Sample party wall award, explained clause by clause
A party wall award is the document in which the surveyors set out what work may be done, how and when, and who pays. The Act prescribes no form for it, so real awards vary in layout and length. This page walks through an invented example, clause by clause, so you can see what each part does and what to check before you accept it.
This is an illustrative example written for this site. The people, addresses and figures are fictional ("1 and 3 Example Road"). It is not a template to copy, it is not taken from any real award, and a real award must be prepared by your surveyors for your particular works.
What the Act says an award can do
Under section 10(12), an award may decide the right to carry out the work, the time and manner of doing it, and any other incidental matter, including the costs of making the award. Section 10(13) says the reasonable costs of the award, of reasonable inspections of the work and of other things arising from the dispute are paid by whichever parties the surveyors decide. The booklet describes four parts: parties and sections, the works, the owners' rights and duties, and the conclusion. The sample follows that order.
The scenario
Ms A. Builder owns 1 Example Road and plans a rear extension plus a steel beam in the party wall for a loft. Mr B. Neighbour owns 3 Example Road, the semi-detached house next door. Ms Builder served notices; Mr Neighbour dissented and appointed his own surveyor. Two surveyors made this award and agreed, so no third surveyor was needed.
The sample award
Heading and parties
PARTY WALL AWARD under the Party Wall etc. Act 1996 Between Ms A. Builder of 1 Example Road, Sampletown ("the Building Owner") and Mr B. Neighbour of 3 Example Road, Sampletown ("the Adjoining Owner") Concerning the party wall and adjacent excavation at 1 and 3 Example Road ("the Property")
What it does: names the owners and the property and says which Act applies. It also fixes who is "Building Owner" and who is "Adjoining Owner" for the rest of the document.
What to check: your name and address are right, and your legal interest is stated correctly (freeholder, leaseholder). If a mortgage lender or freeholder also has an interest, ask the surveyors whether they should have been served.
Appointment of surveyors
1. The Building Owner has appointed Surveyor One of Example Surveying Ltd. The Adjoining Owner has appointed Surveyor Two of Sample Chartered Surveyors. Each appointment was made in writing.
What it does: records that a dispute arose (here, the neighbour's dissent) and who was appointed. Section 10(2) says appointments are made in writing and cannot be rescinded.
What to check: the right surveyor is named for you. With one agreed surveyor, this clause says so.
Notices
2. The Building Owner served notice under section 3 dated 4 March 2027 and notice under section 6 dated 4 March 2027. The Adjoining Owner replied by letter dated 10 March 2027 dissenting from both notices and appointing Surveyor Two.
What it does: lists the notices the award rests on, with dates. An award should only deal with works those notices cover.
What to check: dates match your copies and the notice type matches the work: excavation is section 6, the beam is a party structure notice. See what is a party structure. If your neighbour served a counter notice, which the Act allows within one month, it should be listed here too.
The works
3. The Building Owner may, in accordance with the drawings numbered EX-01 to EX-05 dated February 2027 attached as Schedule 1: (a) cut into the party wall to insert a steel beam of the size and at the positions shown; (b) excavate for strip foundations for a single-storey rear extension to the depth shown; and (c) make good the party wall, plaster and finishes.
What it does: this is the core permission. It lists exactly what may be done and ties it to attached drawings.
What to check: the drawings are the ones you saw; beam size and bearing positions are stated; depth and distance of excavation are shown; the extension footing does not project under your land without your written consent (section 7(4) bars special foundations on your land without it). If your neighbour's builder later wants to change the design, the revision needs agreement or a further award (section 7(5)).
Time and hours
4. The works shall start within twelve months of the notice dates. Work shall be carried out between 08:00 and 18:00 on weekdays and 08:00 and 13:00 on Saturdays, and not on Sundays or bank holidays.
What it does: section 10(12) lets the award set the time and manner. This clause limits start time and working hours.
What to check: the hours suit your household. Noise is the commonest friction point, so negotiate now.
Method and protection
5. The Building Owner shall: (a) provide proper temporary support to the party wall while the opening is formed; (b) protect the Adjoining Owner's property with dust sheeting and a sealed screen where the party wall is exposed; (c) remove debris daily; and (d) make good all damage caused to the Adjoining Owner's premises, including internal decorations, caused by the works.
What it does: these are the manner-of-work duties. They echo the Act's protection duty in section 7(3) and the making-good duties in section 2.
What to check: specifics. "Protect the property" is weak; "install a sealed dust screen" is enforceable.
Access
6. The Building Owner shall give the Adjoining Owner not less than fourteen days' written notice before entering 3 Example Road, except in an emergency, when notice shall be as soon as reasonably practicable. Access shall be during usual working hours.
What it does: repeats the section 8 right of entry and its 14-day rule. Surveyors also have entry rights under section 8.
What to check: the purpose of access is named (scaffold, flashing a roof junction). See rights of access under the Act.
Schedule of condition
7. A schedule of condition of 3 Example Road, comprising a written record and photographs of the party wall, adjoining rooms and rear garden, has been prepared by Surveyor Two on 20 March 2027 and is annexed as Schedule 2. It shall be the record against which any alleged damage is measured.
What it does: fixes the "before" picture. If damage is alleged, this is the benchmark.
What to check: every affected room is covered, with dated, clear photographs. The booklet strongly recommends a schedule; see what a schedule of condition covers has a checklist.
Damage and compensation
8. If damage arises from the works, the Building Owner shall make it good to a standard equivalent to its condition shown in Schedule 2. If the Adjoining Owner so requires, the cost shall be determined by the Surveyors and paid to him in lieu of making good.
What it does: combines the compensation duty in section 7(2) with the payment-instead option in section 11(8). It is the clause you will rely on if something cracks.
What to check: it refers to the schedule as the benchmark, and it covers both repair and payment. See the claim route in practice and the insurance angle in does home insurance cover party wall damage.
Security for expenses
9. The Adjoining Owner has not required security under section 12. [Alternative if required: The Building Owner shall deposit £[amount] with Surveyor Two before work begins.]
What it does: records whether security has been asked for. Section 12 lets an adjoining owner require security before work starts, with the amount agreed or settled under section 10.
What to check: if you fear a half-finished job, ask about security before the award is signed. See security for expenses.
Costs
10. The Building Owner shall pay the reasonable fees of both Surveyors in connection with this Award, including inspections of the works, within 28 days of invoice. Each Surveyor's fee for the Award itself is fixed at the figure stated in his letter of appointment.
What it does: uses section 10(13) to allocate costs. The booklet says the building owner usually pays the award costs where the works are solely for their benefit.
What to check: what "reasonable" covers, any cap on inspections, and the payment date. See who pays the surveyor fees.
Completion and further matters
11. On completion the Building Owner shall notify the Surveyors, who may inspect. Either Surveyor may make a further award on any matter arising out of the works.
What it does: sets up the end-of-job inspection and keeps the surveyors' powers alive for later issues. Our guide to what happens after the works finish covers what follows.
What to check: the clause exists; if not, ask for a completion inspection in writing.
Appeal
12. This Award is conclusive except as provided by section 10(17). Either party may appeal to the county court within fourteen days of being served with it.
What it does: reminds the parties of the appeal right. Section 10(16) says the award is conclusive and cannot be questioned in any court except as the section allows, and section 10(17) gives 14 days from service.
What to check: the date of service; the 14 days run from service, not the date on the document. The booklet warns that an unsuccessful appeal can cost you. See how to appeal in the county court.
Signatures
Signed __ Surveyor One __ Surveyor Two. Dated 28 March 2027.
What it does: the award takes effect when made and served; under section 10(14), where two surveyors make it, they must serve it on the parties immediately.
What to check: both signatures, a date, and all schedules attached.
Frequently asked questions
Is there an official party wall award template?
No. The Act prescribes no form; the surveyors draft the award. Our free notice templates are for notices, not awards.
Is a signed award the same as a party wall agreement?
People use the words loosely. An award is the formal document made by surveyors under section 10. An agreement or consent is something owners sign between themselves. See what is a party wall agreement.