Section 3 party wall notice: how a party structure notice works
A Section 3 party wall notice, which the Act calls a "party structure notice", is the formal notice you must serve on your neighbour at least two months before you do work to a wall, floor or other structure you share with them, such as cutting in steel beams, raising the wall or removing a chimney breast. It must give your name and address, describe the work and state the start date. If your neighbour doesn't consent in writing within 14 days, the law treats them as having dissented, and surveyors settle the matter.
What a party structure notice is for
Section 2 of the Party Wall etc. Act 1996 gives you a set of rights over shared structures. Section 3 is the gateway to those rights: you must serve a party structure notice before you exercise any of them (s.3(1)). The notice tells your neighbour what is coming, gives them time to get advice, and starts the clock on their options.
For the full list of rights, from raising and underpinning to cutting away projections, see our guide to every Section 2 right. This page is about the notice itself: when you need one, what goes in it, and what happens after you send it.
When you need a Section 3 notice
You need one whenever your project uses a Section 2 right on any of these:
- a party wall between your house and next door (semi-detached and terraced homes)
- a party fence wall, meaning a masonry garden wall that straddles the boundary
- a party structure, which includes the floor or ceiling between two flats with separate entrances (s.20)
Projects that typically need one:
| Project | What triggers the notice |
|---|---|
| Loft conversion | Steel beams or joists bearing into the party wall; raising the wall for a dormer or hip-to-gable |
| Kitchen knock-through in a terrace | Beam ends pocketed into the party wall |
| Chimney breast removal | Cutting away the breast from the party wall |
| Raising the party wall | Second-storey extension or dormer built on the shared wall |
| Damp proofing | Cutting in or injecting a damp proof course |
| Basement | Underpinning or extending the party wall downwards (usually with a Section 6 notice too) |
| Rebuilding a shared garden wall | Demolition and rebuild, or adding height |
You probably don't need one for small jobs such as fixing shelves, changing sockets or replastering. The GOV.UK booklet says minor work of that kind may not need a notice, though you should think about any effect on the wall's structure.
The two-month notice period
Section 3(2)(a) says the notice must be served at least two months before the date you intend to start. That is twice the one-month period for Section 1 boundary walls and Section 6 excavations, which is why loft conversions so often slip when the notice is left late.
You can start earlier only if your neighbour, and any occupier, agrees in writing (s.3(3)(a)). There is also an exception where you are complying with a council notice about a dangerous or neglected structure (s.3(3)(b)).
Plan backwards from your builder's start date. If the loft team arrives on 1 June, the notice needs to be with your neighbour by 1 April at the latest, and earlier still if you expect a dispute, because an award can take weeks.
What the notice must contain (s.3(1))
Section 3(1) requires three things:
- Your name and address as building owner. Where a property has joint owners, the booklet advises naming them all.
- The nature and particulars of the proposed work. Describe it clearly enough for your neighbour to understand what will happen to the wall. If the work involves special foundations (foundations with steel reinforcement to spread the load), the notice must also include plans, sections and details of construction, plus reasonable particulars of the loads they will carry (s.3(1)(b)).
- The date the work will begin, which can't be sooner than two months after service.
The booklet adds sensible extras: the address of the property where the work will be done, the date of the notice, and a clear statement that it is served under the Party Wall etc. Act 1996. No official form exists; the booklet includes an example letter. Plans aren't strictly required for ordinary work, but a simple drawing showing the beam positions or the extent of raising avoids misunderstandings and speeds up the reply.
Who to serve
Serve every adjoining owner of the structure. "Owner" in the Act includes freeholders, leaseholders with more than a year left, and buyers who have exchanged contracts. In a block or a converted house, that can mean the freeholder and one or more leaseholders. Our guide to leaseholders and freeholders covers this in detail. A mid-terrace project often means two neighbours, one for each side, each getting a notice that covers only the works to their wall.
How to serve
The booklet confirms service by hand or by post, or by email where the recipient has agreed to receive notices that way. Keep a copy and a record of the date you served it. One letter can cover more than one section: the booklet says the example letters may be combined where the work falls under more than one section.
Examples: three common Section 3 notices
Loft beams in a semi
You're converting the loft in a 1930s semi. Two steels will run front to back, each bearing on a padstone pocketed about 100 mm into the party wall. Your notice describes "cutting into the party wall to form bearings for two steel beams at second floor level, with padstones, and making good". You attach the engineer's layout drawing. Two months later, work can start, either on your neighbour's written consent or under an award.
Chimney breast removal in a terrace
You want to remove the ground-floor chimney breast in your living room, which projects from the party wall. The notice says you will cut away the breast on your side, support the remaining breast and stack above on steel or gallows brackets, and make good. Your neighbour may want to know whether their flue in the same stack will be affected. A surveyor will usually ask for the engineer's support details. See our chimney breast removal guide.
Raising the party wall for a dormer
A full-width rear dormer in a terrace means extending the party walls upwards. The notice describes raising each party wall by a set height and thickness. If your neighbour has flues in that wall, the Act requires you to carry them up to an agreed height and in agreed materials. Include that in the description so it isn't a surprise later.
Counter notices (s.4)
Once you've served a party structure notice, your neighbour may serve a counter notice within one month (s.4(2)(b)). It lets them ask for extra work for their own benefit:
- for a party wall or party fence wall: things like chimney copings, breasts, jambs, flues, piers or recesses that are reasonably needed for their convenience (s.4(1)(a));
- for special foundations they have agreed to: placing them deeper, or making them strong enough to carry loads from columns they plan for their own building (s.4(1)(b)).
The counter notice must spell out the works, with plans, sections and particulars (s.4(2)(a)). You must carry them out unless they would harm you, cause unnecessary inconvenience, or cause unnecessary delay (s.4(3)). Your neighbour pays for the extra works they asked for (s.11(9)). The booklet suggests they tell you within 14 days if they intend to serve one.
If you don't consent in writing to the counter notice within 14 days, a dispute is deemed to have arisen (s.5). So the 14-day rule runs both ways.
What happens if your neighbour doesn't reply (s.5)
This is where Section 3 differs most from a Section 1 notice. Under section 5, if your neighbour does not serve written consent within 14 days, starting on the day the notice was served, they are treated as having dissented, and a dispute is treated as having arisen. Silence is not consent.
What follows:
- Appoint surveyors (s.10(1)). You and your neighbour either agree on one surveyor or appoint one each. If you each appoint one, the two pick a third surveyor at the outset.
- If your neighbour won't engage. Serve a written request asking them to appoint a surveyor. If they haven't done so within 10 days, you may appoint one on their behalf (s.10(4)).
- The award. The surveyors settle the dispute by an award, which sets out how and when the work is done, records the condition of next door, and decides who pays the costs (s.10(10), (12), (13)).
- Appeal. Either owner can appeal to the county court within 14 days of being served with the award (s.10(17)).
- Start. You may start once the two-month notice period has run and the award is in place.
For a step-by-step version, see what happens if a neighbour ignores a party wall notice.
How long the notice lasts
A party structure notice lapses only if both things are true: the work hasn't begun within 12 months of service, and it isn't being pursued with due diligence (s.3(2)(b)). If your project slips by a year, expect to serve a fresh notice. See how long a party wall award is valid.
What it might cost
If your neighbour consents and no award is needed, the cost may just be the notice itself. Published notice-only prices run roughly £50–£200 per notice (BookaBuilderUK, June 2026), or nothing if you write it yourself. For a typical loft conversion that ends in an award, the HomeOwners Alliance (republishing Checkatrade figures) and BookaBuilderUK give about £800–£1,500 with an agreed surveyor, and £1,800–£3,000 where your neighbour appoints their own. These are indicative ranges, not quotes. See the party wall surveyor cost guide.
Frequently asked questions
Is a Section 3 notice the same as a Section 2 notice?
People say "Section 2 notice" loosely, but the notice is created by Section 3. Section 2 lists the rights; Section 3 sets out the notice you must serve before using them. In practice both phrases mean the same document: a party structure notice.
Can my neighbour refuse a party structure notice?
They can dissent, but they can't stop work the Act permits. Dissent, or no reply, simply leads to surveyors and an award, which governs how the work is done and protects their property. They can also serve a counter notice asking for extra works at their own cost.
Can I serve the notice myself?
Yes. No surveyor or solicitor is required to serve it, and there's no official form. It must contain what s.3(1) requires and be served properly. Use our free party wall notice templates or the notice generator, or read whether to draft your own notice.
My neighbour said yes verbally. Is that enough?
No. The Act asks for a notice of consent in writing. Without it, after 14 days the law treats your neighbour as having dissented. A friendly chat is a good start, but get the consent on paper, signed by every owner you served.
Does a party structure notice cover excavation as well?
No. Digging near next door's foundations needs a separate Section 6 notice, with one month's notice and plans and sections. You can send both in one letter, but each must meet its own requirements. See Section 6 excavation notices.
What if I change the design after serving the notice?
Section 7(5) says work must follow the plans and particulars agreed between owners or settled under section 10. A material change, such as more beams or a bigger opening, usually means telling your neighbour and, if needed, serving a fresh or amended notice.
Related guides
- Section 2: every right over an existing party wall
- Loft conversion party wall rules
- Party wall notice consent vs acknowledgement
- The party wall timeline flowchart
Last updated: 4 November 2026. This page is general information about the Party Wall etc. Act 1996 (England and Wales). It is not legal advice. Every property and dispute is different, so take advice from a party wall surveyor or a solicitor before you act.