Party wall roofing work: which jobs need a notice
Re-covering your own roof does not need a party wall notice. Work that touches the wall between you and your neighbour does: raising it, building up a parapet, cutting a flashing into it, taking down a shared chimney stack, or resting new roof timbers on it. Those are section 2 rights under the Party Wall etc. Act 1996, and they need a party structure notice at least two months before you start (section 3).
The tiles are yours, but the wall they butt against may be shared. This page sorts roofing jobs by what the wall is asked to do, not by what the job is called.
The test: are you touching the wall?
The Act cares about party walls and party structures (section 20). In a terrace or semi, the wall between the houses usually runs up through the loft to the underside of the roof. Cutting into, adding to, taking down or loading that wall, or anything built into it, can fall under the Act. Your own slope, battens and tiles do not. If any of it needs to go onto the neighbour's side, you also need access arrangements under section 8.
Which roofing job triggers which notice
| Job | Act right | Notice | Period |
|---|---|---|---|
| Raising the party wall above the roof line | s.2(2)(a) (raise a party structure) | Party structure notice, s.3 | 2 months |
| Raising a party fence wall (a freestanding wall) | s.2(2)(l) | Party structure notice | 2 months |
| Cutting a chase for a lead or mortar flashing into the party wall | s.2(2)(f) (cut into a party structure for any purpose) | Party structure notice | 2 months |
| Cutting into the neighbour's wall for flashing against a wall you are building | s.2(2)(j) | Party structure notice | 2 months |
| Cutting back chimney breasts, jambs or flues that project from the party wall | s.2(2)(g) | Party structure notice | 2 months |
| Taking down a party wall that is too weak or low and rebuilding it | s.2(2)(e) | Party structure notice | 2 months |
| Building a new parapet on a new wall on the boundary line | s.1(2) | Line of junction notice | 1 month |
| Re-covering your own roof, replacing battens, felt, fascias, gutters on your side | None | None | n/a |
| Replacing your tiles up to, but not into, the wall | None | None | n/a |
One notice can list every right you need. Our guide to section 2 of the Party Wall Act explains the full list.
Parapets and raising the wall
A parapet is the part of the party wall that stands proud of the roof. Making it taller, or building one where there was none, is raising the wall. That is section 2(2)(a), and it needs a notice even if the extra brickwork sits wholly on your side of the centre line.
Reducing is covered too. Under section 2(2)(m) you can cut a wall down, or rebuild it lower, where your neighbour uses it only as a boundary wall. Section 2 then requires a parapet to be provided where that applies. Your neighbour can serve a counter notice to keep the existing height and pay for the difference (section 11(7)).
Flashings: the small job that is not small
Lead flashings and soakers usually sit in a groove cut into the brickwork. Cutting that groove into a party wall is "cutting into a party structure" under section 2(2)(f). The size of the cut does not change the rule. Light repointing of joints is a grey area; what decides it is whether you are cutting into the wall's fabric rather than just filling joints.
If you are only replacing an existing flashing in the same chase and not widening it, many surveyors treat that as maintenance. Others advise a notice anyway, because the wall is shared and a notice costs little. If you are unsure, ask a surveyor before the roofer starts.
Section 2(2)(j) is different. It lets you cut into your neighbour's wall to fit flashing where you build a wall against it. That arises when an extension's roof meets their wall.
Chimney stacks
A stack that sits on the party wall and serves both houses is shared. Taking part or all of it down is the area most likely to cause trouble, because your neighbour's flues may rely on it.
Section 2 lets you take down and rebuild a party structure that is too weak or low (s.2(2)(e)) and cut away projections such as breasts and flues (s.2(2)(g)). If you do, you must usually carry your neighbour's flues and stacks up in suitable materials, as the Act's supporting subsections set out. The details of removing the breast inside the house are in our chimney breast removal guide, so this page only covers the roofline.
If the stack stands wholly on your land and serves only your house, removing it is not a party wall job. What decides it is where it sits and what it serves.
Re-roofing a terrace
A full strip and re-tile of your own roof needs no notice. It changes if the wall head is rebuilt or deeply repointed, new upstands or fire-stopping are cut into the wall, or the scaffold needs the neighbour's garden. Terrace roof timbers often run continuously across the wall, so who owns what can be unclear. If a structure separates one building from the other, it can be a party structure. Photograph both roof spaces first.
Roof extensions on a shared slope
A roof extension, mansard, or rear dormer built on your slope is a planning and building regulations matter first. It becomes a party wall matter when it uses the party wall. Typical triggers are the steel or timber purlin bearing on the wall (section 2(2)(f)), raising the wall to enclose the new space (s.2(2)(a)), and flashing into the wall. Our loft conversion party wall guide covers those in detail, and the RSJ guide covers bearings.
Notice checklist
- Serve a party structure notice on every adjoining owner, including both sides if you are mid-terrace.
- State your name and address, describe the work, give the start date (section 3(1)).
- Allow at least two months from service to the start date.
- Keep proof of service. Our notice generator helps you draft one.
- Agree a schedule of condition of both roof spaces before work. See why you need one.
Typical sequence
- Serve notice on each owner.
- Within 14 days each neighbour consents in writing or is treated as dissenting (section 5). Written consent from every owner means no award; silence or dissent means surveyors must settle it.
- Appoint one agreed surveyor or two (section 10). They inspect and agree an award.
- Either owner can appeal to the county court within 14 days of service (section 10(17)).
- After the notice period, start work, giving 14 days' written notice for access (section 8).
- Final inspection; the surveyors close the award.
What it costs
No source gives a roofing-only fee, so use the loft figures as the nearest guide. HomeOwners Alliance (quoting Checkatrade) puts a loft conversion at about £900 to £1,200 for one agreed surveyor and £1,800 to £2,400 for two. BookaBuilderUK gives about £800 to £1,500 for an agreed surveyor and £1,800 to £3,000 where the neighbour appoints their own. Where the neighbour consents in writing and no award is needed, BestBuilders puts notices at about £50 to £150 each and BookaBuilderUK at £50 to £200. These are indicative and vary by region. The building owner normally pays reasonable fees of all surveyors (section 10(13), section 11). More in our surveyor cost guide.
Common mistakes
- Treating the flashing chase as "just roofing" and leaving it out of the notice.
- Serving only one side of a mid-terrace.
- Assuming a shared stack is yours because you own the pot.
- Scaffolding from next door's garden without 14 days' written notice.
- Starting early because "they said it was fine". Consent must be in writing (section 3(3)).
Frequently asked questions
Do I need a party wall notice to replace my roof?
Not for replacing your own tiles, felt and battens. You need one if the job cuts into, raises, rebuilds or loads the party wall, or takes down a shared chimney stack. The deciding point is contact with the shared wall, not the size of the roof job.
Do I need a notice to renew lead flashing on a party wall?
Usually yes if you are cutting a new or wider chase into the wall, because that is cutting into a party structure (section 2(2)(f)). Replacing like for like in the existing chase is more arguable. Ask a surveyor first, as a notice is cheap compared with a dispute.
Who pays if the new parapet damages my neighbour's ceiling?
You do. Section 7(2) requires the building owner to compensate any neighbour for loss or damage caused by work under the Act. Your surveyor's schedule of condition makes the damage easier to prove.
Related guides
Start with the loft conversion guide if the roof work is part of a conversion. For the neighbour's side, read our guide to rights of access. If you plan solar panels near the roofline, the rules differ.
Last updated: 4 November 2026. This page is general information about the Party Wall etc. Act 1996 (England and Wales). It is not legal advice. Every property and dispute is different, so take advice from a party wall surveyor or a solicitor before you act.
Roof extensions: dormers and mansards
A rear dormer on a terraced or semi-detached house usually means steels bearing on the party wall and often raising the wall to form the dormer cheek. Both are section 2 work under the Act: section 2(2)(f) for cutting into the wall to take the bearings, and section 2(2)(a) for raising it. A full mansard on a terrace usually raises the party walls on both sides by a full storey, so you will need to serve section 3 notice on both neighbours, two months ahead. Where the raised wall needs thicker or deeper foundations to carry the extra load, the surveyors will want structural calculations before agreeing an award.
Party wall upstands and fire separation
When a roof is replaced or raised, Building Regulations require the fire separation between the two houses to be continued up to the underside of the roof covering. If that means building up or altering the top of the party wall, it is party structure work and needs notice. If you are only re-covering your side of the roof and do not touch the wall, it does not.
Gutters and valleys between houses
Where two roofs meet over a party wall there is often a shared valley or parapet gutter. Replacing a shared gutter, or moving your side of it, can involve work to the party wall or to a shared structure, which is section 2 work. Works that merely clear or repair your own guttering do not need notice.
Solar panels and roof-mounted equipment
Panels fixed to your own roof slope usually involve no party wall work. Notice may be needed if fixings, conduit or brackets are cut into the party wall or parapet, or if the installation needs scaffolding on your neighbour's land: access is covered by section 8, which requires 14 days' notice to enter. See our guide to solar panels near a neighbour's roofline.
Scaffolding on or over next door
The Party Wall Act gives a right of access only for work done under the Act. It does not give a general right to put scaffolding on a neighbour's land or to oversail their roof with a crane or scaffold for other work. For those you need your neighbour's agreement, often in a written scaffold licence, or an order under the Access to Neighbouring Land Act 1992 for essential repairs. Our guide to scaffold licences and oversailing explains the difference.
Weather protection and making good
Section 2 of the Act makes many party structure rights conditional on making good damage to the adjoining premises, section 7 provides for compensation, and awards on roof jobs commonly set conditions for temporary weathering of the neighbour's roof while the wall is open. If you are the neighbour, ask your surveyor to make sure the award covers:
- temporary protection of your roof, loft and gutters when the wall is raised or opened up;
- who clears debris from your gutters and roof slopes;
- how and when the junction between the two roofs, including flashings, will be finished;
- a final inspection of the roof and loft space once the scaffold is down.
Common roofing jobs at a glance
| Job | Notice? |
|---|---|
| Re-tiling your own slope, no work to the wall | No |
| Replacing lead flashings chased into the party wall | Usually yes, section 3 (cutting into the wall) |
| Raising the party wall for a hip-to-gable or mansard | Yes, section 3 |
| Steels bearing on the party wall for a dormer | Yes, section 3 |
| Rebuilding a defective shared chimney stack | Yes, section 3, and costs may be shared under section 11 |
| Removing a chimney stack from the party wall | Yes, section 3; the neighbour's flues must not be affected |
| Solar panels fixed only to your own rafters | Usually no |
Download the Party Wall etc. Act 1996 free