench at 1.0 m, the 3-metre test no longer applies, and the 45-degree line at that distance is 0.9 m plus 3.5 m, about 4.4 m down, so you would not cut it either. You rarely know the neighbour's depth without a trial pit or a surveyor's help. See shallow neighbouring foundations explains why this matters.

Things that change the outcome:

  • Neighbouring outbuildings. Section 6 refers to a "building or structure" of the neighbour. A garage or substantial outbuilding close to your boundary can bring you inside the 3 metres even if their house does not. See party wall rules for detached houses for the garage point.

If section 6 applies, serve a notice at least a month before starting. It must say whether you plan to underpin or strengthen the neighbour's foundations, and be accompanied by plans and sections showing the excavation and the new structure. Your neighbour has 14 days to consent. If they do not reply in 14 days, they are treated as dissenting and a dispute is treated as having arisen. The notice lapses after 12 months if work has not started. See section 6 in detail.

Building right up to the boundary: section 1

Many conservatories are placed hard against the boundary to save garden space. If there is no existing wall on the line, section 1 applies:

  • Wholly on your land. You need to serve notice at least a month before starting if you are building a wall on the line of junction. You may place projecting footings and foundations below your neighbour's ground, but only between one and twelve months after notice, and you must compensate them for any damage the wall or footings cause.
  • Astride the boundary. That needs the neighbour's consent, given within 14 days of notice. If they do not consent, you must build wholly on your own land.
  • Footings under their land. Ordinary projecting footings are allowed where needed. "Special foundations" (the Act defines them as foundations using an assemblage of beams or rods to spread load, which includes steel-reinforced designs) need the neighbour's prior written consent (section 7(4)). Ask your surveyor whether your design counts.

Our page on section 1 and new walls on junction lines goes through the rules.

Building against a party fence wall

Plenty of gardens have a brick wall that stands astride the boundary. That is a "party fence wall" (a wall that is not part of a building, standing on land of two owners). Timber fences are not covered. If you build a conservatory side wall against such a wall:

  • Just standing next to it. If you build a freestanding side wall with a gap, touching nothing, there is no section 2 work. Leave enough gap for maintenance and for the structure to move.
  • Fixing to it, cutting into it or resting on it. Any of those is work to the wall. Section 2 gives you statutory rights, such as cutting into the wall to insert flashing, cutting away projections, or raising it, but you must serve notice, normally two months in advance. You must make good any damage, including to the wall where you cut for flashing.
  • Raising it. To increase the height of a party fence wall, section 2 allows it, with notice.
  • Weakness. Older garden walls often are not built to carry or brace a structure. Section 2 lets you demolish and rebuild a party fence wall that is defective, or too weak for your intended building, but you would be working under notice and the surveyors may need to settle the costs. Do not assume the wall will carry your load.

If the wall belongs wholly to your neighbour and sits entirely on their land, it is not a party fence wall, and you have no right to fix to it without their permission. The Act does not decide who owns a wall or where the boundary is. See garden walls and boundary fences.

Order of work and rough timings

  1. Measure the distance to every neighbouring building and outbuilding, and estimate foundation depth.
  2. Decide which sections apply, using the table above.
  3. Serve notices: one month for sections 1 and 6, two months for section 2.
  4. Allow the 14-day reply period; if the neighbour dissents or does not reply, surveyors are appointed.
  5. Agree the award, then start work after the notice period.

If neighbours consent in writing, an award may not be needed. If not, plan for several weeks before the award is agreed. Our timeline tool maps the steps.

Indicative costs

The Act sets no scale of fees, and published figures are commercial, not official. For an extension with excavation, a commercial guide (BookaBuilderUK, 2026) gives roughly £1,000 to £2,500 for an agreed surveyor and notes that two surveyors can exceed £3,000; BestBuilders (2026) puts a schedule of condition at roughly £300 to £700. Treat these as indicative and get quotes. Normally the building owner pays the reasonable surveyors' costs. See who pays the surveyor fees.

  • Ask for a schedule of condition of the neighbour's wall and garden before digging. Section 7(2) makes you liable to compensate for damage from work under the Act, so ask for a schedule first.

If you are replacing an old conservatory, see removing an external conservatory built against a party wall; that page covers demolition, this one covers building new.

Frequently asked questions

Do I need a notice for a conservatory or orangery?

Only if it triggers one of the Act's three types of work. That means digging within the 3 or 6-metre zones, building on the line, or working on a shared wall. A conservatory away from the boundary and touching nothing shared often needs none.

My conservatory stays 2 metres from the boundary. Do I still need a notice?

The test is distance to the neighbour's building, not to the boundary. If a building of theirs is within 3 metres of your trench and your trench goes deeper than their foundations, you need a section 6 notice.

Can my neighbour stop me building a conservatory?

Not through the Act. They can dissent, which triggers the surveyors' process, but the award regulates how the work is done, not whether you can build on your own land. Planning is separate, and so is any private right your neighbour may have over their land or light.

Can I build against my neighbour's garden wall?

Only if it is a party fence wall and you follow section 2, or you have the owner's permission. If it stands wholly on their land, you have no statutory right to fix to it.

What if my neighbour will not reply?

For section 3 (party structure) and section 6 notices, silence for 14 days counts as dissent. You then follow the section 10 process, which includes a request that lets you appoint a surveyor on their behalf if they ignore it for ten days.

Last updated: 4 November 2026. This page is general information about the Party Wall etc. Act 1996 (England and Wales). It is not legal advice. Every property and dispute is different, so take advice from a party wall surveyor or a solicitor before you act.

Download the Party Wall etc. Act 1996 free

Get the full, up-to-date text of the Act as a PDF from the official legislation.gov.uk record, with our plain-English guide to every section, sent straight to your inbox.

We use your email to send the Act. See our privacy notice.

Contact us

Send us a message and we'll reply by email.

We only use your details to reply to you. A quick human check runs when you send.